Highway Construction Tenders from India

101 Highway Construction tenders are published by various Tendering Authorities & Private companies. 101 live Tender for Highway Construction are available in Highway Construction Tender section You can further filter Highway Construction tenders by Tender Value, Tender Submission Date or Project Location.

1

construction of approach road including cds , protection wall , flush causeway for agriculture land/abadi for village borkhedi , awalda , kundiya , tehsil and distt . barwani .

  • 4.36 Crore
  • Madhya Pradesh
  • Mar 10, 2021
  • 27146433
2

constructions of four lane yet ayodhya sultanpur nh-330 to airport .

  • Ref. Document
  • Uttar Pradesh
  • Mar 4, 2021
  • 27144680
3

construction of approach road, rcc culvert, security guard operator room, switch room, store room, river protection and delivery tank.

  • Ref. Document
  • Uttar Pradesh
  • Mar 8, 2021
  • 27143673
4

road furniture works on state highway 120

  • 4.99 Lakhs
  • Rajasthan
  • Mar 8, 2021
  • 27143137
5

widening to 2 ( two ) lane with paved shoulder of imphal to jiribam section of nh-37 from design chainage 66 . 110 km to 83 . 800 km ( total length 17 . 69 km ) ( pkg-5 ) in the state of manipur on epc mode .

  • 138.68 Crore
  • Manipur
  • Mar 17, 2021
  • 27138412
6

widening to 2 ( two ) lane with paved shoulder of imphal to jiribam section of nh-37 from design chainage 48 . 970 km to 66 . 110 km ( total length 17 . 14 km ) ( pkg-4 ) in the state of manipur on epc

  • 156.80 Crore
  • Manipur
  • Mar 17, 2021
  • 27138410
7

replacement of damage pole replacement of damage pole state highway and national highway in edd i , pratapgarh

  • Ref. Document
  • Uttar Pradesh
  • Mar 24, 2021
  • 27138237
8

construction of two lane with paved shoulders road from tamenglong to mahur in the state of manipur from km 10 . 000 near dialong village to km 21 . 900 near old tamenglong village ( length-11 . 90 km ) ( package-2a ) on epc mode

  • 185.78 Crore
  • Manipur
  • Mar 17, 2021
  • 27136879
9

widening and strengthening of rampur bypass from km . 0 . 000 to 1 . 200 km . to four lane width in district muzaffarnagar , uttar pradesh

  • 8.95 Crore
  • Uttar Pradesh
  • Mar 18, 2021
  • 27136748
10

construction of approach path towards foot bridge over jathi nallah . pyt . gajoth , block bhalla .

  • Ref. Document
  • Jammu And Kashmir
  • Mar 11, 2021
  • 27133598
11

construction of two lane with paved shoulders road from tamenglong to mahur in the state of manipur from km 21 . 900 near old tamenglong village to km 31 . 430 near barak river ( length-9 . 53km ) ( package-2b ) on epc mode

  • 179.78 Crore
  • Manipur
  • Mar 17, 2021
  • 27130972
12

request for proposal for inviting offers for setting up of four fuel stations along bundelkhand expressway .

  • Ref. Document
  • Uttar Pradesh
  • Mar 30, 2021
  • 27126627
13

improvement of aurangabad-jalna four lane road msh-06 km14/200 to 60/200 ( under bot programme ) ( 2nd call )

  • 81.78 Lakhs
  • Maharashtra
  • Mar 3, 2021
  • 27117383
14

construction of approach road to warden quarter by way of p/l gsb/khak bajri and wbm grade-2nd at hostel block of govt . degree college bemina srinagar .

  • Ref. Document
  • Jammu And Kashmir
  • Mar 3, 2021
  • 27115864
15

rectification of blackspot on highway connecting devanahalli with kempapura road (sh-96)at 12.9km near j.venkatapura in sidhlaghatta tq,chikaballapur district.

  • Ref. Document
  • Karnataka
  • Mar 8, 2021
  • 27113943
16

tender for gajanipur-nathidanga from 0.00 km to 8.90 km, surfacing work under murshidabad highway division no-i in the district of murshidabad. (2nd call)

  • 94.28 Lakhs
  • West Bengal
  • Mar 16, 2021
  • 27112885
17

improvement of aurangabad-jalna four lane road msh-06 km14 / 200 to 60 / 200 under bot programme ) 2nd call )

  • 82.82 Lakhs
  • Maharashtra
  • Mar 11, 2021
  • 27111206
18

widening and strengthening works in two lanes from 0 . 00 to 39 . 665 in bindrabazar chiraiyakot belthararoad sh-149 widening and strengthening works in two lanes from 0 . 00 to 39 . 665 in bindrabazar chiraiyakot belthararoad sh-149

  • 58 Crore
  • Uttar Pradesh
  • Mar 3, 2021
  • 27107663
19

construction of approach path and boundary wall at reporting centre thanamandi at j-06 rajouri ( forss2020100225 ) as per boq

  • 3 Lakhs
  • Jammu And Kashmir
  • Mar 3, 2021
  • 27105575
20

restoration of national highway way to levdoora , y . k . pora to nagrass , chittergam , razloo kund road .

  • Ref. Document
  • Jammu And Kashmir
  • Mar 8, 2021
  • 27104421
21

improvement development of lane by pdg . rmc , m / h , gg , etc from g-2 to tayal electrical , g-4 to nalla , batra properties to nalla in gandhi market in ward no . 31-s in sagarpur west .

  • 57.06 Lakhs
  • Delhi
  • Mar 1, 2021
  • 27101120
22

improvement and development of lane by pdg . rmc from i-7 / 8 to wz / 59 in imarti block in chowkhandi extn . and patch work mukhram garden , mukhram park extn . , chowkhandi extn . and ram nagar in ward tagore garden in 006-s / wz

  • Ref. Document
  • Delhi
  • Mar 1, 2021
  • 27101045
23

repairing work of mogra damra bishpara raghunathpur road from 5.00kmp. to 6 .00 kmp.. in patches by repairing potholes, profile corrective course, w.b.m with 20 mm th p c & seal coat of bansberia highway sub-division - i under hooghly highway division -ii, in the district of hooghly during the year 2020 -2021

  • 3.68 Lakhs
  • West Bengal
  • Mar 4, 2021
  • 27095795
24

repairing of balarampur bagmundi road from 1.00 kmp to 19.00 kmp by 20mm p.s, seal coat under balarampur highway sub-division of purulia highway division during the year 2020- 21(2nd call).

  • 27.72 Lakhs
  • West Bengal
  • Mar 9, 2021
  • 27091092
25

up-gradation of package-iii , mul-chandrapur national highway 930 from existing km 234/025 to km 273/719 ( design km 233/414 to km 273/088 ) to two lane with paved shoulder configuration in the state of maharashtra on epc mode ( repairs to major and mino

  • Ref. Document
  • Maharashtra
  • Mar 2, 2021
  • 27089501
26

up-gradation of package-iii , mul-chandrapur national highway 930 from existing km 234/025 to km 273/719 ( design km 233/414 to km 273/088 ) to two lane with paved shoulder configuration in the state of maharashtra on epc mode ( junction improvements )

  • Ref. Document
  • Maharashtra
  • Mar 2, 2021
  • 27089466
27

construction of approaches to 28 mtr span steel foot bridge over sigdi nallah at kumahar mohalla sigdi ( balance work ) plz refer boq

  • 1.13 Lakhs
  • Jammu And Kashmir
  • Mar 1, 2021
  • 27086493
28

fdr 2020-21 reconstruction of protection wall at ch 0/780 ofvellaramattom - paimattom road and protection works in vengalloor -oonnukal road vellaramattom bridge in in this estimate , construction of a protection wall in dr masonry for a length of 35m with an intermediate belt is proposed onnukal vangaloor road is one of the state highway sh 44 under pothanicadu section

  • 8.91 Lakhs
  • Kerala
  • Feb 27, 2021
  • 27085632
29

16-02 strengthening and resurfacing of roads under udf having row 30 feet to 50 feet and carriageway 3 . 00 m to 15 . 00 m . complete name of work as per nit 16 item no . 2

  • Ref. Document
  • Delhi
  • Mar 2, 2021
  • 27074643
30

widening/improvement to 4 ( four ) lane with paved shoulder of daboka - khatkhati stretch of nh-29 of package 5 starting from near ganpath gaur gaon at km 95 . 400 to kwaram taro village at km 113 . 330 in the state of assam

  • 176.84 Crore
  • Assam
  • Mar 11, 2021
  • 27074201
31

construction of new two-lane bridge with its approaches from km 0 . 000 to km 4 . 385 across river brahmaputra on nh-17 at jogighopa in the state of assam on epc mode

  • 504.26 Crore
  • Assam
  • Mar 11, 2021
  • 27074170
32

widening to 2 ( two ) lane with paved shoulder of imphal to jiribam section of nh-37 from design chainage 33.120 km to 49.140 km ( total length=16.02 km ) ( pkg-3 ) in the state of manipur on engineering, procurement & construction ( epc ) mode

  • 201.13 Crore
  • Manipur
  • Mar 11, 2021
  • 27074053
33

cs for ae for ( i ) 4 lane divided carriageway of missing link section of nh 39 ( rewa bypass ) from junction with nh 30 near bela to junction ( ii ) 2-lane with paved shoulder from 80 . 800 to km 120 . 125 ( satna-maihar section ) of nh 135bg in mp on epc basis .

  • Ref. Document
  • Delhi
  • Mar 22, 2021
  • 27072685
34

restoration of damaged footpath and bituminous carriageway for laying 1000 mm dia m s carrier pipe within 1400 mm dia casing pipe by kmda across and underneath of dum dum road near hanuman temple under kolkata north division pwd during the 20 21

  • 20.61 Lakhs
  • West Bengal
  • Mar 15, 2021
  • 27056739
35

construction of approach road at high school building gharjiyabathan under mmssy

  • 21.10 Lakhs
  • Chhattisgarh
  • Mar 8, 2021
  • 27047929
36

construction of approach road with high level bridge for ag . land of nanakbaydi ( chikhalda ) and gehalgaon village tehsil kukshi district dhar m . p .

  • Ref. Document
  • Madhya Pradesh
  • Mar 4, 2021
  • 27043019
37

development of sector-135 ( construction of rcc drain form genesis rotary sector-132 to punchsheel underpass and main . of drain with brick work form punchsheel underpass to irrigation drain sector-135 along expressway ) noida

  • 18.01 Crore
  • Uttar Pradesh
  • Mar 2, 2021
  • 27034955
38

piling work for construction of two lane rail overhead bridge in north railway of prayag lucknow railway section at km . 149/10-11 in lieu of level crossing no . 75a between prayag station to phaphamau railway station on mazar-bada baghara salory road

  • Ref. Document
  • Uttar Pradesh
  • Mar 2, 2021
  • 27034216
39

reconstruction of icadu bridge across pampa river in chengannur the overall length of bridge comes to 27 m . the bridge is designed as a two lane bridge having carriage way width of 10 . 5 m and 1 . 50 m footpath on both side . the foundation of the bridge is 1000 mm dia rcc bored cast in situ piles .

  • Ref. Document
  • Kerala
  • Mar 8, 2021
  • 27032911
40

construction of approach road from shree vihar main road to nature crest appartment in ward no . 03

  • Ref. Document
  • Orissa
  • Mar 1, 2021
  • 27024990
41

l/f of pipes for various habitations of achabal town , construction of filter operator quarter , construction of catch water drain , construction of approach road incld . leveling of premises and stablization of pipe network at various spots for wss a

  • Ref. Document
  • Jammu And Kashmir
  • Mar 1, 2021
  • 27024078
42

construction of balance work of two-lane with paved shoulder of joram-koloriang road ( nh-713 ) from existing km 50 . 050 to km 70 . 000 in the state of arunachal pradesh under sardp-ne on epc mode

  • 117.89 Crore
  • Arunachal Pradesh
  • Mar 16, 2021
  • 27016887
43

tender for maynaguri to changrabandha road from 0.00kmp to 1.40km,surfacing work under jalpaiguri highway division in the district of jalpaiguri

  • 48.62 Lakhs
  • West Bengal
  • Mar 4, 2021
  • 27009487
44

ie services for rehabilitation and upgradation to four lane configuration and strengthening of punjab/hp border to mo from km 11 . 000 to km 42 . 000 ( design length 28 . 700 km ) of nh-20 ( new nh-154 ) of pathankot-mandi section in hp on ham ( package-ia )

  • Ref. Document
  • Delhi
  • Mar 18, 2021
  • 27004974
45

operation and maintenance of two lane with paved shoulders of jodhpur barmer ( bagundi barmer ) section of nh 25 ( old nh 112 ) from km 0 . 000 to km 74 . 100 in the state of rajasthan

  • 15.91 Crore
  • Rajasthan
  • Mar 30, 2021
  • 27004841
46

engagement of user fee collection agency on the basis of competitive bidding through e-tender for dumbarwadi fp at km 125 . 700 for malshej ghat to ane ghat section of nh 222 ( new nh-61 ) of two lane section in maharashtra

  • 4.30 Crore
  • Maharashtra
  • Mar 8, 2021
  • 27003484
47

construction of approach roads and abutements on either sides of the rub at lc 104, rc gate tirupati - pakala section in chittoor district, in the state of andhra pradesh.(2nd call)

  • 1.76 Crore
  • Andhra Pradesh
  • Mar 17, 2021
  • 26993152
48

kiifb 2018-19 . improvements to hill highway first reach pulluva to thottilpalam 0/000 to 28/000 in kozhikode district ( phase-i 11/900 to 19/700 and 21/700 to 28/000 total length -14 . 10 km ) part ts construction

  • 41.85 Crore
  • Kerala
  • Mar 9, 2021
  • 26990550
49

designing construction and commissioning of 18.5 mtr. (clear span) double lane through type steel girder motorable bridge including construction of approach on both sides of bridge in km 14th rd (400) at mishriwala on jammu-akhnoor road.

  • Ref. Document
  • Jammu And Kashmir
  • Mar 2, 2021
  • 26984373
50

independent engineer services during operation and maintenance stage of six laning of agra etawah bypass section of nh2 from km . 199 . 660 to km . 323 . 525 in the state of uttar pradesh independent engineer services during operation and maintenance stage of six laning of agra etawah bypass section of nh2 from km . 199 . 660 to km . 323 . 525 in the state of uttar pradesh

  • Ref. Document
  • Uttar Pradesh
  • Mar 30, 2021
  • 26963980
51

mahishadal - geonkhali road from 0 . 00 kmp to 8 . 50 km , surfacing work mahishadal - geonkhali road from 0 . 00 kmp to 8 . 50 km , surfacing work under tamluk highway division in the district of purba medinipur . ( project id pd202128228s000 ) 3rd call

  • 1.46 Crore
  • West Bengal
  • Mar 15, 2021
  • 26963940
52

cs for ae for supervision of construction of 4lane greenfield delhi amritsar katra expressway from junction with jalandhar kapurthala near khojewal village to junction with pathankot-gurdaspur road near gurdaspur ) on epc under bmp in punjab

  • Ref. Document
  • Punjab
  • Mar 30, 2021
  • 26945512
53

box culvert ( 2x 2 . 00 x 2 . 00 ) at ch . 103 . 24km . of ramjibanpur palita palitpur natunhat road reconstruciton by replacing narrow poor culvert under burdwan north highway division in the dist of purba bardhaman_2nd call

  • 33.16 Lakhs
  • West Bengal
  • Mar 1, 2021
  • 26944767
54

switching ‘on’, ‘off’ and maintenance of street light installation for the year 2021- 2022 at kona expressway, howrah under group-

  • 4.77 Lakhs
  • West Bengal
  • Mar 16, 2021
  • 26940158
55

independent engineer services for widening and rehabilitation of existing two lane to four lane road champa korba katghora section of nh 149b from design chainage 0 . 000 to 38 . 200 ( pkg-i ) under nh ( o ) in chhattisgarh on hybrid annuity mode

  • Ref. Document
  • Chhattisgarh
  • Mar 11, 2021
  • 26927405
56

preparation of feasibility study and detailed project report for construction of two lane with paved shoulder through green field from vishwanathpur to kharkabasant new nh122a of sitamarhi district in bihar , consultancy services for preparation of detailed project report including la and other clearances for construction of two lane with paved shoulder through green field from vishwanathpur to kharkabasant ( new nh-122a ) of sitamarhi district in bihar . in the state of bihar .

  • Ref. Document
  • Bihar
  • Mar 8, 2021
  • 26921266
57

construction of six lane flyover at existing km 430 . 625 near tangra town and six lane vup at existing km 435 . 170 near mallian town including construction of new service road at location of flyover and vup on jalandhar amritsar section of nh-01 in pb .

  • Ref. Document
  • Punjab
  • Mar 23, 2021
  • 26874326
58

construction of approach road , rcc culvert etc

  • 2.12 Crore
  • Meghalaya
  • Mar 5, 2021
  • 26868349
59

rehabilitation and upgradation to four lane configuration and strengthening of mo to sihuni from km 42 . 000 to km 51 . 000 design length 8 . 330 km of nh20 new nh-154 of pathankot-mandi section in himachal pradesh on ham package ib

  • 517.97 Crore
  • Himachal Pradesh
  • Mar 11, 2021
  • 26847638
60

two lane construction work of rampura to ninawali-naraul-rathauranpura mp border in bangra jagmmanpur

  • Ref. Document
  • Uttar Pradesh
  • Mar 2, 2021
  • 26813773
61

nhidcl / manipur / civil work / i-j / / 2020 / pkg-2 widening to 2 ( two ) lane with paved shoulder of imphal to jiribam section of nh-37 from design chainage 15 . 940 km to 33 . 120 km ( total length 17 . 180 km ) ( pkg-2 ) in the state of manipur on epc mode

  • 142.05 Crore
  • Manipur
  • Mar 1, 2021
  • 26789987
62

widening/improvement to 4 ( four ) lane with paved shoulder from km 51 . 246 to km 66 . 000 ( design chainage 50 . 710 to 65 . 923 ) of parokhuwa - dokmoka section ( package 2 ) of nh 29 in the state of assam

  • 172.91 Crore
  • Assam
  • Mar 1, 2021
  • 26789985
63

construction of eight lane access controlled expressway from km 3 . 000-km 20 . 200 ( shirsad to akloli section-spur of vadodara mumbai expressway ) in the state of maharashtra on hybrid annuity mode under bharatmala pariyojana ( phase ii-package xiv )

  • 1122.76 Crore
  • Uttar Pradesh
  • Mar 25, 2021
  • 26777190
64

construction of eight lane access controlled expressway from km 20 . 200-km 43 . 000 ( akloli to amne section-spur of vadodara mumbai expressway ) in the state of maharashtra on hybrid annuity mode under bharatmala pariyojana ( phase ii-package xv )

  • 1215.30 Crore
  • Uttar Pradesh
  • Mar 25, 2021
  • 26777062
65

design, construction, successful testing & commissioning of 0.57 mgd rapid sand filtrations plant with construction of flocculater/flash mixer near rapid sand filtration plant , construction of 1.0 lac gallons capacity clear water sump underground, construction of 1.30 lac gallon capacity overhead tank, construction of protection works including saddle blocks and construction of approach road, construction of chowkidar’s quarter with bath room, chain link fencing around structures, land develo...

  • 4.69 Crore
  • Jammu And Kashmir
  • Mar 1, 2021
  • 26775960
66

consultancy services for authority engineer for supervision of balance work of construction of two/four lane with paved shoulder from km . 422 . 00 to 523 . 600 ( chitradurga to shivamogga section ) of nh-13 in the state of karnataka on epc mode

  • Ref. Document
  • Karnataka
  • Mar 15, 2021
  • 26759102
67

cs for ae for sc of four laning of nh-965 g from ( a ) patas-vasunde phata-baramati and baramati length 41 . 369 km ( package-i ) ( b ) km 41 . 369 to km 83 . 500 ( package-ii ) and ( c ) km 83 . 500 to km 130 . 202 ( package-iii ) in maharashtra under bmp on epc mode

  • Ref. Document
  • Delhi
  • Mar 3, 2021
  • 26757471
68

consultancy services for authoritys engineer for supervision of construction of two lane with paved shoulders road of tamenglong to muhur in the state of manipur ( pkg-1 , 2 , 3 and 4 ) on epc mode

  • Ref. Document
  • Manipur
  • Mar 12, 2021
  • 26751097
69

construction of four lane rob including approaches complete in lieu of lc no . 16a at ir km 517/02 03 between stations ambali road sanand of ahmedabad-viramgam section of ahmedabad division of western railway

  • 64.96 Crore
  • Gujarat
  • Mar 9, 2021
  • 26747355
70

construction of four lane divided carriageway with paved shoulder from patan ( near khan sarover lake ) to gojariya km 49 . 775 ( design ) to km 128 . 950 ( design ) length 79 . 175 km of nh-68 in the state of gujarat under nhdp v on epc mode

  • 782.29 Crore
  • Gujarat
  • Mar 11, 2021
  • 26731695
71

construction of 4 lane divided carriageway of missing link section of nh 39 ( rewa bypass ) from junction with nh 30 near bela to junction with mprdc ring road near silpara on sh9 ( design length 13 . 100km ) under bmp in the state of mp on epc mode .

  • 267.76 Crore
  • Madhya Pradesh
  • Mar 10, 2021
  • 26731631
72

construction of two lane with paved shoulder from km 80 . 800 to km 120 . 125 ( satna-maihar section ) of nh 135bg ( design length 39 . 325 km ) under bharatmala pariyojana in madhya pradesh on epc mode

  • 440.81 Crore
  • Madhya Pradesh
  • Mar 10, 2021
  • 26731609
73

project management consultancy services for construction of highway 2- lane tunnel including approaches across the mussoorie hills ( design chainage km 0.700 of cart-maccanzi road to km 156.700 of tyuni-chakrata-mussoorie-dhanolty-new tehri road of nh-707a ) in the state of uttarakhand , a . for phase 1 & 2 ( dpr and preconstruction activities ) , local consultants remuneration for local professional staff ( inclusive of per diem allowance ) , support staff ( inclusive of per die...

  • Ref. Document
  • Delhi
  • Mar 4, 2021
  • 26731075
74

strengthing and widening of existing carriageway to 10 m in km . 198 160 to 229 160 ( shendri-barshi-kuslamb ) section of n . h . 548 c ie tembhurni kurdwadi barshi kuslamb road in the state of maharashtra .

  • 58.73 Crore
  • Maharashtra
  • Mar 5, 2021
  • 26716815
75

development of 6-lane access controlled ludhianabathinda greenfield highway sec of nh754ad from jn . with mogabarnala rd nh703 to jn . with delhikatra exp way ne5 ludhiana vill ballowal as a part of ludhianaajmer ec in punjab on ham under bmp ph-1 pkg2

  • 1015.05 Crore
  • Delhi
  • Mar 8, 2021
  • 26671479
76

construction of 4by6 lane greenfield ludhiana rupnagar nh 205k from junction with ne5 near to manewal ludhiana to junction with nh205 bheora rupnagar including spur to kharar with ludhiana bypass under bmp in punjab on ham pkg2 of total length 46 . 80

  • 992.71 Crore
  • Delhi
  • Mar 4, 2021
  • 26650948
77

development of of six lane access control greenfield highway of delhi-saharanpur-dehradun ec under bmp from design chainage 56 . 500 ( vill-karaunda mahajan ) to design chainage 82 . 000 ( vill-khyawari ) in up on epc mode ( package-iii ) .

  • 641.98 Crore
  • Uttaranchal
  • Mar 4, 2021
  • 26639551
78

development of 6 lane access control greenfield highway of delhi saharanpur dehradun economic corridor under bharatmala pariyojana from design chainage 27 . 000 vill lohadda to design chainage 56 . 500 vill karaunda mahajan in up on epc mode ( package-ii )

  • Ref. Document
  • Uttar Pradesh
  • Mar 4, 2021
  • 26639534
79

development of six lane abhanpur - magerlod section of nh130 cd road from km 00 . 000 to km 42 . 852 under raipur-visakhapatnam economic corridor in chhattisgarh ( pkg cg-1 ) on ham

  • 1032.53 Crore
  • Chhattisgarh
  • Mar 4, 2021
  • 26639503
80

development of six lane koraput- pattangi section of nh-130 cd road from km 293 . 000 to km 338 . 500 under raipur-visakhapatnam ec in chhattisgarh on ham ( package od-6 )

  • 1121.55 Crore
  • Chhattisgarh
  • Mar 4, 2021
  • 26639489
81

upgradation of nh 130c abhanpur to paund from nh km 0 . 000 to km 40 . 380 to two lane with paved shoulders with flexible pavement in the state of chhattisgarh on engineering , procurement and construction ( epc ) mode

  • 144.47 Crore
  • Chhattisgarh
  • Mar 2, 2021
  • 26623276
82

development , operation and maintenance of small wayside amenities on different sections of national highway on lease basis

  • Ref. Document
  • Delhi
  • Mar 2, 2021
  • 26603643
83

up-gradation to four lane with paved shoulder configuration of the highway starting from existing km 88 . 400 ( savali vihir ) to km 163 . 400 ( start of ahmednagar bypass ) ( design length-75 . 000 km ) section of nh-160 in maharashtra under bmp on epc mode

  • 430.11 Crore
  • Maharashtra
  • Mar 1, 2021
  • 26603022
84

widening and strengthening work for two lane of remaining portion of bah udi road ( mdr ) in km-13 to 21 , in distt . agra .

  • Ref. Document
  • Uttar Pradesh
  • Mar 1, 2021
  • 26504412
85

development of six lane badakumari karki section of nh 130 cd road from km 179 . 000 to km 226 . 500 under raipurvisakhapatnam economic corridor in odisha on ham ( package od-3 )

  • 1060.12 Crore
  • Orissa
  • Mar 1, 2021
  • 26466350
86

development of six lane karki kaliagura section of nh130-cd road from km 226 . 500 to km 249 . 000 under raipur visakhapatnam economic corridor in the state of odisha on ham ( package od-4 )

  • 483.01 Crore
  • Orissa
  • Mar 1, 2021
  • 26446340
87

construction of four lane ring road bypass around srinagar city from km 0 . 000 to km 42 . 100 phase i on engineering , procurement and construction epc mode under nhdp phase vii in the union territory of jammu and kashmir under bmp

  • 1446.21 Crore
  • Jammu And Kashmir
  • Mar 4, 2021
  • 26387391
88

ie services for supervision of four laning of munger to kharia village junction pkg 01 , kharia village junction to start of existing bhagalpur bypass pkg 2 bhagalpur bypass to rasulpur pkg 3 rasulpur to mirzachauki pkg 4 on ham in bihar

  • Ref. Document
  • Bihar
  • Mar 10, 2021
  • 26374085
89

development of additional wayside amenities for truckers along the agra lucknow expressway project on bot basis in ppp mode package v selection of developer for development of additional wayside amenities for truckers along the agra lucknow expressway project on bot basis in ppp mode package v

  • Ref. Document
  • Uttar Pradesh
  • Mar 1, 2021
  • 26292284
90

four laning of sannur to bikarnakatte section from existing km 698 . 850 ( design km 691 . 350 ) to existing km 744 . 190 ( design km 736 . 362 ) of nh-169 under nhdp-iv in the state of karnataka ( package-iii )

  • 1146.37 Crore
  • Karnataka
  • Mar 9, 2021
  • 26266067
91

setting up of fuel stations along purvanchal expressway setting up of fuel stations on coco model at eight specified places along 06 lane access controlled purvanchal expressway

  • Ref. Document
  • Uttar Pradesh
  • Mar 1, 2021
  • 26258733
92

development of six lane aluru-jakkuva section of nh-130-cd road from km 365 . 033 to km 396 . 800 under raipur-visakhapatnam economics corridor in the state of andhra pradesh on hybrid annuity mode package- 1 ( ap )

  • 857.69 Crore
  • Delhi
  • Mar 1, 2021
  • 26226395
93

development of six lane jakkuva-korlam section of nh-130-cd road from km 396 . 800 to km 421 . 100 under raipur-visakhapatnam economics corridor in the state of andhra pradesh on hybrid annuity mode package-2 ( ap )

  • 584.80 Crore
  • Delhi
  • Mar 1, 2021
  • 26226378
94

development of six lane kantakapalle-sabbavaram section of nh-130-cd road from km 445 . 100 to km 464 . 662 under raipur-visakhapatnam economics corridor in the state of andhra pradesh on hybrid annuity mode package-4 ( ap )

  • 549.99 Crore
  • Delhi
  • Mar 1, 2021
  • 26226373
95

development of six lane korlam-kantakapalle section of nh-130-cd road from km 421 . 100 to km 445 . 100 under raipur-visakhapatnam economics corridor in the state of andhra pradesh on hybrid annuity mode package-3 ( ap )

  • 647.25 Crore
  • Delhi
  • Mar 1, 2021
  • 26226372
96

construction of four-lane greenfield delhi-katra expressway from junction with amritsar-tanda road ( nh-503a ) near sri hargobindpur to junction with pathankot-gurdaspur road ( nh-54 ) near gurdaspur ( km362 . 420-km397 . 700 ) on epc mode under bmp in punjab

  • 1135.34 Crore
  • Delhi
  • Mar 9, 2021
  • 26120832
97

development of six lane chittoor-thatchur highway from km 61 . 380 to km 96 . 040 on hybrid annuity mode under bharatmala pariyojna in the state of andhra pradesh and tamil nadu ( package-iii )

  • 844.31 Crore
  • Delhi
  • Mar 1, 2021
  • 26091921
98

construction of 8lane ac expressway starting from mp-gujarat border near chhayan village and ending after bridge over hadaf river near hathiyavan village ( ch . 696 . 920 to 729 . 755 ) section of delhi-vadodara ga ( nh-148n ) on epc mode under bmp in gujarat

  • 1417.70 Crore
  • Gujarat
  • Mar 25, 2021
  • 24680582
Tell us about your Product / Services,
We will Find Tenders for you
Top

Copyright © 2021 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail