| 1 | GENERAL JOBS |
| 2 | Replacement of worn-out of M.S. Runner of PCC, SCC, ICC, Elevator, RBC and cross carrier chains |
| 3 | Replacement of worn-out of M.S. guide angle (daab) of PCC, SCC, ICC, Elevator, RBC and cross carrier chains. |
| 4 | Replacement of S.S. tubes of all juice heaters, vapour line juice heater and semi-Kestner. |
| 5 | do but of all pans |
| 6 | do but of all evaporators |
| 7 | Welding joints of water, juice, vapour and exhaust pipe lines of all sizes, any tank, pans, condenser, evaporator body etc. |
| 8 | Pipeline upto 12\\" dia |
| 9 | Dismantling |
| 10 | Erection |
| 11 | Pipeline upto 12\\" dia from MS Plate |
| 12 | Dismantling |
| 13 | Fabrication |
| 14 | Erection |
| 15 | Bends from readymade pipe line up to 12\\" dia |
| 16 | Dismantling |
| 17 | Fabrication |
| 18 | Erection |
| 19 | Bends from 12\\" dia from MS Plate |
| 20 | Dismantling |
| 21 | Fabrication |
| 22 | Erection |
| 23 | Tee, Nipples & Crosses upto 12\\" dia |
| 24 | Dismantling |
| 25 | Fabrication |
| 26 | Erection |
| 27 | Tee, Nipples & Crosses upto above 12\\" dia fromMS Plate |
| 28 | Dismantling |
| 29 | Fabrication |
| 30 | Erection |
| 31 | Reducers of all sizes |
| 32 | Dismantling |
| 33 | Fabrication |
| 34 | Erection |
| 35 | Flanges of all sizes |
| 36 | Dismantling |
| 37 | Fabrication |
| 38 | Erection |
| 39 | Valves of all sizes |
| 40 | Dismantling |
| 41 | Erection |
| 42 | Fabrication |
| 43 | Man Holes of all sizes |
| 44 | Dismantling |
| 45 | Fabrication |
| 46 | Erection |
| 47 | Platform: |
| 48 | Dismantling |
| 49 | Fabrication & Erection |
| 50 | M.S Structure work |
| 51 | Dismantling |
| 52 | Fabrication |
| 53 | Erection |
| 54 | M.S Tank complete having round, conical & rectangular bottoms |
| 55 | Dismantling |
| 56 | Fabrication |
| 57 | Erection |
| 58 | NRV of any type: |
| 59 | Dismantling |
| 60 | Fabrication |
| 61 | Erection |
| 62 | Platform Pipe Line railing of all sizes: |
| 63 | Dismantling |
| 64 | Erection |
| 65 | M.S. Patch work |
| 66 | Replacement of foundation bolts of any bed |
| 67 | Fabrication and Erection M.S. stair; |
| 68 | Monkey tower type |
| 69 | Step type |
| 70 | Straightening M.S plate |
| 71 | Strengthening of any structure with M.S Angle/Channel |
| 72 | S.S. to S.S. welding |
| 73 | Fabrication and erection of all type of pump + motor bed. |
| 74 | MILL HOUSE |
| 75 | Drilling and Tapping of Mill’s top roller of square end face having size 8-20M at 265 PCD and 50mm deep thread for fitting of Ropeless coupling. |
| 76 | Dismantling, fabrication & erection of mills juice tray |
| 77 | Fabrication of SCC and inter carrier chain’s rake. |
| 78 | Repair of Secondary Cane Carrier & inter Carrier Chain’s rake. |
| 79 | Fabrication of TRPF juice tray |
| 80 | Fabrication of TRPF top roller cover |
| 81 | Dismantling, fabrication and erection of Donnelly chute of mills |
| 82 | Fabrication and erection of mill roller crown pinion guard |
| 83 | Fabrication and erection of TRPF roller crown pinion guard |
| 84 | Complete repair of TRPF pressure chute, including replacement of worn out S.S. Plate |
| 85 | Fabrication of discharge roller scrapper assembly. |
| 86 | Replacement of worn out bottom boot of inter carrier chain. |
| 87 | Replacement of worn out structure of 1st Mill inter carrier chain trough. Job including complete alignment of ICC trough. |
| 88 | BOILER HOUSE |
| 89 | Replacement of Cast Iron Furnace chute of J.T. and Texmaco Boilers. |
| 90 | Fabrication of RBC slats made out from 3 mm thick plate for both RBC Chain |
| 91 | Fabrication of RBC slats made out from 4 mm thick Strip for both RBC Chain |
| 92 | Repair of RBC Slat |
| 93 | Replacement of M.S. Bagasse chute of J.T. and Texmaco Boilers. |
| 94 | Replacement of worn out furnace door of J.T. boilers without frame |
| 95 | do but with door frame |
| 96 | Fabrication of steam drum partition Plates of Boilers |
| 97 | Repair of steam drum partition Plates of Boilers |
| 98 | Boiler damper of any type |
| 99 | Dismantling |
| 100 | Fabrication |
| 101 | Erection |
| 102 | Repair |
| 103 | Replacement of Boiler Ducting/Casing |
| 104 | Modification of bagasse adjusting gate chain system of Texmeco boiler |
| 105 | Repair work of bagasse adjusting gates |
| 106 | Replacement of Air Heater Tube of Taxmaco and JT Boiler |
| 107 | BOILING HOUSE |
| 108 | Replacement of worn out various types of strainers that of lime pumps, un-sulphured, syrup pumps etc. |
| 109 | Complete replacement work of worn out save-all of any evaporator body in all respect. |
| 110 | Complete replacement work of worn out save-all of any evaporator body in all respect. |
| 111 | Complete replacement work of worn out save-all of any pan in all respect. |
| 112 | Replacement work of complete shell portion of any evaporator body beginning from Calenderia to taper portion including all connections. |
| 113 | Replacement work of complete shell portion of any Pan beginning from Calenderia to taper portion including all connections. |
| 114 | Replacement work of complete taper portion of Pan from body to save all |
| 115 | Replacement of worn out vapour pipe of various sizes of pans going to condenser |
| 116 | Replacement of worn out steam/general coil of Ordinary design : size - 1/2'' to 3'' |
| 117 | Replacement of worn out steam/general coil of Ordinary design : size - 4'' to 6'' |
| 118 | Replacement of worn out steam/general coil of Pure circular design: size - 1/2'' to 3'' |
| 119 | Replacement of worn out steam/general coil of Pure circular design: size - 4\\" to 6\\" |
| 120 | Dismantling, fabrication & erection of pans vapour pipe line bends |
| 121 | Replacement of gutters - Dismantling |
| 122 | Replacement of gutters - Fabrication |
| 123 | Replacement of gutters - Erection |
| 124 | Replacement of gutters - Repair |
| 125 | Replacement of worn out stirrer arms (Straight Type) |
| 126 | Replacement of worn out stirrer arms (Worm Type) |
| 127 | Replacement of worn out umbrella of pans |
| 128 | Repair of Umbrella |
| 129 | Replacement of all pipe line of sulphur furnace cooler, complete in all respect. |
| 130 | Replacement of worn out portion of sulphur furnace cooler inside pipeline. |
| 131 | Replacement of juice and syrup Sulphur furnace Shell portion made out from 16 mm thick plate |
| 132 | Replacement of melter outlet neck portion |
| 133 | Complete replacement of worn-out after burner of Sulphur furnace i.e including the replacement of internal pipe line also |
| 134 | Dismantling, Fabrication and erection of sulphur burner melter for sulphur furnaces. |
| 135 | Replacement of worn-out Bagacilo pipe line made out from G.I. plain sheet of standard size |
| 136 | Replacement of vacuum filter agitator |
| 137 | Fitting/erection of planetary gear box along with dismantling of existing gear system. |
| 138 | 40 Ton |
| 139 | 1 Ton |
| 140 | Replacement of worn out partition plates of headers of juice heaters, complete in all respect. |
| 141 | Replacement of S.S pipeline of any size: |
| 142 | Dismantling |
| 143 | Fabrication |
| 144 | Erection |
| 145 | Replacement of juice heater headers bottom and top of juice heater no. 4 with tube plate (without tube). Job including all collections. |
| 146 | Cutting and polishing both hands of juice heater's tubes as per the requirement. |
| 147 | CENTRIFUGAL STATION |
| 148 | Replacement of Hopper trough |
| 149 | Replacement of complete portion of hopper tray |
| 150 | Replacement of molasses chute of Continuous Centrifugal machine. |
| 151 | Replacement of molasses chute of Batch type Centrifugal machine |
| 152 | Replacement of any worn out shell portion of pug mills/magma mixers |
| 153 | POWER HOUSE/ETP & COOLING TOWER |
| 154 | Fabrication & erection of cable tray |
| 155 | Repair of Cooling Tower of A to Z Plant.This job also include acivil repair work and structure strengthening |
| 156 | Repair of ETP Plant aeration chamber circulation aerationThis work also include tyre arrangement Please Enable Macros to View BoQ information |