|
| 1 | MS pipeline up to 12\\" dia |
| 2 | a) Dismantling |
| 3 | b) Erection |
| 4 | c) Dismantling (under ground) |
| 5 | d) Erection (under ground) |
| 6 | MS Pipe line above 12\\" dia including vapour/exhaust pipe |
| 7 | a) Dismantling |
| 8 | b) Fabrication |
| 9 | c) Erection |
| 10 | Seamless pipeline up to 12\\" dia |
| 11 | a) Dismantling |
| 12 | c) Erection |
| 13 | Seamless bend upto 12\\" dia |
| 14 | a) Dismantling |
| 15 | c) Erection |
| 16 | Cross reducer, tee, nipple upto 12\\" dia |
| 17 | a) Dismantling |
| 18 | b) Fabrication |
| 19 | c) Erection |
| 20 | Cross reducer, tee, nipple above 12\\" dia |
| 21 | a) Dismantling |
| 22 | b) Fabrication |
| 23 | c) Erection |
| 24 | Valve upto 12\\" dia |
| 25 | a) Dismantling |
| 26 | c) Erection |
| 27 | A) Valve above 12\\" dia |
| 28 | a) Dismantling |
| 29 | b) Erection |
| 30 | Bend upto 12\\" dia |
| 31 | a) Dismantling |
| 32 | b) Fabrication |
| 33 | c) Erection |
| 34 | A) Bend above 12\\" dia |
| 35 | a) Dismantling |
| 36 | b) Fabrication |
| 37 | c) Erection |
| 38 | Flange of all size |
| 39 | a) Dismantling |
| 40 | b) Fabrication |
| 41 | c) Erection |
| 42 | Platform of any size (only plate) |
| 43 | a) Dismantling |
| 44 | b) Fabrication & Erection |
| 45 | Purlin |
| 46 | a) Dismantling |
| 47 | b) Fabrication |
| 48 | c) Erection |
| 49 | Mill House (Replacement of Runner MBC, RBC, Bagasses Elevator IRC, MIRC, Cane Carrier |
| 50 | a) Dismantling |
| 51 | b) Fitting of New |
| 52 | Replacement of angle/channel of MBC, RBC, Bagasses elevator IRC, MIRC, Cane Carrier |
| 53 | a) Dismantling |
| 54 | b) Fitting of New |
| 55 | Replacement side plate of MBC, RBC, Bagasses elevator IRC, MIRC, Cane Carrier |
| 56 | Dismantling, Fabrication & Erection of any bed of motor, Pump & gear box |
| 57 | a) Below 50 HP |
| 58 | c) Above 50 HP |
| 59 | Dismantling of ACC Sheet |
| 60 | Fitting of ACC Sheet |
| 61 | Repair of Godown rain gutters |
| 62 | New PVC water pipe line 8\\" from over head tank to colony |
| 63 | Fabrication, Erection of cane unloader roof shed with GI/Color coated sheet. (shed height approx. 15 Mtr) |
| 64 | Fabrication, Erection of Cane unloader structure both side increase length, cane unloader with sq. bar supporting bracket and coloumn, platform, railing leader element of bridge wheel with trail |
| 65 | Dismantling of old mill structure and shifting of New Plant |
| 66 | Dismantling & shifting transformer from old power house to new power house with electric work. |
| 67 | Dismantling & laying HT & LT cable with tray and termination Kit. |
| 68 | Installation of Incomer ACB Pannel connected with Bas Bar coupling with existing PCC panel |
| 69 | Erection of Boundry wall Barded wire including 2\\" pipe line column with paint & civil work |
| 70 | M.S pipe line dismantling from old plant and shifting and erection at new Plant including bend and flanges etc. |
| 71 | Molasses Tank (Repair of Old Molasses Tank Please Enable Macros to View BoQ information |