| 1 | BHARAT SANCHAR NIGAM LIMITED (A Govt. of India Enterprise) O/o Executive Engineer (C ) BSNL Civil Division-Kolkata NIT No:- 02/WB/CD-KOL/BSNL/NIT/26-27 Dated: 06.06.2026 FINANCIAL BID Name of work : Construction of 03 Nos. 9 M self supporting Pole Tower on roof of LCSS 5A Bldg. & dismantling & re-installation of dismantled RTP on roof of Instrumentation Bldg. in IISCO premises at Burnpur under Asansol OA. Name Of Bidder Sl. No Description of Items Qty Unit Rate Amount |
| 2 | Brick work with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level in all shapes and sizes in : (a) Cement mortar 1:6 (1 cement : 6 coarse sand) 2.0 Cum 0.0 |
| 3 | Half brick masonry with common burnt clay F.P.S. (non modular) bricks of class designation 7.5 in superstructure above plinth level up to floor V level. (a) Cement mortar 1:4 (1 cement :4 coarse sand) 13.0 Sqm 0.0 |
| 4 | Extra for providing and placing in position 2 Nos 6mm dia. M.S. bars at every third course of half brick masonry. |
| 5 | Steel work in built up tubular (round, square or rectangular hollow tubes etc.) trusses etc., including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shaped washers etc. complete. (a) Hot finished welded type tubes. 82.0 One Kg 0.0 |
| 6 | Welding by gas or electric plant including transportation of plant at site etc. complete. |
| 7 | Steel work welded in built up sections/ framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer using structural steel etc. as required. (a) In gratings, frames, guard bar, ladder, railings, brackets, gates and similar works. 97.0 One Kg 0.0 |
| 8 | Providing and fixing plain multipurpose cement board(Hight pressure steam cured) with suitable screws for cement particle board in ceiling etc. complete (frame work to be paid seperatately). (a) 6 mm thick Cement bonded wood particle board as per IS:14276 6.0 Sqm 0.0 |
| 9 | Providing and fixing precoated galvanised iron profile sheets (size, shape and pitch of corrugation as approved by Engineer-in-Charge) of total coated thickness 0.50 mm (base metal of minimum 0.45 mm thickness with total coating thickness of 0.05mm) with zinc coating 120 grams per sqm as per IS: 277, in 240 mpa steel grade, 5-7 microns epoxy primer on both side of the sheet and polyester top coat 15-18 microns. Sheet should have protective guard film of 25 microns minimum to avoid scratches during transportation and should be supplied in single length upto 12 metre or as desired by Engineer-in-charge. The sheet shall be fixed using self drilling /seIf tapping screws of size (5.5x 55 mm) with EPDM seal, complete upto any pitch in horizontal/ vertical or curved surfaces, excluding the cost of purlins, rafters and trusses and including cutting to size and shape wherever required. |
| 10 | 12 mm cement plaster of mix : (a) 1:4 (1 cement: 4 fine sand) 55.0 Sqm 0.0 |
| 11 | Neat cement punning |
| 12 | White washing with lime to give an even shade: (a) New work (three or more coats) 57.0 Sqm 0.0 |
| 13 | Structural steel work riveted, bolted or welded in built up sections, trusses and framed work, including cutting, hoisting, fixing in position and applying a priming coat of approved steel primer all complete. |
| 14 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level : a) 1:2:4 (1 cement : 2 coarse sand(zone-III) derived from natural sources : 4 graded stone aggregate 20 mm nominal size derived from natural sources) 4.0 Cum 0.0 |
| 15 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III)derived from natural sources : 3 graded stone aggregate 20 mm nominal sizederived from natural sources). |
| 16 | Centering and shuttering including strutting, propping etc. and removal of form for : (a) Foundations, footings, bases of columns, etc. for mass concrete 22.0 Sqm 0.0 |
| 17 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete upto plinth level. (a) Thermo-Mechanically Treated bars of grade Fe-500D or more. 60.0 Kg 0.0 |
| 18 | 6 mm cement plaster of mix : a) 1:3 (1 cement: 3 fine sand) 30.0 Sqm 0.0 |
| 19 | Painting with synthetic enamel paint of approved brand and manufacture to give an even shade : (a) Two or more coats on new work. 60.0 Sqm 0.0 |
| 20 | Fabrication and providing structural steel work welded in built-up section for self supporting pole and platform with galvanizing mild steel R.S. Joist, channels, bolts, angles, connecting plates, tubes, nuts, washers etc. all complete as per direction of Engineer-In-Charge. The rate shall include cost of all materials, labours, tools, plants, machineries and carrying the materials to site i/c loading, unloading etc. for all leads, taxes, duties and ancillary works in handling of the pole materials. |
| 21 | Labour for hoisting, fixing and erection of poles on roof top as per structural drawing and design all complete as per direction of the Engineer-In-Charge. |
| 22 | Lifting of new galvanized iron pole materials and other necessary tools and plants upto height of 20 Mtrs. through narrow passage,busy traffic etc. by head loads or by any other means as directed by the Engineer-In-Charge. |
| 23 | Dismantling carefully 3-legged Pole tower (upto 09 Mtr height) manually including dismembering MS hot dipped galvanised Structural sections of the Tower & Prefabricated Shelter viz. angles, flats, Channels, gusset plate, bolts, nuts, ladder, working platform, antenna fixtures Lightning Arrestor, Prefabricated Sheets etc., lowering from roof level to Grd level and stacking within 50 Mtr lead including providing sufficient safety measures etc. complete as directed by the Engineer - in Charge. ( The rate includes the cost of insurance charges of all labours involved in the operation including hire charges and mobilisation charges of tools and plants etc. complete and nothing extra shall be paid on any account.) |
| 24 | Transportation of 3-legged Pole tower materials by mechanical transportation from the Existing site at T.E. Bldg. to the new Instrumentation Bldg, IISCO, Burnpur including loading, unloading, seggregating, Uplifting to Roof level of new Instrumentation Building, IISCO, Burnpur and stacking as per direction of Engineer-in-charge. Total 0.0 |