| 1 | PARTICULAR |
| 2 | Cleaning/removal of debris/stone from galleries and stacking within 50 m distance For Drive head - 8(10.00 * 4.20 * 0.4 = 134.40 M3) Cleaning of Gallery for Installation of Belt Conveyor - 4540X4.00X0.10 = 1816.00 M3 Grand Total - 1816.00+134.40 = 1950.40 m3 |
| 3 | Groove cutting in solid coal/stone for foundation, manhole/duggi hole/pits and excavated material to be removed and stacked separately within 50m.distance. Cutting in soft stone by chisel & hammer = 48.00 m3Drive head 8(2nos.*4.00*0.50*1.0 = 32.00 m3Discharge 8(4nos.*0.50*0.50*1.0 = 8.00 m3Looptakeup 8(4nos.*0.50*0.50*1.0 = 8.00 m3 |
| 4 | Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m. (S/F) CEMENT |
| 5 | STONE |
| 6 | Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 1.0 Km or part there of and bringing the empty tubs to surface. CEMENT |
| 7 | STONE CHIPS |
| 8 | Unloading of all kind of building materials from tubs at destination in u/g and stacking the same. CEMENT |
| 9 | STONE CHIPS |
| 10 | Lead for transportation/carriage of all kinds building materials by manually in u/g. Upto 75.00 m . Sand - 21.36m3, Cement -10.68 m3, stone chips- 42.72 m3 = 74.76 m3 |
| 11 | Pushing of tub for every 30m after free pushing of first 30.00m Upto 810 m. (810m-30m=780m/30m=26 no.) Rate ( 26*6.02= Rs.156.52/m3) Sand - 21.36m3, Cement -10.68 m3, stone chips- 42.72 m3 = 74.76 m3 |
| 12 | Dismantling and transporting of 1000mm drive head (Double drive drum) with loop take up and all accessories (like as motor, gearbox, drive drum, girders, frame, chute & side plates etc) with lead of 100m/ up to track end. |
| 13 | Installation of 1000 mm drive head (double drive drum) with all accessories with loop take-up (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. in-charge |
| 14 | Cement concrete/PCC (1:2:4) in foundation/plinth /flooring/wall (any thickness) in u/g (Excluding centring, shuttering and cost of CC materials)Drive head 8(2nos.*4.00*0.50*1.0 = 32.00 m3Discharge 8(4nos.*0.50*0.50*1.0 =8.00 m3Looptakeup 8(4nos.*0.50*0.50*1.0 =8.00 m3 |
| 15 | Dismantling of belt structure along with PVC belt (800mm/1000mm) including cleaning stacking the same within a distance of 50m |
| 16 | Transportation of steel structures materials from surface to u/g through haulages with tramming &pushing coupling/ uncoupling etc OR Transportation of all dismantled steel structures materials in u/g from one section to other section |
| 17 | Installation/erection of complete belt conveyor structure(1000mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc complete |
| 18 | Transportation of PVC belt (1000mm) from surface to u/g or one section to another section in u/g through haulages with tramming, pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading, unloading & stacking the same at destination Note: For each additional distance of 1.0 Km beyond original lead 1.0Km, there will be 15% enhance in rate. Avarage lead 1.5 KM (Qty. |
| 19 | Placing of PVC belt (1000mm) on conveyor structures in u/g including jointing of belt and aligning of belt conveyor |
| 20 | Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/transporting from other section through haulages/pushing manually. |
| 21 | Shifting of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/transporting from other section through haulages/pushing manually |
| 22 | Transportation of rail line (30lbs), wooden/iron sleepers, fish plates, nut bolts, dog nail etc. Including loading on trolley, transporting through haulages/pushing manual from surface to u/g Or one section to another section up to destination/end of track, unloading & stacking the same. |
| 23 | Establishing of haulage track line in u/g inincluding carrying of rails & sleepers, laying & jointing of rails by fish plate with nut-bolts and fitting with sleepers by dog nail with a lead of 50 m. |
| 24 | Filling/packing of haulage track line with unserviceable materials/debris in a layer and consolidating of each layer by ramming, lead upto 50 m. (6142 X 1.50 X 0.30 = 2763.90m3) |
| 25 | Dismantling of haulage track line in u/g from old section and stacking of useful materialsWith in a distance of 50m |
| 26 | Part -B (Material cost) supply & stacking of materials at Damni UG Mine Cement |
| 27 | Stone chips Please Enable Macros to View BoQ information |