|
| 1 | Dismantling of VRLA/ Li-ion battery sets including disconnecting power cables along with all accessories | Dismantling of VRLA/ Li-ion battery sets including disconnecting power cables along with all accessories |
| 2 | Battery capacity up to 400AH | Battery capacity up to 400AH |
| 3 | Battery capacity 600AH | Battery capacity 600AH |
| 4 | Battery capacity 1000AH | Battery capacity 1000AH |
| 5 | Battery capacity 1500AH | Battery capacity 1500AH |
| 6 | Battery capacity 2000AH | Battery capacity 2000AH |
| 7 | Battery capacity 3000AH | Battery capacity 3000AH |
| 8 | Transportation of the Battery set to another BSNL site (including loading & unloading) | Transportation of the Battery set to another BSNL site (including loading & unloading) |
| 9 | Battery capacity up to VRLA 400AH or Li-ion 600 AH-within 20km distance | Battery capacity up to VRLA 400AH or Li-ion 600 AH-within 20km distance |
| 10 | Battery capacity VRLA 600 AH or Li-ion above 600 AH-within 20km distance | Battery capacity VRLA 600 AH or Li-ion above 600 AH-within 20km distance |
| 11 | Battery capacity up to 600 AH VRLA or Li-ion of any capacity- for each additional one kilometer (beyond 20 km) | Battery capacity up to 600 AH VRLA or Li-ion of any capacity- for each additional one kilometer (beyond 20 km) |
| 12 | Installation of theVRLA/ Li-ion Battery set, Connecting HRC fuses Testing and Commissioning of the above battery set on artificial load as required | Installation of theVRLA/ Li-ion Battery set, Connecting HRC fuses Testing and Commissioning of the above battery set on artificial load as required |
| 13 | Battery capacity up to VRLA 400AH or Li-ion 600AH | Battery capacity up to VRLA 400AH or Li-ion 600AH |
| 14 | Battery capacity VRLA 600AH or Li-ion above 600 AH | Battery capacity VRLA 600AH or Li-ion above 600 AH |
| 15 | Battery capacity VRLA 1000AH | Battery capacity VRLA 1000AH |
| 16 | Battery capacity VRLA 1500AH | Battery capacity VRLA 1500AH |
| 17 | Battery capacity VRLA 2000AH | Battery capacity VRLA 2000AH |
| 18 | Battery capacity VRLA 3000AH | Battery capacity VRLA 3000AH |
| 19 | Additional charges to up / down the Battery set to per floor at site. | Additional charges to up / down the Battery set to per floor at site. |
| 20 | Battery capacity up to VRLA 400AH or Li- ion 600AH | Battery capacity up to VRLA 400AH or Li- ion 600AH |
| 21 | Battery capacity 600 AH VRLA | Battery capacity 600 AH VRLA |
| 22 | Li-ion Battery capacity above 600AH | Li-ion Battery capacity above 600AH |
| 23 | Battery capacity 1000AH VRLA | Battery capacity 1000AH VRLA |
| 24 | Dismantling of SMPS including disconnecting both I/P and O/P Power cables along with all accessories | Dismantling of SMPS including disconnecting both I/P and O/P Power cables along with all accessories |
| 25 | SMPS capacity up to 450A | SMPS capacity up to 450A |
| 26 | SMPS capacity above 450A | SMPS capacity above 450A |
| 27 | Transportation of the SMPS to another BSNL site, Loading of the same SMPS to a suitable vehicle and unloading as per the requirement | Transportation of the SMPS to another BSNL site, Loading of the same SMPS to a suitable vehicle and unloading as per the requirement |
| 28 | SMPS capacity upto 450A-within 20 km distance | SMPS capacity upto 450A-within 20 km distance |
| 29 | SMPS capacity above 450 A-within 20 km distance | SMPS capacity above 450 A-within 20 km distance |
| 30 | SMPS capacity up to 450 A- for each additional one kilometer(beyond 20 km) | SMPS capacity up to 450 A- for each additional one kilometer(beyond 20 km) |
| 31 | SMPS capacity above 450 A- for each additional one kilometer(beyond 20 km) | SMPS capacity above 450 A- for each additional one kilometer(beyond 20 km) |
| 32 | Installation of the SMPS, Laying I/P cables from L/T panel to SMPS, installation of Surge protection device including ELCB with MOV, Connecting Battery and DCDP cables, PE &Positive earth cables. Socket crimping on i/p, o/p & earth cables, Testing, Acceptance testing (A/T) and Commissioning of the above SMPS on available exchange load as required. | Installation of the SMPS, Laying I/P cables from L/T panel to SMPS, installation of Surge protection device including ELCB with MOV, Connecting Battery and DCDP cables, PE &Positive earth cables. Socket crimping on i/p, o/p & earth cables, Testing, Acceptance testing (A/T) and Commissioning of the above SMPS on available exchange load as required. |
| 33 | SMPS PP Capacity up to 450 A | SMPS PP Capacity up to 450 A |
| 34 | SMPS capacity above 450A | SMPS capacity above 450A |
| 35 | Additional charges to up / down the Power plant to per floor at site. | Additional charges to up / down the Power plant to per floor at site. |
| 36 | SMPS PP Capacity up to 450 A | SMPS PP Capacity up to 450 A |
| 37 | SMPS capacity above 450A | SMPS capacity above 450A |
| 38 | Installation of Runway | Installation of Runway |
| 39 | Installation of Runway (without material) per meter. Runway material will be supplied by bsnl. | Installation of Runway (without material) per meter. Runway material will be supplied by bsnl. |