BRR : 30857
Click Here To View Tendering Authority. Aoc City/State :  EE EUDD-III BAREILLY, Uttar Pradesh
Tender Brief : Tender For Different Work Under Full Deposited Fund -2020-21 Under Eudd-Iii, Bareilly-1 For The Wok Of Supply For New Connection 28 Kva ( 25 Kw ) ( Lmv-7 ) To Shri Rajesh Yadav Veersavarkar Nagar Near Nageshwar Tample Under Full Deposited Fund -2020-21 Under Eudd-Iii, Bareilly Under Eudc, Bareilly. 1.01 Safe Carriage Of Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. A- St Pole 11 Mtr. Long – 07 Nos. B Acsr Rabbit Conductor -800 Mtr. Nc- 63 Kva T / F New-01 Nd- Other Line Materials- 850 Kgs N 1.02 Erection Of D / Pole Including Digging Of Pit & Gr... Read More
Tender Value
Ref. Document
Contract Value
₹ 1,99,850
Submission Date
29-01-2021
Contract Date
03-03-2021
Completion Date
30 days
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 1,99,850 L1
2 cnet-technologies Bid Analytics 2,27,700 L3
3 cnet-technologies Bid Analytics 2,20,620 L2
Work Detail
tender for different work under full deposited fund -2020-21 under eudd-iii, bareilly-1 for the wok of supply for new connection 28 kva ( 25 kw ) ( lmv-7 ) to shri rajesh yadav veersavarkar nagar near nageshwar tample under full deposited fund -2020-21 under eudd-iii, bareilly under eudc, bareilly. 1.01 safe carriage of materials from central c.b. ganj to work site including loading & unloading. a- st pole 11 mtr. long – 07 nos. b acsr rabbit conductor -800 mtr. nc- 63 kva t / f new-01 nd- other line materials- 850 kgs n 1.02 erection of d / pole including digging of pit & grouting work complete and fitting of all accessories complete n 1.03 erection of st pole including digging of pit & grouting work complete and fitting of all accessories complete. 1.04 earthing of st pole 1.05 mounting of and installation of 63 kva t / f on d / pole along with making all connections 1.06 sagging and stringing of rabbit conductor 1.07 earthing t / f upto water level with gi pipe of 1.5” dia. including mild steel strip size 35x6 mm. ( material will be supplied by contractor ) . 1.08 erection and fixing stay set complete. 1.09 fixing of associated items i.e dropper channel-01, disc insulator-12, t-off channel- 01, top channel-01, 11 kv pin insulator with pin-15 no., 11 kv cross arm-04, lt distribution box-01 no. etc. 2 for the wok of supply for new connection 34 kva ( 30 kw ) ( lmv-7 ) to shri rupesh kr. yadav gosai gautiya bareilly under full deposited fund -2020-21 under eudd-iii, bareilly under eudc, bareilly. 2.01 safe carriage of materials from central c.b. ganj to work site including loading & unloading. a- st pole 11 mtr. long – 02 nos. b acsr rabbit conductor -200 mtr. nc- 63 kva t / f new-01 nd- other line materials- 650 kgs. 2.02 erection of d / pole including digging of pit & grouting work complete and fitting of all accessories complete. 2.03 earthing of st pole 2.04 mounting of and installation of 63 kva t / f on d / pole along with making all connections 2.05 sagging and stringing of rabbit conductor 2.06 earthing t / f upto water level with gi pipe of 1.5” dia. including mild steel strip size 35x6 mm. ( material will be supplied by contractor ) . 2.07 erection and fixing stay set complete. 2.08 fixing of associated items i.e dropper channel-01, disc fitting-12, disc insulator-12, t-off channel- 01, top channel-01, 11 kv pin insulator with pin-15 no., 11 kv cross arm-04, lt distribution box-01 no. etc. 3 for the wok of supply for new commercial connection 27 kw to smt. seema vishnoi w / o neeraj vishnoi jagatpur near vestal restaurant bareilly under full deposited fund -2020-21 under eudd-iii, bareilly under eudc, bareilly. 3.01 safe carriage of materials from central c.b. ganj to work site including loading & unloading. a- st pole 11 mtr. long – 02 nos. b acsr dog conductor -30 mtr. nc- 11 kva xlpe cable ( 3x70 sqmm. ) 250 mtr. nd- 11 kv xlpe cable jointing kit ( 3x70 sqmm ) o / d- 04 no. ne- 63 kva t / f- 01 no. nf- lt distribution box 3 phase- 01 no. nd- other line materials- 700 kgs n 3.02 erection of d / pole including digging of pit & grouting work complete and fitting of all accessories complete. 3.03 earthing of st pole 3.04 mounting of and installation of 63 kva t / f on d / pole along with making all connections 3.05 sagging and stringing of 30 mtr dog conductor 3.06 laying of 11 kv xlpe cable ( 3x70 sqmm ) 3.07 erection and fixing 11 kv xlpe cable jointing kit ( 3x70 sqmm ) o / d 3.08 fixing of associated items i.e dropper channel-01, disc fitting-06, disc insulator-06, t-off channel- 01, top channel-01, 11 kv pin insulator with pin-06 no., 11 kv cross arm-04, lt distribution box-01 no. etc.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download e6aaf631-79a2-4dc4-9e67-01505b4442e3
Download File Name File Description
Download BOQ_831947 Tender Documents - BOQ
Download 4D28ACD0-DB74-4F2B-9A46-1A051DE8438A Tender Documents - Tender Notice
Download Tendernotice_1 Tender Documents - TENDER NOTICE
Download Tender_form Tender Documents - TENDER FORM
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders