}

Construction, Excavation, Dismantling Work, Services, Transportation and Mailing Service, Loading Work-Assam

Hindustan Paper Corporation Limited has published Construction, Excavation, Dismantling Work, Services, Transportation and Mailing Service, Loading Work. Submission Date for this Tender is 29-01-2016. Dismantling Work Tenders in Assam. Bidders can get complete Tender details and download the document.




Tender Notice

8917079
Construction, Excavation, Dismantling Work, Services, Transportation and Mailing Service, Loading Work
Open Tender
Indian
Assam
29-01-2016

Tender Details

Annual Maintenance Contract For Mechanical Maintenance Of Paper Machine Special Items: 1 [1.1]:Overhauling Of Double Disc Refiner Of Both M/C Including Motor Alignment 2 [1.2]:Overhauling Of Loading Device- Both M/C Double Disc Refiner (Uninstalled Condition) 3 [1.3]:Dismantling & Refitting Of Loading Device- Both M/C Double Disc Refiner 4 [1.4]:Dismantling & Refitting Of Front Cover Of Both Machine Double Disc Refiner For Necessary Cleaning/Checking. 5 [1.5]:Dismantling & Refitting Of Front Cover, Rotor Disc Of Both Machine Double Disc Refiner For Cleaning/Checking. 6 [1.6]:Dismantling & Refitting Of Floating Disc Of L&T Machine Double Disc Refiner For Checking/Rectification Of Mechanical Jamming. 7 [1.7]:Changing Of Shaft Sleeve Of L&T M/C Double Disc Refiner 8 [1.8]:Changing Of Tackles- Both M/C Double Disc Refiner 9 [2.1]:Overhauling Of Jessop M/C Brushing Refiner Including Alignment 10 [2.2]:Overhauling Of Loading Device- Jessop M/C Brushing Refiner 11 [2.3]:Dismantling & Refitting Of Loading Device- Jessop M/C Brushing Refiner 12 [2.4]:Dismantling & Refitting Of Rotor Assembly For Necessary Checking- Jessop M/C Brushing Refiner 13 [2.5]:Changing Of Stator- Jessop M/C Brushing Refiner After Opening Rotor Unit 14 [3.1]:Overhauling Of L&T M/C Wide Angle Refiner Including Shaft , Rotor, Stator, Sleeve , Bearing Changing Including Motor & Gearbox Alignment 15 [3.2]:Overhauling Of Loading Device- L&T M/C Wide Angle Refiner 16 [3.3]:Dismantling & Refitting Of Loading Device- L&T M/C Wide Angle Refiner 17 [3.4]:Changing Of Rotor, Stator, Sleeve(S)- L&T M/C Wide Angle Refiner 18 [4.1]:Dismantling And Refitting Of Headbox Back Cover Of Both Machine For Cleaning 19 [4.2]:Dismantling And Refitting Of Headbox Side Cover For Cleaning/Leakage Attending 20 [5.1]:Changing Of Wire (Both Machine) 21 [6.1]:Overhauling Of Wire Guide Unit (Both Machine) 22 [6.2]:Dismantling And Refitting Of Wire Guide Unit (Both Machine) 23 [7.1]:Dismantling & Refitting Of Breast Roll (Both Machine) 24 [7.2]:Changing Of Bearing (Installed Condition) - Breast Roll (Both Machine) 25 [7.3]:Checking Of Bearing (Installed Condition) - Breast Roll (Both Machine) 26 [7.4]:Lowering And Lifting Of Breast Roll Of Both Machine For Any Purpose (Excluding Wire Changing, Breast Roll Changing And Its Bearing Checking/Changing) 27 [8.1]:Dismantling & Refitting Of Wire Turning Roll Of Both Machine (Complete In All Respect) 28 [8.2]:Changing Of De Bearing (Installed Condition) For Both Machine Wire Turning Rolls Including Dismantling And Refitting Of Drive Shafts. 29 [8.3]:Changing Of Nde Bearing (Installed Condition) For Both Machine Wire Turning Rolls 30 [9.1]:Overhauling Of Suction Couch Roll Of Both Machine (Complete In All Respect) 31 [9.2]:Overhauling Of Suction Couch Roll Of Both Machine (Suction Box Only) 32 [9.3]:Dismantling & Refitting Of Suction Couch Roll Of Both Machine (Complete In All Respect) 33 [9.4]:Changing Of De Bearing Of Suction Couch Roll Of Both Machine 34 [9.5]:Changing Of Nde Bearing Of Suction Couch Roll Of Both Machine 35 [9.6]:Changing Of Internal Bearing Of Suction Couch Roll Of Both Machine 36 [10.1]:Dismantling & Refitting Of Dandy Roll (Both Machine) 37 [10.2]:Assistance For Dandy Roll Covers Changing , Logo Fitting, Soldering Including Roll Shifting. 38 [11.1]:Dismantling & Refitting Of Wire Roll (Both Machine) 39 [12.1]:Changing Of Press Felt (Both Machine) 40 [13.1]:Overhauling Of Suction Press Roll Of Both Machine (Complete In All Respect) 41 [13.2]:Overhauling Of Suction Press Roll Of Both Machine (Suction Box Only) 42 [13.3]:Dismantling & Refitting Of Suction Press Roll Of Both Machine (Complete In All Respect) 43 [13.4]:Changing Of De Bearing Of Suction Press Roll Of Both Machine 44 [13.5]:Changing Of Nde Bearing Of Suction Press Roll Of Both Machine 45 [13.6]:Changing Of Internal Bearing Of Suction Press Roll Of Both Machine 46 [14.1]:Overhauling Of Suction Pick Up Roll Of Both Machine (Complete In All Respect) 47 [14.2]:Overhauling Of Suction Pick Up Roll Of Both Machine (Suction Box Only) 48 [14.3]:Dismantling & Refitting Of Suction Pick Up Roll Of Both Machine (Complete In All Respect) 49 [14.4]:Changing Of De Bearing Of Suction Pick Up Roll Of Both Machine 50 [14.5]:Changing Of Nde Bearing Of Suction Pick Up Roll Of Both Machine 51 [14.6]:Changing Of Internal Bearing Of Suction Pick Up Roll Of Both Machine 52 [15.1]:Dismantling & Refitting Of Granite Roll Of Both Machine (Complete In All Respect) 53 [15.2]:Changing Of Bearing Of Granite Roll Of Both Machine 54 [15.3]:Checking Of Bearing Of Granite Roll Of Both Machine 55 [16.1]:Dismantling & Refitting Of Press Felt Roll And All Paper Roll (Both Machines) 56 [17.1]:Overhauling Of Press Swimming Roll And Calender Swimming Roll Of Both Machine 57 [17.2]:Dismantling & Refitting Of Press Swimming Roll Of Utmal Machine (Complete In All Respect) 58 [17.3]:Dismantling & Refitting Of Press Swimming Roll Of Jessop Machine (Complete In All Respect) 59 [18.1]:Overhauling Of Dryer Cylinder Of Both Machine (One Side Head/ Journal Changing) 60 [18.2]:Overhauling Of Stationary Joint Of Dryer Cylinder Of Both Machine 61 [18.3]:Dismantling & Refitting Of Dryer Of Both Machine (Complete In All Respect) 62 [18.4]:Dismantling & Refitting Of Dryer Gear Casing Cover For Checking Of Gear Of Both Machine Dryer (Including Stationery Joint, Bearing) 63 [18.5]:Dismantling & Refitting Of Inspection Cover For Checking Of Any Gear For Both Machine Dryer 64 [18.6]:Dismantling & Refitting Of Drain Cover Of Both Machine Dryer 65 [18.7]:Changing Of De Bearing In Installed Condition Of Dryer Cylinder Of Both Machine 66 [18.8]:Changing Of Nde Bearing In Installed Condition Of Dryer Cylinder Of Both Machine 67 [18.9]:Changing Of Idler Gear With Drive Of Both Machine Dryer Including Dismantling & Refitting Of Drive Shaft, Changing Of Idler Gear Bearing And Shaft If Required. (Complete In All Respect) 68 [18.10]:Changing Of Idler Gear Of Both Machine Dryer (Complete In All Respect) 69 [18.11]:Changing Of Main Gear Of Both Machine Dryer (Complete In All Respect) 70 [18.12]:Changing Of Man Hole Cover Gasket Of Dryer Cylinder Of Both Machine 71 [18.13]:Changing Of Nip/Casio Joint Of Jessop Machine Dryer 72 [18.14]:Changing Of Condensate Sight Glass Of Both Machine. 73 [18.15]:Checking Of Nde Bearing In Installed Condition Of Dryer Cylinder Of Both Machine 74 [18.16]:Checking / Changing Of Siphon Shoe Of Dryer Cylinder Of Both Machine 75 [18.17]:Checking Of De Bearing In Installed Condition Of Dryer Cylinder Of Both Machine 76 [18.18]:Positioning Of Nde Bearing Housing On Rocker Arm Of Dryer Cylinder Of Jessop Machine 77 [19.1]:Overhauling Of Dryer Rope Pulley 78 [19.2]:Dismantling And Refitting Of Dryer Rope Pulley 79 [20.1]:Dismantling & Refitting Of Dryer Felt Roll Of Both Machine (Top Hood) (Complete In All Respect) 80 [20.2]:Dismantling & Refitting Of Dryer Felt Roll Of Both Machine (Machine Floor And Bottom Hood) 81 [20.3]:Changing Of Bearing (Installed Condition) - Top Hood Dryer Felt Roll Of Both Machine. 82 [20.4]:Checking Of Bearing (Installed Condition) - Top Hood Dryer Felt Roll Of Both Machine. 83 [21.1]:Changing Of Bearing (Installed Condition) - Dryer Felt Stretcher Roll Of Jessop Machine. 84 [21.2]:Checking Of Bearing (Installed Condition) - Dryer Felt Stretcher Roll Of Jessop Machine. 85 [22.1]:Dismantling & Refitting Of Dryer Felt Roll Of Jessop Machine Fitted With Gear Casing. 86 [22.2]:Changing Of De Bearing (Installed Condition) - Jessop Machine Dryer Felt Rolls Fitted With Gear Casing . 87 [22.3]:Checking Of De Bearing (Installed Condition) - Jessop Machine Dryer Felt Rolls Fitted With Gear Casing. 88 [23.1]:Dismantling & Refitting Of Calender Rolls (Both Machine) 89 [23.2]:Changing Of Bearing Of Calender Queen Roll (Both Machine) In Uninstalled Condition. 90 [23.3]:Checking Of Bearing Of Calender Queen Roll (Both Machine) In Uninstalled Condition. 91 [24.1]:Changing Of Bearing Of Reel Spool Of Both Machine 92 [24.2]:Checking Of Bearing Of Reel Spool Of Both Machine 93 [25.1]:Dismantling & Refitting Of Pope Reel (Both Machine) (Complete In All Respect) 94 [26.1]:Dismantling & Refitting Of Utmal Machine Size Press Roll 95 [27.1]:Changing Of Bearing (Installed Condition) For Wire Rolls, Press Felt Rolls, Machine Floor And Under Hood Dryer Felt Rolls, Paper Roll Of Both Machine 96 [27.2]:Checking Of Bearing (Installed Condition) For Wire Rolls, Press Felt Rolls, Machine Floor And Under Hood Dryer Felt Rolls, Paper Roll Of Both Machine 97 [28.1]:Changing Of Bearing (Uninstalled Condition) For Both Machine - Wire Roll , Press Felt Roll , All Types Of Dryer Felt Roll , Paper Roll , Breast Roll , Wire Turning Roll , Dandy Roll 98 [28.2]:Checking Of Bearing (Uninstalled Condition) For Both Machine - Wire Roll , Press Felt Roll , All Types Of Dryer Felt Roll , Paper Roll , Breast Roll , Wire Turning Roll , Dandy Roll 99 [29.1]:Shifting Of Any Roll With Eot Crane / Loading/ Unloading In Truck With Box 100 [29.2]:Loading Of Any Roll Of Both Machine In Roll Grinding M/C, Bracket & Wheel Changing,Setting Of Roll & Unloading Of Roll After Mechanical Work. 101 [30.1]:Checking/Changing Of De/ Nde Side Head And Shell Fixing Bolts Of Suction Rolls Of Both Machine In Installed Condition 102 [31.1]:Changing Of Coupling Elements And Bolts Of Both Machine Drive Input Shafts (Motor To Gearbox) 103 [31.2]:Checking Of Coupling 104 [32.1]:Overhauling Of Doctoring Unit Of Any Roll In Both Machine 105 [32.2]:Dismantling And Refitting Of Doctoring Unit Of Any Roll In Both Machine 106 [32.3]:Changing Of Doctor Blade Of Any Roll In Both Machine 107 [33.1]:Dismantling & Refitting Of Dsa Repulper Including Motor And Gearbox 108 [33.2]:Changing Of Dsa Repulper De Side Bearing (Complete In All Respect) 109 [33.3]:Changing Of Dsa Repulper Nde Side Bearing (Complete In All Respect) 110 [33.4]:Changing Of Dsa Sector 111 [33.5]:Cleaning Of Dsa Nozzle Including Individual Shower Pipes 112 [34.1]:Overhauling Of Both M/C Pv Fan 113 [34.2]:Changing Of Bearing Of Both M/C Pv Fan 114 [34.3]:Checking Of Bearing Of Both M/C Pv Fan 115 [35.1]:Overhauling Of Both M/C Hood Exhaust Fan 116 [36.1]:Overhauling Of Main Vacuum Pump Of Both Machine (Uninstalled Condition)Including Body, Casing, Impeller Repairing If Required 117 [36.2]:Dismantling & Refitting Of Main Vacuum Pump Of Both Machine 118 [36.3]:Changing Of De Side Bearing Of Main Vacuum Pump Of Both Machine . 119 [36.4]:Changing Of Nde Side Bearing Of Main Vacuum Pump Of Both Machine In Installed Condition. 120 [36.5]:Checking Of De/Nde Side Bearing Of Main Vacuum Pump Of Both Machine In Installed Condition. 121 [37.1]:Overhauling Of Both M/C Vacuum Flume Pump In Uninstalled Condition 122 [37.2]:Dismantling & Refitting Of Both Machine Vacuum Flume Pump (Including Motor) 123 [37.3]:Changing Of Bearing Of Both M/C Vacuum Flume Pump In Installed Condition(Including Dismantling And Refitting Of Motor) 124 [38.1]:Overhauling Of Primary Pressure Screen Of Both Machine 125 [38.2]:Dismantling & Refitting Of Top Cover & Basket (Screen Rotor If 126 [38.3]:Dismantling & Refitting Of Top Cover For Checking/ Cleaning Of Both M/C Primary Pressure Screen 127 [39.1]:Overhauling Of Secondary Pressure Screen Of Both Machine 128 [39.2]:Dismantling & Refitting Of Top Cover & Basket (Rotor If Necessary), Necessary Checking/ Shaft Sleeve Changing & Gland Packing/ Jam Cleaning Of Both M/C Secondary Pressure Screen 129 [39.3]:Dismantling & Refitting Of Top Cover For Cleaning/Checking Of Both M/C Secondary Pressure Screen 130 [40.1]:Dismantling And Refitting Of Quarternary Cleaner Cone Of Both Machine 131 [41.1]:Dismantling And Refitting Of Deculator Cleaner Cone Of Both Machine (All Types) 132 [41.2]:Changing Of Deculator Sight Glass Of Both Machine 133 [42.1]:Overhauling Of Vibrating Screen 134 [42.2]:Dismantling And Refitting Of Vibrating Screen Net 135 [42.3]:Repairing Of Vibrating Screen Net 136 [43.1]:Dismantling & Refitting Of Wall Mounted Ventilation Fan In Finishing House 137 [44.1]:Dismantling & Refitting Of Finishing House Ventilation Fan Duct Filter 138 [45.1]:Repairing Of Pallets Of Finishing House 139 [46.1]:Overhauling Of Vertical Hydropulper Of Finishing House 140 [47.1]:Changing Of Slow Speed Conveyor Belt Of Sheet Cutter As 21 (Cutter # 3, 4, 5) 141 [47.2]:Changing Of High Speed Conveyor Belt (Tape) Of Sheet Cutter As 21 (Cutter # 3, 4, 5) 142 [48.1]:Changing Of Slow Speed Conveyor Belt Of Sheet Cutter As 316 (Cutter # 1, 2) 143 [48.2]:Changing Of High Speed Conveyor Belt Of Sheet Cutter As 316 (Cutter # 1, 2) 144 [49.1]:Assistance For Knife Changing Of Sheet Cutters 145 [50.1]:Assistance For Levelling Of Rewinder Rider Rolls 146 [51.1]:Overhauling Of Both M/C Rewinder Blowers,After Dryer P V Fan,Dc Cooling Blower,Qcs Blower 147 [51.2]:Changing Of Bearing Of Both M/C Rewinder Blowers,After Dryer P V Fan,Dc Cooling Blower,Qcs Blower 148 [51.3]:Checking Of Bearing Of Both M/C Rewinder Blowers,After Dryer P V Fan,Dc Cooling Blower,Qcs Blower 149 [33.6]:Overhauling Of Dsa Screw Conveyor Geared Motor/Oscillating Shower Geared Motor 150 [33.7]:Dismantling & Refitting Of Dsa Screw Conveyor Geared Motor/Oscillating Shower Geared Motor 151 [31.3]:Changing Of Coupling Elements And Bolts Of Both Machine Drive Output Shafts (Gearbox To Roll)

Key Value

Document Fees
INR 2000 /-
EMD
INR 22000.0 /-
Tender Value
INR 9.63 Lakhs /-
Disclaimer :
We takes all possible care for accurate & authentic tender information, however Users are requested to refer Original source of Tender Notice / Tender Document published by Tender Issuing Agency before taking any call regarding this tender.
Tell us about your Product / Services,
We will Find Tenders for you

Copyright © 2025 · All Rights Reserved. Terms of Usage | Privacy Policy

For Tender Information Services Visit : TenderDetail