BRR : 7878657
Click Here To View Tendering Authority. Aoc City/State :  panipat, Haryana
Tender Brief : Supply Of Pipes-Ss_As (Welded) Supply Of Pipes-Ss_As (Welded) For P25 Project At Iocl Panipat Refinery , Supply Of Pipes -Ss Welded To A 358 , Pipe,Efw,Ss, B36.19M, Bw Ends,Sch 10S, Efw, Weld Factor E = 1.00, Pipe A358 Tp304 Cl.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Efw,Ss, B36.19M, Bw Ends,Sch 10S, Efw, Weld Factor E = 1.00, Pipe A358 Tp316 Cl.1, Add. Information, 1.For General Technical Requirements, Refer Doc. 6745-Pip-000-Ec-0001 , Pipe,Efw,Ss, B36.19M, Bw Ends,Sch 10S, Efw, Weld Factor E = 1.00, Pipe A358 Tp316 Cl.1, Add. Informa... Read More
Tender Value
Ref. Document
Contract Value
₹ 3,16,85,198
Submission Date
18-07-2024
Contract Date
29-08-2025
Completion Date
120 days
Participated Bidder List
12 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics
2 cnet-technologies Bid Analytics
3 cnet-technologies Bid Analytics L1
4 cnet-technologies Bid Analytics L1
5 cnet-technologies Bid Analytics L1
6 cnet-technologies Bid Analytics 1,24,64,806 L1
7 cnet-technologies Bid Analytics
8 cnet-technologies Bid Analytics
9 cnet-technologies Bid Analytics L1
10 cnet-technologies Bid Analytics 1,92,20,392 L1
11 cnet-technologies Bid Analytics L1
12 cnet-technologies Bid Analytics
Work Detail
supply of pipes-ss_as (welded) supply of pipes-ss_as (welded) for p25 project at iocl panipat refinery , supply of pipes -ss welded to a 358 , pipe,efw,ss, b36.19m, bw ends,sch 10s, efw, weld factor e = 1.00, pipe a358 tp304 cl.1, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,ss, b36.19m, bw ends,sch 10s, efw, weld factor e = 1.00, pipe a358 tp316 cl.1, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,ss, b36.19m, bw ends,sch 10s, efw, weld factor e = 1.00, pipe a358 tp316 cl.1, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , supply of pipe-welded alloy steel , pipe,efw,as, b36.10m, bw ends,sch std, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.5cr cl.42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,as, b36.10m, bw ends,sch std, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.5cr cl.42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,as, b36.10m, bw ends,sch xs, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.5cr cl.42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,as, b36.10m, bw ends,sch xs, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.5cr cl.42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,as, b36.10m, bw ends,sch non-std, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.5cr cl.42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,as, b36.10m, bw ends,sch non-std, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.5cr cl.42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,as, b36.10m, bw ends,sch non-std, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.5cr cl.42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,as, b36.10m, bw ends,sch xs, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.9cr cl.42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,as, b36.10m, bw ends,sch xs, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.9cr cl.42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001 , pipe,efw,as (h2 ser.), b36.10m, bw ends,sch 30, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.1 1/4cr cl42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001, 2.additional requirements for h2 service, acc. to doc. 6745-pip-000-ec-0004 , pipe,efw,as (h2 ser.), b36.10m, bw ends,sch xs, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.1 1/4cr cl42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001, 2.additional requirements for h2 service, acc. to doc. 6745-pip-000-ec-0004 , pipe,efw,as (h2 ser.), b36.10m, bw ends,sch xs, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.1 1/4cr cl42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001, 2.additional requirements for h2 service, acc. to doc. 6745-pip-000-ec-0004 , pipe,efw,as (h2 ser.), b36.10m, bw ends,sch non-std, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.1 1/4cr cl42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001, 2.additional requirements for h2 service, acc. to doc. 6745-pip-000-ec-0004 , pipe,efw,as (h2 ser.), b36.10m, bw ends,sch non-std, efw, normalized & tempered, radiography shall be done, after stress relieving, 100% radiography, weld factor e = 1.00, pipe a691 gr.1 1/4cr cl42, add. information, 1.for general technical requirements, refer doc. 6745-pip-000-ec-0001, 2.additional requirements for h2 service, acc. to doc. 6745-pip-000-ec-0004 => limited
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download 6662fcc7-8584-4064-a816-da468320c9d1
Download 3_AOC_Comment_PI89
Download boqcomparativechart
Download finsummary_188656
Download techsummary_188656
Download File Name File Description
Download 3b06c161-e041-49a6-8e3f-7c4eabba7cf1 Tender Documents
Download Bidders_help_Document_for_1 Tender Documents
Download Bid_Documents_PI89 Tender Documents
Download BOQ_188656 Tender Documents
Download Checklist_PI89 Tender Documents
Download Commercial_Documents Tender Documents
Download FAQs-IOCL-Online-EMD Tender Documents
Download Special_Instructions_to_t_2 Tender Documents
Download Technical_Documents Tender Documents
Download Tech_Spec_Confirmation_Sh_3 Tender Documents
Download Tender-Acceptance-Format Tender Documents
Download Tendernotice_1 Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000