BRR : 2151841
Click Here To View Tendering Authority. Aoc City/State :  AMBALAMEDU, Kerala
Tender Brief : Pre-Fabrication And Erection Of Sulphuric Acid Lines In Connection With Replacement Of In Ci Lines Of Fat Pumping Lines And Sa Pumping Lines From Sap To Pap , Fact-Cd . , Pre-Fabrication And Erection Of Sulphuric Acid Lines In Connection With Replacement Of In Ci Lines Of Fat Pumping Lines And Sa Pumping Lines From Sap To Pap , Fact-Cd . , Fabrication Of Pipeline And Fittings With Ss 316 L Materials Size 80Nb To 400 Nb For Replacing Ci Pipes And Fittings In Fat Pumping Lines And Sa Pumping Line From Sap To Pap , Fact-Cd . Work Involves:- The Required Materials Shall Be Tra... Read More
Tender Value
Ref. Document
Contract Value
₹ 6,36,350
Submission Date
18-03-2020
Contract Date
26-03-2020
Completion Date
180 days
Participated Bidder List
7 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 7,94,000 L5
2 cnet-technologies Bid Analytics 7,13,000 L2
3 cnet-technologies Bid Analytics 9,40,000 L7
4 cnet-technologies Bid Analytics 8,63,700 L6
5 cnet-technologies Bid Analytics 6,36,350 L1
6 cnet-technologies Bid Analytics 7,32,500 L3
7 cnet-technologies Bid Analytics 7,73,000 L4
Work Detail
pre-fabrication and erection of sulphuric acid lines in connection with replacement of in ci lines of fat pumping lines and sa pumping lines from sap to pap , fact-cd . , pre-fabrication and erection of sulphuric acid lines in connection with replacement of in ci lines of fat pumping lines and sa pumping lines from sap to pap , fact-cd . , fabrication of pipeline and fittings with ss 316 l materials size 80nb to 400 nb for replacing ci pipes and fittings in fat pumping lines and sa pumping line from sap to pap , fact-cd . work involves:- the required materials shall be transported from store / site . new pipes , fitting , special fittings etc . shall be fabricated with ss 316 l material . the required mitre bends / mitre fittings shall also be fabricated if required to suit the site conditions in ss 316l material . elbows , tees and reducers shall be fabricated in addition as required at site in ss316l material . the pipes shall be cut by plasma cutting machine , length as per instructions from engineer in charge . pipe ends shall be ground properly and take suitable bevel / single vee . the pipes / fittings / mitres shall be fabricated by tig welding ( with argon purging ) with stub ends and ms flanges / welded ss 316l flanges . all welding shall be 100% dp tested . pipes shall be in pieces or in full pipe length as per instructions from engineer in charge . , erection of fabricated ss 316 l pipe and fittings . work involves:- make necessary site arrangements for the work . the newly fabricated ss 316 l pipe lines with fittings shall be transported to site . the ss 316 l pipes with fittings shall be erected / fixed in position at all elevations with proper gaskets and fasteners / welding pipe joint at site . flange joints shall be tightened properly to avoid any leakage . temporary supports shall be provided as required . the route / orientation of the pipelines shall be as per approved drawings / site instructions . any pipelines joint requires welding at site shall be done by tig welding only after proper bevelling of joints . the pipelines shall be erected without any strain . any rework required shall be done . all welding joints shall be 100% dp tested . pipelines shall be erected along side existing lines and necessary supports shall be provided and during ata / shutdown connections shall be given . after complete erection entire pipeline circuit shall be successfully leak tested . site shall be cleared off scrap , unused pipes shall be neatly stacked in the area earmarked . , fabrication and erection of pipeline supports . work involves:- collection of required materials from fact -cd stores / plant area and transport to the work site at sa plant . new structural supports for pipelines / pipe bridges / saddle supports etc . shall be fabricated and erected at site as per relevant drawing / instruction of the officer - in -charge to meet site requirement . , dismantling and removal of pipelines / structurals . work involves:- the existing cs / ci pipelines [ all sizes ] and structural supports , pipe bridges shall be cut and removed from all heights and elevations as per the instructions from engineer in charge to facility erection and rerouting of cooling water and acid headers . damaged pipes shall be transported to scrap yard , after taking the weight and deposited in the appropriate areas ear marked for different materials . usable materials shall be transported to specific locations and neatly stacked as per instruction .
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 82cb9172-5f68-4ed3-ae4c-0c964e097bfb
Download File Name File Description
Download SpecialConditions Tender Documents - Special conditions
Download Tendernotice_1 Tender Documents - NIT
Download BOQ_575536 Tender Documents - BOQ
Download TenderDocumentR1 Tender Documents - Tender documents
Download C82F126B-2AC8-458B-96A6-F144AF2E0B5B Tender Documents - Tender Notice
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000