| 1 | Dis-connection of Electrical cables,earthing strips,neutral wire from control panel of DEA set etc as reqd. |
| 2 | Loading of canopy/conventional type DEA set with all acessories to truck by crane at the site etc as reqd |
| 3 | Transportation of 15 KVA DEA set Canopy type, along with all acessories recovered from the site by engagement suitable transportation medium including escorting from Closed BTS Mochibandha to Divisional Store,O/o-The DGM (OP),TE and AdmnBldg Compound Keonjhar etc complete as reqd. (The rate should be inclusive of Toll gate fees/charges wherever applicable, Nothing extra will be paid towards toll gate/any other fees/charges. Distance will be on shortest route through existing NH/SH/ODR only). |
| 4 | Unloading of canopy/conventional type DEA set with all acessories from the truck by crane at the site etc as reqd |
| 5 | Dismantaling of the following electrical equpments after disconnection of LT cables,making goods the damages etc complete as required. |
| 6 | Feeder panel |
| 7 | LT Cable of size 3.5x25sqmm cable(approx 30mtrs) |
| 8 | Dismantling of WAC units i/c disconnection etc as reqd. |
| 9 | 4+12way TPN DB |
| 10 | 63 amp FP isolator,MCB etc(8nos) |
| 11 | AC box & starter |
| 12 | Internal wiring of BTS |
| 13 | Exhaust fan |
| 14 | Power plant wiring |
| 15 | Transportation of above materials of item no-5 from Closed BTS Mochibandha to Divisional Store,O/o-The DGM (OP),TE and AdmnBldg Compound Keonjhar on road by engagement of required man power, tools & Plants, lifting, suitable transportation medium including loading Unloading at both ends complete as required. |
| 16 | Dismantling the following ratings faulty transformer from the existing D.P. structure by chain pully arrangement /crane with qualified staff, arranging required tools & plant with proper precautionary measures etc. as required. |
| 17 | 25 KVA, 11KV/0.433KV, 50 Hz Aluminium wound oil cooled Transformer |
| 18 | Dismantling of AB switch,HG fuse,LA,pin insulator,disc insulator ,Earthing strip, Dp jumpering etc from 25KVA transformer SS & keeping all the materials in a safe place as per as per the direction of Engineer -in- charge etc as reqd. |
| 19 | Dismantling of all existing old/ damaged MS channels (100mm x2.9mx9nos),M.S angle(50mm x 2.9m x 2nos),MS flat all structural items other than pole by removing all bolts & fixing hardwares ,using cutting machine/gas cutter for non where ever required,keeping aside the recovered itemsfor further disposal as required. |
| 20 | Dismantling of all existing 200mmx100mmx11m joist pole using cutting machine/gas cutter for non where ever required,taking all safty measures as required. |
| 21 | Liaison with the Electricity DISCOMs for taking shutdown of HT/MV lines for dismantling of Service connection cable,transformer,AB switch,HG fuse,DP structure/Energy Meter/ Meter box/Feeder panel etc. etc. complete as required.(2days) |
| 22 | Transportation of above materials of item No-7,8,9, & 10 from Closed BTS Mochibandha to Divisional Store,O/o-The DGM (OP),TE and AdmnBldg Compound Keonjhar on road by engagement of required man power, tools & Plants, lifting, suitable transportation medium including loading Unloading at both ends complete as required. Please Enable Macros to View BoQ information |