INTEGRATED WTCC FOR LHB GS & SCN AMRIT BHARAT COACHES , as per Drawing: LG1 0486 ALT. 'e', Packing Instruction: 1. THE SUPPLIER SHALL PACK THE INTEGRATED WTCC IN A SUITABL Y DESIGNED RETURNABLE FIXTURE IN SUCH A WAY THAT INTEGRATED WTCC SHALL NOT GET SCRATC HED, DAMAGED, TWISTED DURING TRANSPORTATION, STORAGE AND LIFTING AND TO AVOID SCRATC HES ON OUTER SURFACE. IT SHOULD BE WRAPPED WITH ENVIROMENT FRIENDLY MATERIAL AND IT SH OULD HAVE STANDARD CLAMPING /FASTENING MECHANISM SO THAT IT CAN BE OPENED EASILY. IT S HOULD HAVE FIRM'S IDENTIFICATION MARK. 2. FIRST RETURANABLE FIXTURE ALONG WITH INTEGRATE D WTCC BE RETAINED BY RCF & THIS FIXTURE SHALL BE EXCHANGED IN THE SECOND LOT SUPPLY AN D SO ON. AT THE END OF THE CONTACT, THE FIRM SHALL COLLECT THE REMAINING RETURNABLE PA CKING FIXTURE FROM RCF. 3. THE PACKING FIXTURE/FRAME TO BE FABRICATED HAVING SUFFICIENT STRENGHT TO BEAR APPROXIMATE 1 TONNE LOAD IN STATIC & MOVING CONDITION OF TWO COACH SET OF INTEGRATED WTCC. 4. THE FIXTURE /FRAME/PALLET SHOULD BE DESIGNED SO THAT THE PAC KED WTCC REMAIN PREFERABLY IN HORIZONTAL POSITION TO MINIMIZE SURFACE AREA. 5. IT SHOUL D ALSO BE SUITABLE FOR STORAGE OF INTEGRATED WTCC UNDER OPEN SKY. [ Warranty Period: 3 0 Months after the date of delivery ] ]
2
INTEGRATED WTCC FOR LHB SLRD AMRIT BHARAT COACHES , as per Drawing: MP24WT CCLSLRDAB VERSION 8, Packing Instruction: 1. THE SUPPLIER SHALL PACK THE INTEGRATED WTCC IN A SUITABLY DESIGNED RETURNABLE FIXTURE IN SUCH A WAY THAT INTEGRATED WTCC SHALL NOT G ET SCRATCHED, DAMAGED, TWISTED DURING TRANSPORTATION, STORAGE AND LIFTING AND TO AVO ID SCRATCHES ON OUTER SURFACE. IT SHOULD BE WRAPPED WITH ENVIROMENT FRIENDLY MATERIAL AND IT SHOULD HAVE STANDARD CLAMPING /FASTENING MECHANISM SO THAT IT CAN BE OPENED EA SILY. IT SHOULD HAVE FIRM'S IDENTIFICATION MARK. 2. FIRST RETURANABLE FIXTURE ALONG WITH IN TEGRATED WTCC BE RETAINED BY RCF & THIS FIXTURE SHALL BE EXCHANGED IN THE SECOND LOT S UPPLY AND SO ON. AT THE END OF THE CONTACT, THE FIRM SHALL COLLECT THE REMAINING RETURNABLE PACKING FIXTURE FROM RCF. 3. THE PACKING FIXTURE/FRAME TO BE FABRICATED HAVI NG SUFFICIENT STRENGHT TO BEAR APPROXIMATE 1 TONNE LOAD IN STATIC & MOVING CONDITION O F TWO COACH SET OF INTEGRATED WTCC. 4. THE FIXTURE /FRAME/PALLET SHOULD BE DESIGNED SO THAT THE PACKED WTCC REMAIN PREFERABLY IN HORIZONTAL POSITION TO MINIMIZE SURFACE ARE A. 5. IT SHOULD ALSO BE SUITABLE FOR STORAGE OF INTEGRATED WTCC UNDER OPEN SKY. [ Warra nty Period: 30 Months after the date of delivery ] ]
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.