BRR : 103079
Tender Brief : The Different Work Under Full Deposited Fund -2020-21 Under Eudd-Iv , Bareilly .-1 For The Wok Of Supply For New Connection 09 Kw ( Lmv-6 ) To Smt. Champa Devi W / O Shri Lala Ram Dohara Road Near Fouji Ata Chakki Under Full Deposited Fund -2020-21 Under Eudd-Iv, Bareilly Under Eudc, Bareilly. 1.01 Safe Carriage Of Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. A- St Pole 11 Mtr. Long – 02 Nos. B Acsr Weasel Conductor -60 Mtr. Nc- 25 Kva T / F New-01 Nd- Other Line Materials- 450 Kgs N 1.02 Erection Of D / Pole Including Digging Of Pit & Gro... Read More
Tender Value
₹
Ref. Document
Contract Value
₹ 1,52,340
Submission Date
14-01-2021
Contract Date
12-03-2021
Completion Date
30 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 1,55,970 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 1,57,541 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 1,52,340 | L1 |
Work Detail
the different work under full deposited fund -2020-21 under eudd-iv , bareilly .-1 for the wok of supply for new connection 09 kw ( lmv-6 ) to smt. champa devi w / o shri lala ram dohara road near fouji ata chakki under full deposited fund -2020-21 under eudd-iv, bareilly under eudc, bareilly. 1.01 safe carriage of materials from central c.b. ganj to work site including loading & unloading. a- st pole 11 mtr. long – 02 nos. b acsr weasel conductor -60 mtr. nc- 25 kva t / f new-01 nd- other line materials- 450 kgs n 1.02 erection of d / pole including digging of pit & grouting work complete and fitting of all accessories complete. 1.03 earthing of st pole 1.04 mounting of and installation of 25 kva t / f on d / pole along with making all connections 1.05 sagging of 60 mtr weasel conductor for jumpering 1.06 erection and fixing stay set complete 1.07 fixing of associated items i.e top channel-01, 11 kv pin insulator with pin-09 no., etc. 2 for the wok of supply for tc connection 35 kw to m / s unity aurum construction pvt. ltd, c / o shri sushil kumar upadhay dohara road bareilly under full deposited fund -2020-21 under eudd-iv, bareilly under eudc, bareilly. 2.01 safe carriage of materials from central c.b. ganj to work site including loading & unloading. a- st pole 11 mtr. long – 02 nos. b 11 kv xlpe cable ( 3x70 sqmm ) - 15 mtr. nc- 63 kva t / f new-01 nd- 11 kv cable jointing kit o / d- 02 no. nd- other line materials- 450 kgs. 2.02 erection of d / pole including digging of pit & grouting work complete and fitting of all accessories complete. 2.03 earthing of st pole 2.04 mounting of and installation of 63 kva t / f on d / pole along with making all connections 2.05 laying of 15 mtr 11 kv xlpe cable ( 3x70 sqmm ) 2.06 erection and fixing stay set complete. 2.07 erection and fixing 11 kv cable jointing kit o / d 2.08 installation of 3 phase meter 2.09 fixing of associated items i.e top channel-01, 11 kv pin insulator with pin-09 no. etc. 3 for the work of shifting or 11 kv line from the plote of abhay prathap singh ashok vihar pilibhit by pass behind bajrang dhava bareilly under full deposited fund -2020-21 under eudd-iv, bareilly under eudc, bareilly. 3.01 safe carriage of materials from central c.b. ganj to work site including loading & unloading. a- 11 kva xlpe cable ( 3x70 sqmm. ) 60 mtr b- 11 kv xlpe cable jointing kit ( 3x70 sqmm ) o / d- 02 no n 3.02 laying of 11 kv xlpe cable ( 3x70 sqmm. ) 3.03 erection and fixing cable jointing kit ( 3x70 sqmm ) o / d 4 for the wok of electrification of m / s kuber homes, awasiya colony park pilibhit by pass road bareilly under full deposited fund -2020-21 under eudd-iv, bareilly under eudc, bareilly. 4.01 safe carriage of materials from central c.b. ganj to work site including loading & unloading. a- st pole 11 mtr. long – 02 nos. b pcc pole- 08 no. nc- 03 phase distribution box-06 no. nd- lt abc cable ( 3x120+1x95+1x60 sqmm ) - 325 mtr ne- acsr weasel conductor-80 mtr nf- new 100 t / f- 01 no . nd- other line materials- 650 kgs. 4.02 erection of d / pole including digging of pit & grouting work complete and fitting of all accessories complete. 4.03 sagging of lt abc cable ( 3x120+1x95+1x60 sqmm ) 4.04 sagging of 80 mtr acsr weasel conductor for jumpering 4.05 mounting of and installation of 100 kva t / f on d / pole along with making all connections 4.06 earthing of st pole 4.07 erection of pcc pole including digging of pit & grouting work complete and fitting of all accessories complete. 4.08 erection of stay set complete 4.09 erection and fixing 3 phase distribution box along with making all connection 4.1 fixing of associated items i.e top channel-01, 11 kv pin insulator with pin-06 no., disc insulator-06 no., disc fitting- 06 no. pearsing connector-24 etc
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | 14f8e81a-0115-422c-87d0-b5ac6bb96de9 |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000
Similar Tenders Results