BRR : 122997
Click Here To View Tendering Authority. Aoc City/State :  Area of EUDC, Gorakhpur, Uttar Pradesh
Tender Brief : Work Against Sanctioned Package No. 21 / 2019-20, 19 / 2020-21, 27 / 2020-21 & 30 / 2020-21 ( Under Deposit Scheme ) Under Electricity Urban Distribution Circle, Gorakhpur-1.01 Loading, Unloading And Carriage Of Following Material From Store Centre, Gorakhpur To Work Site:- 11 / 0.4 Kv 63 Kva Transformer- 1 No., St Pole 11 Mtr Long- 2 Nos., Acsr Dog Conductor- 0.105 Km., 11 Kv Pin Insulator With Fitting- 9 Nos., 11 Kv Disc Insulator With Fitting- 9 Nos., 11 Kv Toff Channel- 1 No., Sub Station Base Angle- 2 No., 11 Kv Dropper Angle- 02 Nos., 11 Kv Top Channel- 01 No., 11 K... Read More
Tender Value
Ref. Document
Contract Value
₹ 1,98,820
Submission Date
19-09-2020
Contract Date
21-10-2020
Completion Date
30 days
Participated Bidder List
3 No of Bidder(s)
Sr No. Bidder Name Bid Analytics Technical Bid Financial Bid AOC Bid Value Rank
1 cnet-technologies Bid Analytics 2,00,573 L3
2 cnet-technologies Bid Analytics 1,99,990 L2
3 cnet-technologies Bid Analytics 1,98,820 L1
Work Detail
work against sanctioned package no. 21 / 2019-20, 19 / 2020-21, 27 / 2020-21 & 30 / 2020-21 ( under deposit scheme ) under electricity urban distribution circle, gorakhpur-1.01 loading, unloading and carriage of following material from store centre, gorakhpur to work site:- 11 / 0.4 kv 63 kva transformer- 1 no., st pole 11 mtr long- 2 nos., acsr dog conductor- 0.105 km., 11 kv pin insulator with fitting- 9 nos., 11 kv disc insulator with fitting- 9 nos., 11 kv toff channel- 1 no., sub station base angle- 2 no., 11 kv dropper angle- 02 nos., 11 kv top channel- 01 no., 11 kv fuse set - 1 nos., earthing complete- 2 nos., stayset complete with 5 wire- 2 nos. the excavation of 2 nos. foundation pit of size 750mmx450mm and having depth of 1 / 6th of full length of the pole. fabrication & erection of double pole with fixing of necessary clamps ( dropper per 1.02 accessories top channel, angle etc. ) as required. all required materials such holding clamp / stp clamp, nuts & bolts off size etc will be provided by the contractor. grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) . making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 1.03 painting of pole with aluminium paint & red oxide paint provided by contractor 1.04 earthing of st pole by ms earthing rod & 6 swg earthing wire as per respo norms. 1.05 erection and grouting of stay in cc ratio 1:4:8 of cement, sand and stone ballast including cost grouting material with nozelling and binding of stay wire ( complete work ) 1.06 fabrication, errection, commissioning & testing of 63 kva t / f on double pole with accessories including make its lt and ht connection. all necessary materials such as holding clamp, al.lugs ( confirming to is 8309 ) , nuts & bolts will be supplied by the contractor. 1.07 special earthing of transformer ( body+neutral ) as per is code 3043 - 1987 specification 1.08 erection of fuse set 2.01 loading, unloading and carriage of following material from store centre, gorakhpur to work site:- 11 / 0.4 kv 63 kva transformer- 1 no., st pole 11 mtr long- 2 nos., acsr weasel conductor- 0.09 km., 11 kv pin insulator with pin- 6 nos., 11 kv disc insulator with fitting- 6 nos., 11 kv t-off channel- 1 no., sub station base angle- 2 no., 11 kv top channel - 01 no., 11 kv tpmo- 1 no., 11 kv fuse set - 1 nos., earthing complete- 2 nos., stay complete - 2 nos., 11 kv dropper channel-1 no., stone pad- 2 nos. 2.02 the excavation of 2 nos. foundation pit of size 750mmx450mm and having depth of 1 / 6th of the full length of the pole. fabrication & erection of double pole with fixing of necessary clamps & accessories ( top channel, dropper angle etc. ) as per required. all required materials such as holding clamp / stp clamp, nuts & bolts off size etc will be provided by the contractor. grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) . making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 2.03 painting of pole with aluminium paint & red oxide paint provided by contractor 2.04 earthing of st pole by ms earthing rod & 6 swg earthing wire as per respo norms. 2.05 erection and grouting of stay in cc ratio 1:4:8 of cement, sand and stone ballast including cost of grouting material with nozelling and binding of stay wire ( complete work ) 2.06 fabrication, errection, commissioning & testing of 63 kva t / f on double pole with all accessories including make its lt and ht connection. all necessary materials such as holding clamp, al.lugs ( confirming to is 8309 ) , nuts & bolts will be supplied by the contractor. 2.07 special earthing of transformer ( body+neutral ) as per is code 3043 - 1987 specification 2.08 erection of tpmo & fuse set 3.01 11 / 0.4 kv 63 kva transformer- 2 no., st pole 11 mtr long- 7 nos., acsr weasel conductor- 0.400 km., 11 kv pin insulator with fitting- 21 nos., 11 kv disc insulator with fitting- 12 nos., 11 kv t-off channel- 4 no., sub station base angle- 4 no., 11 kv top channel for double pole- 02 no., 11 kv fuse set - 2 nos., earthing complete- 7 nos., stay complete - 4 nos., 11 kv v type steel cross arm- 3 nos. 3.02 the excavation of 2 nos. foundation pit of size 750mmx450mm and having depth of 1 / 6th of the full length of the pole. fabrication & erection of double pole with fixing of necessary clamps & accessories ( top channel, dropper angle etc. ) as per required. all required materials such as holding clamp / stp clamp, nuts & bolts off size etc will be provided by the contractor. grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) . making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 3.03 the excavation of foundation pit of size 750mmx450mm and having depth of 1 / 6th of the full length of the pole. fabrication & erection of pole with fixing of necessary clamps & accessories as per required. all required materials such as holding clamp / stp / lt clamp, nuts & bolts off size etc will be provided by the contractor. grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) . in case of st pole making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 3.04 laying, stringing, sagging, binding and jumpering of acsr weasel conductor for 11 kv line with providing and fixing of holding clamps / other clamps and nuts&bolts off size by the contractor as per required. 3.05 painting of pole with aluminium paint & red oxide paint provided by contractor 3.06 earthing of st pole by ms earthing rod & 6 swg earthing wire as per respo norms. 3.07 erection and grouting of stay in cc ratio 1:4:8 of cement, sand and stone ballast including cost of grouting material with nozelling and binding of stay wire ( complete work ) 3.08 fabrication, errection, commissioning & testing of 63 kva t / f on double pole with all accessories including make its lt and ht connection. all necessary materials such as holding clamp, al. lugs ( confirming to is 8309 ) , nuts & bolts will be supplied by the contractor. 3.09 special earthing of transformer ( body+neutral ) as per is code 3043 - 1987 specification 3.10 erection of fuse set 4.01 11 / 0.4 kv 63 kva transformer- 1 no., st pole 11 mtr long- 2 nos., acsr weasel conductor- 0.05 km., 11 kv pin insulator with fitting- 6 nos., 11 kv disc insulator with fitting- 6 nos., 11 kv t-off channel- 1 no., sub station base angle- 2 no., 11 kv dropper angle- 02 nos., 11 kv top channel- 01 no., 11 kv tpmo - 1 nos., earthing complete- 2 nos., stay complete- 4 nos., lt cable 4x25 - 30 mtr. 4.02 the excavation of 2 nos. foundation pit of size 750mmx450mm and having depth of 1 / 6th of the full length of the pole. fabrication & erection of double pole with fixing of necessary clamps & accessories ( top channel, dropper angle etc. ) as per required. all required materials such as holding clamp / stp clamp, nuts & bolts off size etc will be provided by the contractor. grouting of pole in cc 1:4:8 ( cement, sand & 40 mm brick ballast ) , grouting will be done in the block of size 450x450 mm x depth upto ground level and backfilling of pits with mud completely and leveling etc ( material provided by contractor ) . making plinth around pole height 300 mm above ground level with top 100 mm is kept tapered so that no rainwater gets accumulated on the top. all work will be done as per respo norms & relevent is specification. 4.03 painting of pole with aluminium paint & red oxide paint provided by contractor 4.04 earthing of st pole by ms earthing rod & 6 swg earthing wire as per respo norms. 4.05 erection and grouting of stay in cc ratio 1:4:8 of cement, sand and stone ballast including cost of grouting material with nozelling and binding of stay wire ( complete work ) 4.06 fabrication, errection, commissioning & testing of 63 kva t / f on double pole with all accessories including make its lt and ht connection. all necessary materials such as holding clamp, al.lugs ( confirming to is 8309 ) , nuts & bolts will be supplied by the contractor. 4.07 special earthing of transformer ( body+neutral ) as per is code 3043 - 1987 specification 4.08 erection of tpmo
View Original Notice/Document
Result Documents
Tender Documents
Download File Name File Description
Download dee445e3-37e5-4500-ae22-fa1162e18e28
Download AOC35
Download boqcomparativechart
Download File Name File Description
Download Tendernotice_1 Tender Documents - NIT
Download File Tender Documents
Download B520AFFA-59CF-4FB4-9182-B2204A897A3A Tender Documents - Tender Notice
Disclaimer

We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender

✦ ✦ ✦
Awarded Bidder(s)
1
cnet-technologies
Rank : L1 (Lowest)
Bid Amount : ₹ 1,00,00,000
Similar Tenders Results
TenderDetail
Loading tenders