BRR : 10061018
Tender Brief : Annual Contract For Mechanical Maintenance And Allied Jobs At Lpg Bottling Plant , Durgapur , Daily Checking , Cleaning & Servicing Of Frls At Filling Shed , Filled Shed , Cr Shed , Tld , Empty Shed , Rovs , Pump House And Air Compressor House . The Job Includes Draining Of Condensates , Topping-Up Of Lubricants , Cleaning Of Filter Element , Replacement Of Filter Element As And When Necessary And Arresting Of Leakage Of Air , If Any . All The Spares And Consumables Will Be Supplied By Iocl . ( Considering 26 Working Days And 2 Sundays Operation On Both Shifts / Night Shif... Read More
Tender Value
₹
Ref. Document
Submission Date
17-07-2021
Participated Bidder List
5 No of Bidder(s)
| Sr No. | Bidder Name | Bid Analytics | Technical Bid | Financial Bid | AOC | Bid Value | Rank |
|---|---|---|---|---|---|---|---|
| 1 | cnet-technologies | Bid Analytics | |||||
| 2 | cnet-technologies | Bid Analytics | 34,78,482 | L2 | |||
| 3 | cnet-technologies | Bid Analytics | 33,12,840 | L1 | |||
| 4 | cnet-technologies | Bid Analytics | 36,41,142 | L3 | |||
| 5 | cnet-technologies | Bid Analytics |
Work Detail
annual contract for mechanical maintenance and allied jobs at lpg bottling plant , durgapur , daily checking , cleaning & servicing of frls at filling shed , filled shed , cr shed , tld , empty shed , rovs , pump house and air compressor house . the job includes draining of condensates , topping-up of lubricants , cleaning of filter element , replacement of filter element as and when necessary and arresting of leakage of air , if any . all the spares and consumables will be supplied by iocl . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , routine checking and calibration of filling machines of carousel ( s ) / 47 . 5 kg & 425 kg filling facility in a shift or as directed and maintenance of filling guns as and when required and directed by ioc officers to ensure no leak of filling guns . job also includes cleaning of all reflectors , sensors and maintenance / servicing of all the pneumatic gadgets of carousel ( s ) including gas stop valves on a regular basis . checking rail & wheel conditions of carousels . replacing of wheel & wheel bearing as and when required and directed by ioc officers . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , adjusting of cylinders ejection / introduction from / to filling machines of all carousals to ensure no stoppage of cylinders at ejection point and smooth entry of cylinders to filling machines . the job is also including replacement of taflon strip , tightening of nuts and bolts , cleaning on pneumatic silencer and adjustment of carousal speed for changing in filling of 14 . 2 kg and 19 kg as per advice of floor officer . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , servicing and replacement of spares of carousel ( s ) , filling machines , gas stop valves , sovs , communication input and output boxes , integrated check scale ( s ) , drive units , central column , introduction and ejection unit of carousels , all equipment of 47 . 5 kg & 425 kg filling facility . job has to be undertaken on requirement basis including holiday / non-working shifts as directed / guided by officers . the job includes necessary replacements of mechanical / electronic spares including electronic pcb . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , inspection and maintenance of conveyor system in plant . the job includes necessary assistance and repairing for maintaining proper tension of conveyor chain , replacement of all types of sprockets , plummer block , bearing and any type of conveyor breakdown ( excluding hot work ) at any point of time including night shift . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , maintaining zero soap solution leakage from conveyors . job is including necessary hot works and cold works including change of conveyor joint gaskets , positioning of over flow hose of soap trays . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , daily checking of conveyor drive unit for oil level , chain tension etc . and necessary topping of lube oil , adjusting chain tension etc . the job includes replacement of rubber bush and maintaining /making proper alignment . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , repairing and maintenance of gear boxes under the supervision of ioc officials as & when directed . job includes replacement , inside cleaning of gear boxes , replacement of oil seals/spares like bearing , worn wheels and worn shafts if required and keeping gear boxes with no oil leakage & maintenance of worm / helical gear boxes . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , daily checking and servicing of hot air sealing units , weight correction units , vcwes , auto evacuation unit , rqcs etc . the job is including replacement of spares , adjusting and ensuring for smooth and proper functioning of each and every pneumatic gadgets , replacement of consumables on preventive measure basis , checking and rectification for proper centering ( wherever applicable ) . jobs are to be done as per the direction of ioc engineers . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , daily checking & servicing of purging unit , rqc unit , valve change unit and electronic check scale , evacuation compressors & tanks , auto - change over with hla of evacuation tanks . the job is including replacement of spares adjusting and ensuring for smooth and proper functioning of each and every pneumatic gadgets . replacement of consumables on preventive measure basis , checking and rectification for proper centering ( wherever applicable ) . jobs are to be done as per the direction of ioc engineers . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , daily checking of gd / pt and old / vld segregator ( s ) . replacement of consumables , maintaining smooth functioning of electronic / pneumatic gadgets and gun centering . proper functioning of machine is to be ensured . jobs are to be done as per the direction of ioc engineers . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , daily checking of washing units and cleaning of spray nozzles . water coming out from washing unit is to be maintained properly to take it out to the tank and to avoid water flow at and around the washing unit . jobs includes maintenance of washing units pumps and strainer cleaning ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , daily checking of lubricating oil level in lpg vapour compressors , lpg pumps , service water pump and drinking water pumps and topping-up of recommended lube oil , if required and draining & replacement of lube oil after thorough cleaning of lube oil casing & gland packing replacement of water pumps , foot valve replacement , necessary lubricating oil & spares shall be supplied by ioc . ( considering 26 working days and 2 sundays operation on both shifts / night shift bottling if any ) , cleaning of line strainer of lpg pumps , vapour compressor , vcwes and carousal inlet line etc . the job includes necessary opening / dismantling of strainer , cleaning of strainer and assembling the same . necessary spares and consumables shall be supplied by ioc . , checking , tightening & replacement of foundation bolts of air / vapour compressor / lpg pumps/ service water pumps & checking of belt tension of air / vapour compressor and replacement of belts if required . necessary spares and consumables shall be supplied by ioc . , hot work at filling shed , filled shed , empty shed , and cr shed . the job is including necessary gas cutting /welding . party has to supply consumables like oxygen and electrodes etc . ioc will supply power and lpg only . party also should have his own machineries . , daily checking and calibration / repair of check scales , weight reduction unit / correction unit , degassing unit , avts / ol / vl and 47 . 5 / 425 kg filling facilities and undertaking daily routine checking of integrated correction unit , hot air sealing unit , screw/unscrew machine , evacuation unit and purging unit and providing assistance for repair and maintenance of the said equipments/units as and when required and as directed by ioc officers . the job also includes providing assistance in repairing/maintenance of the mentioned equipments in sundays/holidays and also in night shift , if required , for attending any breakdown . necessary spares an
View Original Notice/Document
Result Documents
Tender Documents
| Download | File Name | File Description |
|---|---|---|
| Download | FAQs-IOCL-Online-EMD | Tender Documents - FAQs-IOCL-Online-EMD |
| Download | Special_Instructions_to_the_Bidders_20200717 | Tender Documents - Special_Instructions_to_the_Bidders_20200717 |
| Download | Tendernotice_1 | Tender Documents - NIT |
| Download | BOQ_147718 | Tender Documents - BOQ |
| Download | 95B32ED0-6D49-4FC9-911C-C7C2DB9B26A4 | Tender Documents - Tender Notice |
| Download | TD | Tender Documents - Tender Document |
| Download | Tender-Acceptance-Format | Tender Documents - Tender-Acceptance-Format |
| Download | GCC | Tender Documents - GCC |
Disclaimer
We takes all possible care for accurate & authentic tender information. However users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender
Financial Evaluation In Progress
Financial bids are currently under review. Awarded bidder information will be published after final evaluation.
PriceBid
Similar Tenders Results