51641209 refer enclosed attachment 02 to static equipment sor for furthertag wise details of equipment. 1191 pressure vessels / separators / columns (all type) 1192 up to 10mt 1193 above 10 mt and up to 30 mt 1194 above 30 mt and up to 50 mt 1195 above 50
50894081 Corrigendum : of close coils 01 no. operable at 24 v dc (85% 110%) , no. of trip coils 02 nos. ,operabale at 24 v dc ( 70% 110%) for shunt trip feature forseries trip shall also be enabled. iv) provision for supervision of the two indepandent trip circuits
51270253 Corrigendum : (b) emergency rescue device with audio announcer, nudging attendent service, ring lighting led.(c) digital direction and position indicator in car and at all landings.(d) emergency alarm at the main landing with alarm bell button in car.
49525053 Corrigendum : the service line should be laid at least 45 cm below ground level.note: road cut and restoration is not part of this item and paid separately. 290 for connection with 20 mm dia mdpe/ppr c pipe length up to 05 mtr. 291 road cutting for house hold service
51677932 lifting, placing on sleeper/racks at all elevation, levelling, alignment, jointing of flanges including insertion of gaskets and bolting and supply of manpower for testing and flushing, if required.for steam jacketed piping, erection shall be measured