BRR : 1590405
Click Here To View Tendering Authority. Aoc City/State :  Gorakhpur, Uttar Pradesh
Tender Brief : The Work Sanctioned Under Nagar Nigam System Strengthening Scheme In Area Under Electricity Urban Distribution Division-Iv, Gorakhpur-2 Loading, Unloading And Safe Carriage Of Following Materials From Store Centre, Gorakhpur To Je Dump Store And Je Dump Store To Work Site With Proper Stacking :- 3 3X185 Mm2 Xlpe 11 Kv 4 Cable Jointing Kit 11 Kv Xlpe 3X185 Sq Mm 5 Cable Jointing Kit 11 Kv Xlpe 3X185 Sq Mm Straight Through 6 S.T. Pole 11 Mtr. Long 7 11 Kv Dropper Channel 8 11 Kv Top Channel 9 11 Kv Pin Insulator 10 11 Kv Pin With Net 11 11 Kv Cross Arm 12 Acsr Dog Conduc... Read More
Tender Value
Ref. Document
Contract Value
₹ 2,17,09,480
Submission Date
12-09-2023
Contract Date
09-11-2023
Completion Date
90 days
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 2,44,63,588 L2
2 cnet-technologies Bid Analytics 2,17,09,480 L1
3 cnet-technologies Bid Analytics 2,59,70,630 L3
Work Detail
the work sanctioned under nagar nigam system strengthening scheme in area under electricity urban distribution division-iv, gorakhpur-2 loading, unloading and safe carriage of following materials from store centre, gorakhpur to je dump store and je dump store to work site with proper stacking :- 3 3x185 mm2 xlpe 11 kv 4 cable jointing kit 11 kv xlpe 3x185 sq mm 5 cable jointing kit 11 kv xlpe 3x185 sq mm straight through 6 s.t. pole 11 mtr. long 7 11 kv dropper channel 8 11 kv top channel 9 11 kv pin insulator 10 11 kv pin with net 11 11 kv cross arm 12 acsr dog conductor 13 11 kv disc insulator with fitting 14 11 kv t-off channel 15 stay complete 16 earthing complete 17 11 kv vcb o / g ctr 200 / 100 / 5a, 350 mva 18 supply offollowing material / fitting complete in all respect :- 19 hdpe pipe dia 6 inch 20 holding clamps for top, dropper, t-off etc 21 nuts & bolts off size 22 g.i pipe dia 6 inch 23 f-bracket 24 the excavation of 2 no foundation pit of size 750mmx450mm and having depth of 1 / 6th of the full length of the pole. fabrication & erection of double pole with fixing of necessary clamps & accessories ( top channel, dropper angle etc. ) as per required. all required materials such as holding clamp / stp clamp, nuts & bolts off size etc will be provided by the contractor.grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in the block ofsize 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) .making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 25 the excavation of 1 no foundation pit of size 750mmx450mm and having depth of 1 / 6th of the full length of the pole. fabrication & erection of single pole with fixing of necessary clamps & accessories as per required ( if required ) . all required materials such as holding clamp / stp clamp, nuts & bolts off size etc will be provided by the contractor.grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in the block ofsize 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) .making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 26 painting of pole by double coating aluminum & red oxide paint. paint will beprovided by contractor 27 earthing of stp pole by ms earthing rod & 6 swg earthing wire as per respo norms. 28 laying of hdpe pipe 6 inch diameter for laying of 11 kv 3x185 sq mm xlpe cable by horizontal drilling method. the hdpe pipe shall be of pe 80 grade with pressure rating pn6 conforming to is 4984 / 1995 and shall have wall thickness of 6.20 to 7.10 mm ( hdpe pipe 6 inch dia with elbow and socket for 11 kv cable will be supplied by contractor ) 29 laying and dressing of under ground 11 kv 3x185 sq mm xlpe cable into hdpe pipe ( wherever required ) by horizontal drilling methodas per respo norms. the depth of horizontal drilling shall be between 2 to 3 meters or as per site required. 30 erection of 11 kv xlpe cable 3x185 mm² jointing kit with complete work 31 making loop & hoisting of 11 kv xlpe cable providing 6 dia gi pipe 3 m long with complete work 32 fabrication, erection, commissioning & testing of 11 kv vcb o / g ctr 200 / 100 / 5a, 350 mva 33 earthing of 11 kv vcb o / g ctr 200 / 100 / 5a, 350 mva 35 loading, unloading and safe carriage of following materials from store centre, gorakhpur to je dump store and je dump store to work site with proper stacking :- 36 lt ab cable ( 3x120+1x95+1x16 ) sq mm 37 st pole 9 mtr long 38 lt three phase distribution box 39 lt cable 1x35 sq mm 40 supply offollowing material / fitting complete in all respect :- 41 lt clamps with nuts & bolts 42 clamp for lt three phase db boxwith nuts & bolts 43 suspension clamp with i hook ( insulated ) 44 dead end clamp with i hook ( insulated ) 45 piercing connector ( insulated ) 46 laying, stringing, sagging, binding and jumpering of abc ( 3x120+1x95+1x16 ) sq.mm. cable of lt line with fixing of distribution box with clamp, insulated dead end clamp with i hook, suspension clamp with i hook ( insulated ) , lt insulated piercing connector, xlpe 1x35 sq.mm. al. cable for enerzing db, xlpe 1x16 sq.mm. al. cable for giving connection to street light and nuts&bolts off size by the contractor. 47 the excavation of 1 no foundation pit of size 750mmx450mm and having depth of 1 / 6th of the full length of the pole. fabrication & erection of single pole with fixing of necessary clamps & accessories as per required ( if required ) . all required materials such as holding clamp / stp clamp, nuts & bolts off size etc will be provided by the contractor.grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in the block ofsize 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) .making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 48 disconnection & reconnection of consumer service cables 50 loading, unloading and safe carriage of following materials from store centre, gorakhpur to je dump store and je dump store to work site with proper stacking :- 51 st pole 9 mtr long 52 earthing complete 53 supply offollowing material / fitting complete in all respect :- 54 lt clamps with nuts & bolts 55 shackle insulator 100x115 mm 56 red oxide paint 57 aluminium paint 58 waterproof danger board sticker 59 the excavation of 1 no foundation pit of size 750mmx450mm and having depth of 1 / 6th of the full length of the pole. fabrication & erection of single pole with sticking of waterproof danger board sticker, fixing / refixing of necessary clamps & accessories as per required alongwith resagging of lt line ( if required ) . all required materials such as holding clamp / stp clamp, nuts & bolts off size etc will be provided by the contractor.grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in the block ofsize 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) .making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 60 earthing of stp pole by ms earthing rod & 6 swg earthing wire as per respo norms. 61 dismentling & carriage of old existing pole from work site to store centre 62 disconnection & reconnection of consumer service cables 64 chemical earthing of distribution transformers ( body+neutral in one complete job ) 66 loading, unloading and safe carriage of following materials from store centre, gorakhpur to je dump store and je dump store to work site with proper stacking :- 67 63 kva transformer 68 100 kva transformer 69 250 kva transformer 70 400 kva transformer 71 lt xlpe al. 3.5x70 sq mm 72 lt xlpe al. 3.5x120 / 150sq mm 73 lt xlpe al. 1x240 sq mm 74 lt cable 1x400 sq mm 75 supply offollowing material / fitting complete in all respect :- 76 copper z clamp 77 almunium lugs of different sizes as per cable requirement 78 fabrication, errection, commissioning & testing of63 / 250 / 400 kva t / f on double pole / plinth with all accessories including make its lt and ht connection. all necessary materials such as holding clamp, al.lugs ( confirming to is 8309 ) , z clamp, nuts & bolts will be supplied by the contractor. 79 construction of t / f plinth of size 2x2x1.2 mtr with the help of first class brick & 9 masonary in the ratio 1:4 cement & sand coarse. filling the structure completely andplastering outer surface as per respo norms. top of the plinth covered with 4 rcc slab of ratio 1:1.5:3 ( cement, sand & concrete ) grouting with 2 nos. ismc size 125x65x6 mm ( confirming to is 808:1989 ) of 2000 mm long for resting. all required materials will be provided by the contractor. 80 grill fencing of 11 / 0.4 kv s / s shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50x50x5 mm angel the frame is also have 1 no. horizontal runner of ms flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. the work is including painting of fencing as per norms. work will be done as per respo specification. 81 dismentling & carriage of old transformer from work site to store centre 83 loading, unloading and safe carriage of following materials from store centre, gorakhpur to je dump store and je dump store to work site with proper stacking :- 84 250 kva transformer 85 st pole 11 mtr long 86 ms top channel ( 125x65x2240 ) mm 87 substation base 88 ms angle ( dropper ) 100x50x2028 mm 89 acsr weasel conductor 90 11 kv pin insulator with pin 91 11 kv disc insulaor with fiitings 92 11 kv fuse set 93 11 kv v cross arm 94 11 kv t-off channel 95 stay complete ( stay rod 16x1800 mm, stay wire 5 kg, stay clamp, bolt & nuts ) 96 earthing complete 97 lt cable 1x240 sq mm 98 supply offollowing material / fitting complete in all respect :- 99 shackle insulator 100 lt clamps 101 holding clamp for top, dropper channel fuse set etc with nuts & bolts 102 copper z calmp 103 nuts & bolts of different sizes 104 al lugs 105 the excavation of 2 no foundation pit of size 750mmx450mm and having depth of 1 / 6th of the full length of the pole. fabrication & erection of double pole with fixing of necessary clamps & accessories ( top channel, dropper angle etc. ) as per required. all required materials such as holding clamp / stp clamp, nuts & bolts off size etc will be provided by the contractor.grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in the block ofsize 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) .making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 106 fabrication, errection, commissioning & testing of250 kva t / f on plinth with all accessories including make its lt and ht connection. all necessary materials such as holding clamp, al.lugs ( confirming to is 8309 ) , z clamp, nuts & bolts will be supplied by the contractor. 107 construction of t / f plinth of size 2x2x1.2 mtr with the help of first class brick & 9 masonary in the ratio 1:4 cement & sand coarse. filling the structure completely andplastering outer surface as per respo norms. top of the plinth covered with 4 rcc slab of ratio 1:1.5:3 ( cement, sand & concrete ) grouting with 2 nos. ismc size 125x65x6 mm ( confirming to is 808:1989 ) of 2000 mm long for resting. all required materials will be provided by the contractor. 108 grill fencing of 11 / 0.4 kv s / s shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50x50x5 mm angel the frame is also have 1 no. horizontal runner of ms flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. the work is including painting of fencing as per norms. work will be done as per respo specification. 109 painting of pole by double coating aluminum & red oxide paint. paint will beprovided by contractor 110 earthing of stp pole by ms earthing rod & 6 swg earthing wire as per respo norms. 111 chemical earthing of distribution transformers ( body+neutral in one complete job ) 112 laying, stringing, sagging, binding and jumpering of acsr weasel conductor for lt / ht line with fixing of lt clamps / other clamps, shackle insulator and nuts&bolts off size as per required. 113 erection offuse set 114 erection and grouting of stay in cc ratio 1:4:8 of cement, sand and stone ballast including cost of grouting material with nozelling and binding of stay wire ( complete work ) 116 loading, unloading and safe carriage of following materials from store centre, gorakhpur to je dump store and je dump store to work site with proper stacking :- 117 400 kva transformer 118 11 kv xlpe cable 3x70 sq mm 119 11 kv c / j kit 3x70 sq mm 120 st pole 11 mtr long 121 ms top channel ( 125x65x2240 ) mm 122 ms angle ( dropper ) 100x50x2028 mm 123 substation base 124 acsr weasel conductor 125 11 kv pin insulator with pin 126 11 kv disc insulaor with fiitings 127 11 kv fuse set 128 stay complete ( stay rod 16x1800 mm, stay wire 5 kg, stay clamp, bolt & nuts ) 129 earthing complete 130 lt cable 1x400 sq mm 131 supply offollowing material / fitting complete in all respect :- 132 holding clamp for top, dropper channel fuse set etc with nuts & bolts 133 copper z calmp 134 nuts & bolts of different sizes 135 al lugs 136 the excavation of 2 no foundation pit of size 750mmx450mm and having depth of 1 / 6th of the full length of the pole. fabrication & erection of double pole with fixing of necessary clamps & accessories ( top channel, dropper angle etc. ) as per required. all required materials such as holding clamp / stp clamp, nuts & bolts off size etc will be provided by the contractor.grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in the block ofsize 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) .making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 137 fabrication, errection, commissioning & testing of400 kva t / f on plinth with all accessories including make its lt and ht connection. all necessary materials such as holding clamp, al.lugs ( confirming to is 8309 ) , z clamp, nuts & bolts will be supplied by the contractor. 138 construction of t / f plinth of size 2x2x1.2 mtr with the help of first class brick & 9 masonary in the ratio 1:4 cement & sand coarse. filling the structure completely andplastering outer surface as per respo norms. top of the plinth covered with 4 rcc slab of ratio 1:1.5:3 ( cement, sand & concrete ) grouting with 2 nos. ismc size 125x65x6 mm ( confirming to is 808:1989 ) of 2000 mm long for resting. all required materials will be provided by the contractor. 139 laying of 11 kv 3x70 sq mm xlpe cable overhead as per respo norms. 140 erection of 11 kv xlpe cable 3x70 mm² jointing kit with complete work 141 grill fencing of 11 / 0.4 kv s / s shall be made of rectangular of size & height approx 2 meter as per site requirement with fabrication 50x50x5 mm angel the frame is also have 1 no. horizontal runner of ms flat 40x5 welded in middle to support of grill, having a gate on road side must have provision of locking arrangement. the work is including painting of fencing as per norms. work will be done as per respo specification. 142 painting of pole by double coating aluminum & red oxide paint. paint will beprovided by contractor 143 earthing of stp pole by ms earthing rod & 6 swg earthing wire as per respo norms. 144 chemical earthing of distribution transformers ( body+neutral in one complete job ) 145 laying, stringing, sagging, binding and jumpering of acsr dog / weasel conductor for lt / ht line with fixing of lt clamps / other clamps, shackle insulator and nuts&bolts off size as per required. 146 erection offuse set 147 erection and grouting of stay in cc ratio 1:4:8 of cement, sand and stone ballast including cost of grouting material with nozelling and binding of stay wire ( complete work ) 149 supply of 11kv, 630, 21ka ring main unit, 3 way, outdoor type, 2lbs+1vcb, manual operated, non extensible , sf6 gas insulated 151 supply of mobile distribution transformer of 400 kva dtr with trolley ( 400 kva t / f will be provided by department )
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download c50790e7-9962-4d99-819c-9ead3037bda4
Download AOC24
Download boqcomparativechart
Download finsummary_1399742
Download techsummary_1399742
Download File Name File Description
Download 640e6cc3-13a6-4585-9d87-3bdb38d3f3eb Tender Documents
Download BOQ_1399742 Tender Documents
Download Tendernotice_1 Tender Documents
Download Tender_Form_Term_Condition Tender Documents
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000