| 1 | Dismantalling and removing RCC Column beams slabs etc complete |
| 2 | Dismantalling Brick or Stone Masonry in Ceement Morta or lime mortar incl all cost |
| 3 | Conveyance Charges of dismantle material within 5km lead by mechanical means incl all cost |
| 4 | Labour engaged for cleaning the septik tank incl all cost |
| 5 | Earth Work in Hard soil within 50met. Initial lead and 1.5met. Initial lift including rough dressing and levelling the bed including all labour T&P etc. complete as directed by the Engineer - in Charge. |
| 6 | Filling in foundation and plinth with sand well watered,rammed etc including all cost conveyance roalty ,labour and T&P etc. complete as directed by the Engineer - in Charge. |
| 7 | Cement concrete (1:4:8) using: 4cm size hard granite hand broken metal with all cost conveyance,royalty,taxes etc all complete. |
| 8 | R.C.C. Work with M-20 using 20 mm & down grade HGCB Stone chips incluiding hoisting, laying,curing etc. complete but excluiding cost of steel reinforcement. |
| 9 | Supplying , fitting , fixing & placing uncoating bar reinforcement complete as per drawing & technical specification complete. |
| 10 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. |
| 11 | Supplying all labour T&P material for Rigid & smooth Shuttering for Column/Beam in superstructure |
| 12 | Supplying all labour T&P material for Rigid & smooth Shuttering for Lintel Beam incl all cost |
| 13 | Supplying all labour T&P material for Rigid & smooth Shuttering for Roof Slab incl all cost |
| 14 | Supplying all labour T&P material for 1st ClassFly Ash Bricks in CM (1:6) in foundation and plinth |
| 15 | Supplying all labour T&P material for 1st ClassFly Ash Bricks in CM (1:6) in superstructure |
| 16 | 2.5cm DPC incl all cost |
| 17 | Supplying all labour T&P material for 1st ClassFly Ash Bricks in CM (1:6) in superstructure |
| 18 | 12mm thk Cement Plaster in CM (1:4) incl all cost |
| 19 | 12mm thk Cement Plaster in CM (1:6) incl all cost |
| 20 | 16mm thk Cement Plaster in CM (1:6) incl all cost |
| 21 | 6mm thk Cement Plaster in CM(1:4) to RCC Surface incl all cost |
| 22 | 2.5cm thk grading concrete incl all cost |
| 23 | Supplying & fixing of M.S. Grill for Door and window incl all cost |
| 24 | Providing and fixing of GI sheet Door incl all cost |
| 25 | Fixing tiles in floors treads or steps and landing on 25mm thick bed of cement mortar 1:1 (1cement : 1sand) jointed with neat cement slury mixed with pigment tiles including cost of tiles |
| 26 | Fixing tiles in dados skirting and risers of steps on 12mm thick cement plaster (1:3) jointed with neat cement slurry mixed with pigments to match the shade of the tiles including cost of tiles. |
| 27 | PCC M20 using 20mm and down graded hgcb chips incl all cost |
| 28 | Priming 1 coat over plastered surface incl all cost |
| 29 | Painting two coat Emulsion paint over 1plastered surface with any approved shade incl all cost |
| 30 | Painting two coat Synthetic enamel paint over gI door with any approved shade incl all cost |
| 31 | Provision for Electrification incl all cost |
| 32 | Provision for PH fittings incl all cost |
| 33 | Provision for Display board and photography Please Enable Macros to View BoQ information |