| 1 | (a) Excavation in foundation in ordinary soil (Loam, clay or sand) including lift upto 1.50 M. and lead upto 30 M. and including filling watering and ramming of excavated earth into the trenches or into the space between the building and the sides of foundation trenches or into the plinth and removal and disposal of surplus earth as directed by the Engineer-in charge upto a distance of 30 M. from the foundation frenches. SOR 2022 SI.No. 251(a). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 2 | Cement Concrete with 4 cm gauge approved 8:4:1 stone Ballast, Coarse sand and cement the proportion of 4:2:1 including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SOR 2022 SI.No. 281. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 3 | M-150 Brick Work in 1:6 (One cement & six fine sand of 1.25 F.M.) mortar, materials labour, Tools & plants etc., required for proper completion of the work. SOR 2022 SI.No. 303. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 4 | E/W in filling in foundation in ordinary soil complete in all respect. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 5 | Sand filling in plinth and under floor including supply of necessary quantity of sand from a distance not exceeding 8 Kms. from the site of work and including watering, dressing etc. labour and T&P etc. required for proper complition of the work. saplings of girth upto 30 cms. measured at a height of 1 M. above ground level and removal of rubbish upto a distance of 50 M. out side the periphery of area cleared. including cost of sand. SOR 2022 SI.No. 255. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 6 | 12 mm thick plaster with 1:4 cement and corse sand of 1.25 fineness modules in ever brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. SOR 2022 SI.No. 584a. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 7 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:2:4 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. SOR 2022 SI.No. 283. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 8 | R.C.C. Work with cement, approved coarse sand & 2 cm gauge approved stone grit in proportions of 1:1.5:3 in lintels of door & windows excluding supply of reinforcement and its bending, but including its fixing and binding the same with 24 B.W.G.G.I. binding wire and including necessary centering and shuttering etc. and supply of all materials, labour, Tools & plants etc. required for proper completion of the work including cost of binding wire. The rate excludes making of drip course which shall be paid extra. SOR 2022 SI.No. 284a. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 9 | Providing and fixing 1mm thich M.S. Sheet door with frame of 40x40x6mm (1/2\\"x12\\"x4\\") angle iron 3.15 mm (1/8\\") thick M.S. gus set plate at the junction and corners including supply and fixing of necessary fittings. Lock rail of 15\\" length of oxidised iron and including pintels hooks at the top and applying priming coat of red lead paint on all sides complete. SOR 2022 SI.No. 517a. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 10 | M-150 Brick Work in 1:6 (One cement & six fine sand of 1.25 F.M.) mortar, materials labour, Tools & plants etc., required for proper completion of the work. SOR 2022 SI.No. 303+309+310. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 11 | Supplying, fitting and placing HYSD bar reinforcement in super-structure complete as per drawing and technical specifications. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 12 | M-150 class B/w in 1:4 wih cement and fine sand in superstrucure complete in all respect s per SI.No. 305+309+310. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 13 | Cast Cement concrete door sills, chaukhats, boundary posts shelves and similar small work with cement, approved coarse sand and 2 cm gauge stone grit in proportions of 1:2:4 excluding its fixing and binding the same with 24 B.W. G.G.I., binding wire, moulds, all materials labour, Tools & Plants etc. required for proper completion of the work. The rate excludes making of drip course which shall be paid extra. SOR 2022 SI.No. 282. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 14 | 12 mm thick plaster with 1:4 cemenl corse sand ever brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. SOR 2022 SI.No. 284a . Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 15 | 12 mm thick plaster with 1:6 cemenl fine sand ever brick work minimum thickness not to be less than 1cm. including supply of all materials, labour, tools & plants etc. required for proper completion of the work. SOR 2022 SI.No. 286. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 16 | Add for extra labour and materials for plaster over rough face of one brick wall as per SI.No. 596. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 17 | Supply and fixing 6 to 8 mm thick ivory or light shades vitrefied tiles 600x600 mm size in flooring and skirting with 1:3 approved cement and coarse sand morter finished with in its cement colour slurry, jointing and polished of approved quality complete, including supply of all materials, labour, tools and plants elc. required for proper completion of the work, as per direction of Engineer - in-charge. SOR 2022 SI.No. New Item 4. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 18 | 4 cm (1\\") thick 1:2:4 plain cement concrete floor with cement, approved coarse sand and 2 cm. (1\\") graded approved stone grit, laid in panels finished with 3 mm. (1/8\\") floating coat of neat cement of cement and marble dust in ratio 5:1 as specified over and including 8 cm (3\\") thick base concrete consisting of cement, fine sand of 1.25 firieness modulus and brick ballast cm. (1/2\\") gauge in the proportion of 1:4:8 and removing any overlapping mortar at the joints of the penals if any and giving them a uniform finish, including supply of all materials, labour, Tools & plants etc. required for proper completion of the work. SOR 2022 SI.No. 601+605. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 19 | S/F 110mm dia PVC Pipe SI.No. 730a. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 20 | Painting roofs or other iron work in lagre areas with one coat priming and one cost of approved paint ocmplete in all respect as per SI. No. 644+645. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 21 | Making drip coarse sand SI. No. 660. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 22 | Three coats of wll putty I/c supply of all materials as per SI No. 673. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 23 | one priming coat and one coat of dry distemper on new completed in al respect as per SI No. 649+650. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 24 | Finishing wall with one of WPC of approved quality on new work with tow coast to give an even shade for weather coast complete in all respect as per SI No. 660 new item. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 25 | Fixing of Door frame 10.23 (I). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 26 | Fixing of Door frame 10.13 (II). Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 27 | Providning and laying brick coba 12mm thick lalc wi.in M 150 brick bat coba 7.5 cm thick with gap of 15mm to each other compete etc in all respect as per SI No 11.16 new item. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. |
| 28 | Supply & fixing of sign board at site including letter writing, painting both side of board including supply of of all materials, labour, T&P etc required for proper completion of the work. Including supply of all Material, Labour, T&P etc also including VAT, labour cess, royalty, but excluding GST and all other applicable Taxes required for proper completion of work as per direction of Engineer-in-charge. Please Enable Macros to View BoQ information |