BRR : 4681916
Tender Brief : Tender For Different Electrification Works Under Full Deposit Scheme-2024-25 Under Eudd-Iii Bareilly, 1 For the work of Shiting of 100 KVA T/F with Structure on request Shri Prem Babu Sharma, Rajendra Nagar ,Bareilly under Full deposited fund-2024-25 under EUDD-III, Bareilly. 2 Safe Carriage of Following materials from Central C.B. Ganj to work site including loading & unloading. 3 ST PoLe (11 Mtr. Long) 4 11 KV XLPE Cable (3X185 sqmm) 5 11 KV Cable Jointing Kit (3X185 sqmm) O/D . 6 Distribution Box ( 03 Phase) 7 Stay Set 8 AB Cable (3x120 sqmm) 9 Other Line materails 10 Erection Wo... Read More
Tender Value
₹
2,80,000
Contract Value
₹ 2,79,905
Saving / Difference
₹ 95
▲
Submission Date
25-07-2024
Contract Date
08-08-2024
Completion Date
180 days
Participated Bidder List
3 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | 2,79,949 | L2 | |||
| 2 | cnet-technologies | Bid Analytics | 2,83,750 | L3 | |||
| 3 | cnet-technologies | Bid Analytics | 2,79,905 | L1 |
Work Detail
tender for different electrification works under full deposit scheme-2024-25 under eudd-iii bareilly, 1 for the work of shiting of 100 kva t/f with structure on request shri prem babu sharma, rajendra nagar ,bareilly under full deposited fund-2024-25 under eudd-iii, bareilly. 2 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 3 st pole (11 mtr. long) 4 11 kv xlpe cable (3x185 sqmm) 5 11 kv cable jointing kit (3x185 sqmm) o/d . 6 distribution box ( 03 phase) 7 stay set 8 ab cable (3x120 sqmm) 9 other line materails 10 erection work 11 dismentling of existing d/pole and safe back caariege from site to c.b. ganj central store , bareilly 12 erection ofnew st d/pole including digging of pit & grouting work complete and fitting of all accessories complete. 13 laying of 11 kv xlpe cable (3x185 sqmm) 14 hoisting of. 15meter 11 kv xlpe cable on d/poles situated at both side of road including cost of12 meter6 inch dia g.i pipe (material will be supplied by contractor). 15 fixing of 11 kv cable jointing kit (3x185 sqmm) o/d . 16 dismentling of 100 kva t/f from existing d/pole and shiftingon newly erected d/pole . 17 chemical erathingof body & neautral . 18 erection of stay set complete . 19 earthing of poles by ms earthing rod 20 laying of ab cable (3x120 sqmm). 21 mounting & fixing of distribution box ( 03 phase) along with making all connections. 22 fixingof other line materials i.e , 11 kv pin insulator with pin-09 nos., top channel-04.,s/s base angle-02 no. etc. 23 supply & fixing offollowing items 24 nut & bolts . 25 percing connector 26 pg clamps 27 clamps with nut bolts 28 for the work of shiting of lt pole on request shri rajendra singh, model town ,bareilly under full deposited fund-2024-25 under eudd-iii, bareilly. 29 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 30 st pole (11 mtr. long) 31 erection work 32 dismentling of old pole from site and back carriage to central store c.b ganj, bareilly. 33 erection ofnew st pole including digging of pit & grouting work complete and fitting of all accessories complete 34 erathing of pole . 35 supply & fixing offollowing items 36 clamps with i-hook 37 clamps with nut bolts 38 for the work of shiting of lt pole on request of shri anirudha prasad, 100 futa bareillyunder full deposited fund-2024-25 under eudd-iii, bareilly. 39 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 40 pcc pole(8.5 mtr. long) 41 erection work 42 erection ofnew pcc pole including digging of pit & grouting work complete and fitting of all accessories complete 43 for the work of giving new connectionof 125 kva (multipoint) to shri pankaj suri, a-403, bake bhihari temple road, bareilly under full deposited fund-2024-25 under eudd-iii, bareilly. 44 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 45 st pole (11 mtr. long) 46 11 kv cable jointing kit (3x120 sqmm) i/d &o/d . 47 11 lv xlpe cable (3x120 sqmm) 48 new 250 kva t/f 49 stay set 50 other line materails 51 erection work 52 erection ofnew st d/ pole including digging of pit & grouting work complete and fitting of all accessories complete 53 erection ofnew st pole including digging of pit & grouting work complete and fitting of all accessories complete 54 laying of11 kv xlpe cable (3x120 sqmm) 55 fixing of 11 kv cable jointing kit (3x120 sqmm) i/d &o/d . 56 hoisting of. 30meter 11 kv xlpe cable on d/poles situated at both side of road including cost of06 meter6 inch dia g.i pipe (material will be supplied by contractor). 57 erection of stay set complete 58 erathing of poles 59 installtion of 250 kva t/f alongwith making all connections . 60 fixingof other line materials i.e , 11 kv pin insulator with pin-06 nos., top channel-09.,s/s base angle-02 no. etc. 61 supply & fixing of clamps for top channel with nut & bolt . 62 for the work of shiting of lt pole on request of mohd. saleem khan , kankar tola,bareillyunder full deposited fund-2024-25 under eudd-iii, bareilly. 63 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 64 st pole (9.00 mtr.) 65 stay set 66 03 ph distribution box 67 erection work 68 erection ofnew st pole(9mtr.) including digging of pit & grouting work complete and fitting of all accessories complete 69 erection of stay set complete 70 erathing of poles 71 mounting & fixing of 03 ph distribution box alongwith making all conections. 72 for the work of shiting of lt pole on request of shri chetan anand , rajeev enclave,bareillyunder full deposited fund-2024-25 under eudd-iii, bareilly. 73 carriage of following materials from e.s.cs store c.b ganj to work site including loading & unloading 74 pcc pole (8.5 mtr.) 75 erection work 76 erection ofnew pcc pole (8.5mtr.) including digging of pit & grouting work complete and fitting of all accessories complete 77 supply & fixing oflt clamps with nut bolts. 78 for the work of shiting of lt pole on request of shri dalhjeet singh,c-534 rajendra nagar ,bareillyunder full deposited fund-2024-25 under eudd-iii, bareilly. 79 carriage of following materials from e.s.cs store c.b ganj to work site including loading & unloading 80 pcc pole (8.5 mtr.) 81 distribution box 03 phase 82 erection work 83 erection ofnew pcc pole (8.5mtr.) including digging of pit & grouting work complete and fitting of all accessories complete 84 mounting & fixing of distribution box 03 phase alongwith making all connections. 85 supply & fixing offollowing items 86 distribution box clamps 87 pecrcing connector 88 for the work giving 60 kw multipoint connection to mr. sanjeev kumar sagar , sherpur, biharmaan nagla , bareilly under full deposited fund-2024-25 under eudd-iii, bareilly. 89 carriage of following materials from e.s.cs store c.b ganj to work site including loading & unloading 90 st pole (11 mtr. long) 91 11 kv xlpe cable (3x70 sqmm) 92 11 kv cbale jointing kit (3x70 sqmm) o/d 93 acsr weasal conductor 94 new 100 kva t/f 95 other line materails 96 erection work 97 erection ofnew st d/pole(11mtr.) including digging of pit & grouting work complete and fitting of all accessories complete 98 overheadlaying of 11 kv xlpe cable (3x70 sqmm) 70 meter alongwith hoisting of cable . 99 erection & fixing of 11 kv cbale jointing kit (3x70 sqmm) o/d 100 erathing of poles by ms erathing rod 101 mounting of 100 kva t/f on d/pole . 102 chemical erathing body & neutral 103 laying of acsr weasal conductor 104 fixingof other line materials i.e , 11 kv pin insulator with pin-09 nos., top channel-02,s/s base angle-02 no. etc. 105 supply & fixing of clamps for top channel with nut & bolt 106 for the work of erection of st pole for pole metering of m/s yogesh nirmaan pvt. ltd., near mega city sanjay nagar , bareilly. under full deposited fund-2024-25 under eudd-iii, bareilly. 107 carriage of following materials from e.s.cs store c.b ganj to work site including loading & unloading 108 st pole (11 mtr.) 109 other line materails 110 erection work 111 erection ofnew st pole(11mtr.) including digging of pit & grouting work complete and fitting of all accessories complete 112 erathing of pole by ms erathing rod 113 fixingof other line materials i.e , top channel-02,s/s base angle-01 no. etc. 114 supply & fixing ofholding clamps with nut & bolt
View Original Notice/Document
Result Documents
Tender Documents
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount :
₹
1,00,00,000