Costruction of Cross Section Sleeper ( C.C 1:2:4 ) Every 3.00 Mtr. Length For CC Lining Workg as per drawing and design provided by the department with mixing of concrete , after laying watering to provide strength for holding and retaining the concrete layer including of all material, labour and T&P required for proper completion of work as per direction of Engineering-in-Charge at Umarahat Pump Canal, Phase 1, Sikandra, Kanpur Dehat. Please Enable Macros to View BoQ information
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.