| 1 | Dismantling and Transportation of 1000mm belt structure from TB I Belt at Balgi Mine to 17 LE 1st Belt at Singhali Mine(Up to Initial Lead of 100 m) |
| 2 | Dismantling and Transportation of 1000mm belt structure from TB 1 Belt at Balgi Mine to 17 LE 1st Belt at Singhali Mine(Extra |two Leads)=(617.14*0.15*2). |
| 3 | Dismantling and Transportation of belt structure of 1000mm belt Conveyor from 32 1st Belt & 32 2nd Belt to 17 L E 2nd Belt(Up to Initial Lead of 100 m ). |
| 4 | Dismantling and Transportation of belt structure of 1000mm belt Conveyor from 32 1st Belt & 32 2nd Belt to 17 L E 2nd Belt(Extra six Leads)=(617.14*0.15*6). |
| 5 | Dismantling and Transportation of belt structure of 1000mm belt Conveyor from 30L Belt to 17 L E/ 29D Belt(Up to Initial Lead of 100 m). |
| 6 | Dismantling and Transportation of belt structure of 1000mm belt Conveyor from 30L Belt to 17 L E/ 29D Belt(Extra five |Leads)=(617.14*0.15*5). |
| 7 | Dismantling and transportation of 1000mm size double drive drum with loop take-up up to the track end with a lead of 100m (for each additionl distance of 100 m, 15% additional will be paid for each lead). Materials will be provided by colliery management including Electrical and Mechanical hand. (for underground) |
| 8 | Dismantling and Transportation of 1000mm PVC belting from TB 1 at Balgi Mine to 17 LE Ist belt of Singhali UG. |
| 9 | Dismantling and Transportation of 1000mm PVC belting from 30L/28R Belt to 17 LE 2nd Belt & 17L E/29D Belt(Up to Initial Lead of 1 km ). |
| 10 | Dismantling and Transportation of 1000mm PVC belting from 30L/28R Belt to 17LE 2nd Belt & 17L E/29D Belt(Extra three Leads)=(77.14*0.15*3). |
| 11 | [Installation of 1000mm size double drive drum with loop take-up at 17 L E Ist Belt, 17 LE 2nd Belt & 17 L E/29 D Belt. |
| 12 | Installation of 1000mm belt structure in 17 LE 1st belt, 17 LE 2nd belt & 17 L E/29 D belt |
| 13 | Laying and fastening of PVC belting 1000 mm on conveyor structure at 17 LE Ist Belt, 17 LE 2nd Belt & 17 L E/29 D Belt. |
| 14 | Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) |
| 15 | Malma Cleaning/removal of silt, muck, debris etc deposited in underground galleries, sump,drain and stacking/loading the same into mine tub or into belt conveyor as per the site requirement within a lead of 30 m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) |
| 16 | Loading of material (Cement) into tub on surface within a lead of 50m. |
| 17 | Loading of material (Sand) into tub on surface within a lead of 50m. |
| 18 | Loading of material (Stone chips) into tub on surface within a lead of 50m. |
| 19 | Unloading of material (Cement) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) |
| 20 | Unloading of material (Sand) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) |
| 21 | Unloading of material (Stone chips) at destination in U/G within a lead of 50m. (For each additional lead of 50 m subject to 0.50 Km maximum, there will 14.67% increase in rate) |
| 22 | Manual pushing of (Cement) tubs in underground (30 m) 390/30= 13 Lead (13*4.03)=Rs. 52.39 |
| 23 | Manual pushing of (Sand) tubs in underground (30 m) 390/30= 13 Lead (13*4.03)=Rs. 52.39 |
| 24 | Manual pushing of (Stone Chips) tubs in underground (30 m) 390/30= 13 Lead (13*4.03)=Rs. 52.39 |
| 25 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level:1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). |
| 26 | Dismantling, transportation and laying/ installation of endless haulage considering at a lead of 2km. max. from old site to new site in UG or from surface to UG. |
| 27 | Transportation of track line of 30lbs from old working to site of installation in UG for a lead of 2 km. Materials will be provided by colliery management including Electrical and Mechanical Hands. |
| 28 | Laying of haulage track line with 30lbs rail in underground. Materials(e.g. trolley, haulage facility etc) will be provided by colliery management. |
| 29 | Packing of haulage track (1.20 m wide & 0.20 m thick) in UG with packing materials available within a lead of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. |
| 30 | Transportation, Laying & splicing of Haulage rope (1000m Length & Dia. 19/22mm) from surface to required UG site or old working to new working or vice-versa at the lead of 2 km max. Materials(e.g. trolley, haulage facility, rope splicing, etc) will be provided by colliery management. |
| 31 | Transportation of new or dismantled 6\\" Pipes from surface/old workings to UG, laying, joining & installation of 6\\" pipes at UG laying site from the track end upto an average lead upto 100m. Materials like pipe fitted with flange/ socket, nut bolts, and necessary gas with cutting facility. |
| 32 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |