| 1 | Dismantling of MS/GI./CI Pipe Line upto 12” dia |
| 2 | Erection of M.S../G.I./CI Pipe Line upto 12” dia |
| 3 | Fabrication of Bend, Tee, Nipple, reducer from M.S pipe upto 12”dia |
| 4 | Fabrication of Bend, Tee, Nipple, reducer from M.S plate upto 12”dia |
| 5 | Dismantling of MS Pipe Line above 12” dia |
| 6 | Erection of MS Pipe Line above 12” dia |
| 7 | Fabrication of MS Pipe Line (vapour and exhaust steam and others) from MS plate above 12” dia |
| 8 | Fabrication of Bend, Tee, Nipple, reducer and cone from M.S plate above 12” dia |
| 9 | Dismantling of S.S. Pipe Line upto 12” dia |
| 10 | Erection of S.S. Pipe Line upto 12” dia |
| 11 | Fabrication of Bend, Tee, Nipple, reducer from SS pipe upto 12”dia |
| 12 | Dismantling of S.S. Pipe Line above 12”dia |
| 13 | Erection of S.S. Pipe Line above12”dia |
| 14 | Fabrication of Pipe Line from SS plate above 12” dia |
| 15 | Fabrication of Bend, Tee, Nipple, reducer from SS plate above 12”dia |
| 16 | Dismantling of M.S. Blinds all sizes. |
| 17 | Erection of M.S. Blinds all sizes. |
| 18 | Dismantling of Valves/Cocks upto 12”. |
| 19 | Erection of Valves/Cocks of upto 12 “. |
| 20 | Welding Joint |
| 21 | Dismantling and Erection of M.S. plate of Platform |
| 22 | Dismantling and Erection including its structure of M.S. plate Platform |
| 23 | Making new MS Platform |
| 24 | M.S. Patch work upto 12 mm thick plate |
| 25 | Dismantling of M.S. Structure |
| 26 | Fabrication and Erection of M.S. Structure |
| 27 | Fabrication and Erection of SS flange |
| 28 | Fabrication of M.S. Bed Frame for Motor & Pump up to 90 H.P including pump& motor dismantle & erection. |
| 29 | Fabrication of Grit/ Catcher for pump. |
| 30 | Fabrication of M.S. Bed Frame for Motor & Pump 100 to 200 H.P including pump & motor dismantle & erection. |
| 31 | Dismantling, Fabrication & Erection of Man Hole |
| 32 | Dismantling, Fabrication & erection of wornout round/rectangular/square bottom MS tanks |
| 33 | Dismantling, Fabrication & erection of wornout conical bottom tanks |
| 34 | Replacement of wornout bottom of round/rectangular /square bottom tanks |
| 35 | Replacement of wornout bottom of conical bottom tanks |
| 36 | Stratification of old M.S. plate to be use. |
| 37 | Fabrication of flange. |
| 38 | Dismantling, fabrication and erection of all type of chutes |
| 39 | Dismantling and erection of bagacillo air blower. |
| 40 | Dismantling, fabrication and erection of M.S. bagacillo receiving jacket of bagasse elevator. |
| 41 | Dismantling, Fabrication & erection of Hood of Chopper/ Leveller Fibrizer. |
| 42 | Complete alignment of cane unloader bridge (both sides). 50% payment will be released after completion of job. 50% payment will be released after close of crushing season. |
| 43 | Fabrication of Inter & Secondary Carrier Racks. |
| 44 | Dismantling, Fabrication & Erection of runner box of RBC, cross carrier & bagasse elevator. |
| 45 | Dismantling, Fabrication & Erection of radius portion of bagasse elevator chain/ RBC chain complete |
| 46 | Replacement of wornout inter carrier Trough with runner. |
| 47 | Dismantling and erection of Rail line of cane unloader. |
| 48 | Dismantling and Erection of MS Flat/T. Iron/Runners of Carriers. |
| 49 | Dismantling, Fabrication & Erection of MS Gutters Round or Square. |
| 50 | Dismantling, Erection of cold air blower with Connection |
| 51 | Dismantling and fitting of S.S./Brass Tubes & Hydraulically tested of Pan, Quad, Juice Heater & semi Kestner. During off season |
| 52 | Dismantling and fitting of S.S./Brass Tubes & Hydraulically tested of Pan, Quad, Juice Heater & semi Kestner. During season. |
| 53 | Dismantling, Fabrication & Erection of Tube plate with calandria of evaporators in all respect. |
| 54 | Replacement of save-all of quad bodies, S.K. and Pans, |
| 55 | Dismantling & Fitting of big vapour / exhaust valve after fitting of rubber seat |
| 56 | Replacement of outer body save-all of quad bodies, S.K. and Pans, |
| 57 | Fitting of sight Glass Frame complete in all respect. |
| 58 | Plugging of Brass tubes/S.S. Tubes of Pans/Quad/Juice Heater & semi Kestner during season/season. |
| 59 | Dismantling, Fabrication & Erection of Condensate Bottles. |
| 60 | Dismantling, Fabrication & erection of mud/clear juice chamber of dorr clarifier. From MS Plate |
| 61 | Dismantling, fabrication and erection of flash tank of dorr clarifier. |
| 62 | Dismantling, Fabrication & Erection of bottom of Dorr clarifier compartment. |
| 63 | Fabrication & Erection of juice coils of dorr. |
| 64 | To set right the scrappers of dorr compartment. |
| 65 | Replacement of inner body of save-all of quad bodies, S.K. and Pans, |
| 66 | Dismantling, Fabrication & Erection of wornout cone of quad body/pan to all aspects. |
| 67 | Dismantling, Fabrication & Erection of shell of quad body/pan including vapour & exhaust connection , all accessories in all respect |
| 68 | Replacement of wornout steam/water coil of sugar melter/syrup and molasses tank at pan station and juice clarifier. |
| 69 | Dismantling, Fabrication & Erection of Juice Umbrella Catchall of Pans/Quad Bodies/ V.Cell. |
| 70 | Dismantling, Fabrication & Erection of worn out Pan body shell Pan in all respect and its water, Vacuum trial. |
| 71 | Dismantling, Fabrication & Erection of wornout Top cone of Pan, Quad ,juice sulphiter, syrup sulphiter in all respect and its water/Vac. trail. if applicable |
| 72 | Replacement of Calanedria shell of Pan including vapour, exhaust and other connection in all respect. |
| 73 | Replacement of Tube plates of Pan. |
| 74 | Fabrication and erection of rubber seated valve for cut over lines of Pans. |
| 75 | Dismantling, fabrication & erection of discharge valve of Pan /evaporators /SK |
| 76 | Dismantling, Fabrication & Erection of pan Calanderia down take. |
| 77 | Replacement of wornout Baffle Plate of each saves all of Pan/Quad. |
| 78 | Dismantling, Fabrication & Erection of Feeding Header of Pans. |
| 79 | Repair/modification of pan/evaporator/juice heater, valves for vapour/exhaust. |
| 80 | Repair of worn out M.S. Strips of Juice Heater Bottom cover for holding rubber strips. |
| 81 | Repair of worn out M.S. Strips of Juice Heater Top cover for holding rubber strips. |
| 82 | Replacement of partition plates of header of juice heater Top/Bottom |
| 83 | Dismantling, Fabrication & Erection of juice box of double-beat valve. |
| 84 | Dismantling, Fabrication & Erection of Nipples of juice heaters (Between juice heater body & double-beat valve) |
| 85 | Repair of juice heater covers (By fixing 12 mm plate on its face). |
| 86 | Replacement of existing shell of burners of So2 furnaces alongwith air connection |
| 87 | Dismantling, Fabrication & Erection of primary cooler of Satwik Make SO2 furnace. |
| 88 | Fabrication and erection of S.S. discharge valve for melter and receiver of each sulphur furnace. |
| 89 | Dismantling, Fabrication & Erection of secondary cooler of Satwik Make SO2 furnace. |
| 90 | Dismantling, Fabrication & Erection of Water Jacket of sulphur furnace |
| 91 | Dismantling, Fabrication & erection of juice sulphitor Spurzer Box. |
| 92 | Dismantling of air compressor along with its motor. |
| 93 | Erection of air compressor along with its motor complete in all respect. |
| 94 | Dismantling, Fabrication & erection recovery tower of juice sulphiter/ syrup sulphiter. |
| 95 | Fabrication & erection of juice weighing Scale seat |
| 96 | Dismantling, Fabrication & Erection of Agitator of RVF. |
| 97 | Dismantling, Fabrication & Erection of bagacillo cyclone of RVF. |
| 98 | Dismantling, Fabrication & Erection of damaged body of Mud Mixer. |
| 99 | Dismantling, Fabrication & Erection of M.S. tank at filtrate pit. |
| 100 | Dismantling, Fabrication & Erection of Centre shaft of Horizontal Crystallizer. |
| 101 | Dismantling, Fabrication & Erection of damaged Arm of Vacuum Crystallizers. |
| 102 | Replacement of wornout bottom half portion of crystallizer. |
| 103 | Dismantling and erection of steam pipe line. |
| 104 | Dismantling, fabrication and erection of steam coil at molasses tank. |
| 105 | Dismantling, fabrication and erection of water coil of sulphur furnace. |
| 106 | Welding of S.S./M.S. pipe line. |
| 107 | Strengthening of vapour pipe of Pan. |
| 108 | Dismantling and fitting of wornout gland boxes and fitting of new gland boxes of vacuum crystallizer and replacement of wonout G.M. bushes. |
| 109 | Modification of Sugar Elevator (bottom approx. 1.5 mtr) |
| 110 | Dismantling & fitting of wornout gland boxes and fitting of new gland boxes of magma mixture, pug mill and replacement of wonout G.M. bushes |
| 111 | Modification and alignment of belt type sugar elevator. |
| 112 | Modification of hopper No. 3 to run on both sugar elevator to existing grader. |
| 113 | Strengthening of nozzle box of condenser . |
| 114 | Dismantling, fabrication and erection of ring of down take of Pan. |
| 115 | Dismantling of worm wheel and erection of planetary gear. |
| 116 | Dismantling and erection of cone of pan |
| 117 | Dismantling, Fabrication & Erection of arm Air Cooled of Vacuum Crystallizers. |
| 118 | Dismantling, Fabrication & Erection of ribbon type stirrer of Vacuum Crystallizers. |
| 119 | Dismantling, Fabrication & erection of damaged stirrer of Pug Mill. |
| 120 | Dismantling, Fabrication & erection of damaged arms of magma Mixer |
| 121 | Dismantling, Fabrication & erection of damaged Arm of Magma mixture & pug mills. |
| 122 | Replacement of sugar Hopper Multi Trays. |
| 123 | Dismantling, Fabrication & erection of sugar hopper |
| 124 | Dismantling, Fabrication & erection of Multi Trays sugar hopper |
| 125 | Dismantling, Fabrication & Fitting of S.S. Ring for continuous cfg. machine |
| 126 | Replacement of wornout plates of sugar hopper. |
| 127 | Dismantling, Fabrication & Erection driving portion of hopper |
| 128 | Dismantling of shell plate of molasses storage tanks. |
| 129 | Fabrication & Erection of shell plate of molasses storage tanks. |
| 130 | Repair work of wornout roof of molasses storage tanks by carpeting 5 mm plate on entire roof. |
| 131 | Fabrication & Erection of Shed for electric motors, panel boards and any other machinery parts. |
| 132 | Dismantling, Fabrication & erection of resistance box body |
| 133 | Fabrication of blade for resistance box for slipring motor. |
| 134 | Strengthening and replacement of staging column/cross beam. |
| 135 | Dismantling, Fabrication & erection of molasses/juice gutter size- 4 ft.width, 2ft. height approx. |
| 136 | Dismantling, Fabrication & erection of mud/clear juice boxes of dorr clarifier. From MS Plate |
| 137 | Dismantling and fitting of juice heater cover. |
| 138 | Dismantling, fabrication and erection of top cover of syrup sulphiter. |
| 139 | Dismantling, fabrication and erection of partition plate of mud receiving tank and condensate bottle of quad body. Please Enable Macros to View BoQ information |