BRR : 4682503
Click Here To View Tendering Authority. Aoc City/State :  bareilly, Uttar Pradesh
Tender Brief : Tender For Electrical Deposit Work Under Eudd-Ii Bareilly, Different Electrification Work Under Deposit Scheme 2024-25 Under Eudd-Ii Bareilly, 1 Forthe Work Of Giving New Connection Of 02 Kw ( Lnv-1 ) To Smt. Naresh Kumari , Golul Dham Colony , Bareilly Under Full Deposited Fund-2024-25 Under Eudd-Ii, Bareilly. 2 Safe Carriage Of Following Materials From Central C.B. Ganj To Work Site Including Loading & Unloading. 3 Pcc Pole ( 8.5 Metre Long ) 4 Distribution Box 03 Phase 5 Abc Cable ( 3X50 Sqmm ) 6 Stay Set 7 Erection Work 8 Erection Of Pcc Pole Including Digging ... Read More
Tender Value
4,35,000
Contract Value
₹ 4,34,595
Saving / Difference
₹ 405 ▲
Submission Date
17-05-2024
Contract Date
14-06-2024
Completion Date
120 days
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 4,34,595 L1
2 cnet-technologies Bid Analytics 4,46,420 L3
3 cnet-technologies Bid Analytics 4,42,320 L2
Work Detail
tender for electrical deposit work under eudd-ii bareilly, different electrification work under deposit scheme 2024-25 under eudd-ii bareilly, 1 forthe work of giving new connection of 02 kw ( lnv-1 ) to smt. naresh kumari , golul dham colony , bareilly under full deposited fund-2024-25 under eudd-ii, bareilly. 2 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 3 pcc pole ( 8.5 metre long ) 4 distribution box 03 phase 5 abc cable ( 3x50 sqmm ) 6 stay set 7 erection work 8 erection of pcc pole including digging of pit & grouting work complete and fitting of all accessories complete. 9 laying , stringing &sagging of a b cable ( 3x50 sqmm ) 10 erection of stay set with graouting 11 fixing of distribution box alongwith making all connections . 12 providing & fixing of suspention clamps wiyth i-hook 13 providing & fixing of dead end clamps 14 forthe work of giving new connection to shri manohar sahani, parsakhera bareilly under full deposited fund-2024-25 under eudd-ii, bareilly. 15 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 16 pcc pole ( 8.5 mtr. long ) 17 abc cable ( 3x50 sqmm ) 18 distribution box 03 phase 19 stay set 20 erection work 21 erection of pcc pole including digging of pit & grouting work complete and fitting of all accessories complete. 22 laying , stringing &sagging of a b cable ( 3x50 sqmm ) 23 erection of stay set with grouting 24 fixing of distribution box alongwith making all connections . 25 providing & fixing of suspention clamps wiyth i-hook 26 providing & fixing of dead end clamps 27 for the work of shifting of ht lines in front of shri sailesh agarwal , parsakhera , bareilly under full deposited fund-2024-25 under eudd-ii, bareilly. 28 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 29 st pole ( 11 meter long ) 30 acsr dog conductor 31 stay set 32 other line materails 33 erection work 34 erection ofst d / poleincluding digging of pit & grouting work complete and fitting of all accessories complete. 35 erection ofst poleincluding digging of pit & grouting work complete and fitting of all accessories complete. 36 laying , stringing &sagging of dog conductor 37 erathing of poles . 38 erection of stay set with grouting 39 provioding & fixing barbed wire . 40 provioding & fixingholding clampswith nuts & bolts 41 provioding & fixing.danger board with clamps. 42 fixing of associated items i.e.top channel-04 no., t-off channel- 03 no., base angle -03 nos., disc fitting-15 no., pin insulator with pin-20 nos. 43 for the work of giving new connection of 200 kva to m / s aman industries at, maheshpur ataria, c.b. ganj, bareilly under full deposited fund-2024-25 under eudd-ii, bareilly. 44 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 45 st pole ( 11 meter long ) 46 acsr dog conductor 47 11 xlpe cable ( 3x120 sqmm ) 48 11 kv pilfer proof metering cublical 49 11 kv xlpe cable box ( 3x120 sqmm0 o / d 50 stay set 51 other line materials 52 erection work 53 erection ofst d / poleincluding digging of pit & grouting work complete and fitting of all accessories complete. 54 laying , stringing &sagging of dog conductor 55 laying of11 kv xlpe cable ( 3x120 sqmm ) 56 hoisting of40 meter 11 kv xlpe cable ( 3x120 sqmm ) on double pole including the jumpering complete with clamps , nut and bolts 57 fixng of 11 kv xlpe cable box ( 3x120 sqmm0 o / d 58 erection& fixing of 11 kv pilfer proof metering cublical 59 erction of stay with grouting . 60 earthing of11 kv pilfer proof meetring cubical water level body & neutral, with gi pipe of 1.5 dia. including mild steel strip size 35x6 mm. ( material will be supplied by contractor ) . 61 provioding & fixing stonepad 62 provioding & fixing.danger board with clamps. 63 provioding & fixing.number plate 64 provioding & fixing.holing clamps with nut & bolts . 65 fixing of associated items i.e.top channel-04 no.pin insulator with pin-12 nos. 66 for the work of extention of lt line of m / s amber enclave , saidpur hawkins , bareilly under full deposited fund-2024-25 under eudd-ii, bareilly. 67 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 68 pcc pole ( 8.5 mtr. long ) 69 ab cable ( 3x120 sqmm ) 70 distribution box 03 phase 71 saty set 72 erection work 73 erection ofpcc pole including digging of pit & grouting work complete and fitting of all accessories complete. 74 laying , stringing &sagging of a bcable ( 3x120 sqmm ) 75 erection of stay set with grouting 76 erection & fixing of distribution box 03 phase alongwith making all conections . 77 provioding & fixing.suspention clapms with i-hook . 78 provioding & fixing of dead end clapms 79 provioding & fixing of holding clapms with nut & bolts 80 for thw eok of extention of load 90 kw to 405 kw of m / s mahalaxmi chemicals, c.b. ganj, bareilly under full deposited fund-2024-25 under eudd-ii, bareilly. 81 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 82 11 kv xlpe cable ( 3x120 sqmm ) 83 11 kv cable box ( 3x120 sqmm ) o / d 84 11 kv pilfer proof metering cublical 85 erection work 86 laying of 11 kv xlpe cable ( 3x120 sqmm ) 87 fixng of 11 kv xlpe cable box ( 3x120 sqmm ) o / d 88 dismentling ofold existing 11 kv pilfer proof metering cublica and back carriagefrom site to central store c.b ganj, bareilly . 89 erection& fixing of 11 kv pilfer proof metering cublical 90 earthing of11 kv pilfer proof meetring cubical water level body & neutral, with gi pipe of 1.5” dia. including mild steel strip size 35x6 mm. ( material will be supplied by contractor ) . 91 for the work of extenstion of load m / s super batteries , parsakhera bareilly under full deposited fund-2024-25 under eudd-ii, bareilly 92 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 93 st pole ( 11 meter long ) 94 11 kv xlpe cable ( 3x70 sqmm ) 95 11 kv xlpe cable box ( 3x70 sqmm ) 96 11 kv pilfer proof metering cublical 97 other line materials 98 erection work 99 erection ofst d / poleincluding digging of pit & grouting work complete and fitting of all accessories complete 100 laying of 11 kv xlpe cable ( 3x70 sqmm ) 101 fixng of 11 kv xlpe cable box ( 3x70 sqmm ) o / d 102 erection& fixing of 11 kv pilfer proof metering cublical 103 earthing of11 kv pilfer proof meetring cubical water level body & neutral, with gi pipe of 1.5 dia. including mild steel strip size 35x6 mm. ( material will be supplied by contractor ) . 104 erathing of poles . 105 provioding & fixing.holing clamps with nut & bolts 106 fixing of associated items i.e.top channel-02 no.pin insulator with pin-12 nos., base angle-02 no. 107 for the work of extenstion of load m / s vishnu steel, parsakhera bareilly under full deposited fund-2024-25 under eudd-ii, bareilly 108 safe carriage of following materials from central c.b. ganj to work site including loading & unloading. 109 st pole ( 11 meter long ) 110 11 kv xlpe cable ( 3x120 sqmm ) 111 11 kv xlpe cable box ( 3x120 sqmm ) 112 11 kv pilfer proof metering cublical 113 other line materials 114 erection work 115 erection ofst d / poleincluding digging of pit & grouting work complete and fitting of all accessories complete 116 laying of 11 kv xlpe cable ( 3x120 sqmm ) 117 hoisting of30 meter 11 kv xlpe cable ( 3x120 sqmm ) on double pole bote with proviodinggi pipe ( 12 meter ) of size 6 dia including the jumpering complete with clamps , nut and bolts. 118 fixng of 11 kv xlpe cable box ( 3x120 sqmm ) o / d 119 erection& fixing of 11 kv pilfer proof metering cublical 120 earthing of11 kv pilfer proof meetring cubical water level body & neutral, with gi pipe of 1.5 dia. including mild steel strip size 35x6 mm. ( material will be supplied by contractor ) . 121 erathing of poles . 122 provioding & fixing.holing clamps with nut & bolts 123 fixing of associated items i.e.top channel-02 no.pin insulator with pin-12 nos., base angle-02 no.
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download e87fabfe-576a-473a-8ccf-29faabcc6bd1
Download aoc
Download boqcomparativechart
Download finance_1595555
Download finsummary_1595555
Download technical_1595555
Download techsummary_1595555
Download File Name File Description
Download e0102685-3af5-4318-bf7b-c52fb4d88373 Tender Documents
Download BOQ_1595555 Tender Documents
Download Tendernotice_1 Tender Documents
Download Tender_form Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000