|
| 1 | Laying of haulage track line of 100m length with 30lbs rail (100m×2) in underground. Materials(e.g. trolley, haulage facility etc) will be provided by colliery management. |
| 2 | Transportation of 100m track line (i.e. 100m×2=200m rail of 30 lbs) from surface/ old working to site of installation in UG for a lead of 2 km. Materials will be provided by colliery management including Electrical and Mechanical Hands |
| 3 | Packing of haulage track (1.20 m wide & 0.20 m thick) in UG with packing materials available within a lead of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. |
| 4 | Supply & Fixing a) MS Dognail |
| 5 | b) MS Nut & Bolts |
| 6 | c) Wooden Sleepers |
| 7 | Dismantling, transportation and laying / installation of endless haulage /Direct Haulage considering at a lead of 2km. max. from old site to new site in UG or from surface to UG. Materials i.e. (trolley, haulage facility, rope clippings, etc) will be provided by colliery management including Electrical and Mechanical hand |
| 8 | Transportation, Laying & splicing of Haulage rope (1000m Length & Dia. 19/22mm) from surface to required UG site or old working to new working or vice-versa at the lead of 2 km max. Materials(e.g. trolley, haulage facility, rope splicing, etc) will be provided by colliery management. |
| 9 | (1)Transportation of one HT pump from surface to underground old working/ new working or old working to new working or vice-versa for a lead of 1km (for every additional 500m or part thereof there would be 15% increase in rate). Note (1) Materials i.e. pump, pipe line etc. will be provided by colliery management including facilities of disconnection/connection of electrical accessories etc. (2) Foundation will be made/ provided by colliery management. |
| 10 | Transportation of motor, starter for HT pump from surface to UG old working/ new working or old working to new working or vice-versa for a lead of 1 km (for every additional 500m or part thereof there would be 15% increase in rate). Note (1) Materials i.e. pump, pipe line etc. will be provided by colliery management including facilities of disconnection/connection of electrical accessories etc. (2) Foundation will be made/ provided by colliery management. |
| 11 | Transportation of one HT pump capacity from end of track line to site of installation at a lead of 100m. Note (1) Materials i.e. pump, pipe line etc. will be provided by colliery management including facilities of disconnection/connection of electrical accessories etc. (2) Foundation will be made/ provided by colliery management. (for underground) |
| 12 | Transportation of motor, starter for HT pump capacity from end of track line to site of installation at a lead of 100m. Note (1) Materials i.e. pump, pipe line etc. will be provided by colliery management including facilities of disconnection/connection of electrical accessories etc. (2) Foundation will be made/ provided by colliery management. (for underground) |
| 13 | Installations of one HT pump at the proposed site. Note (1) Materials i.e. pump, pipe line etc. will be provided by colliery management including facilities of disconnection/connection of electrical accessories etc. (2) Foundation will be made/ provided by colliery management. (for underground) |
| 14 | Laying of 4\\" dia pipe line for water supply to LHCM |
| 15 | Laying of 6\\" dia pipe line for pumping |
| 16 | Laying of 8\\" dia pipe line for pumping |
| 17 | Groove cutting in roof/ floor (Hard Stone) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) |
| 18 | Groove cutting in roof/ floor (Coal) for Stopping & Manhole by using chisel & hammer and removal of excavated cuttings up to a distance of 30m. Materials (i.e. hand shovel, hammer etc.) will be provided by the colliery management. (for underground) |
| 19 | Malma cleaning/Removal of debris for site clearance |
| 20 | Providing and laying in position cement concrete of specified grade excluding the cost of centering and shuttering - All work up to plinth level: 1:2:4 (1 cement : 2 coarse sand : 4 graded stone aggregate 20 mm nominal size). |
| 21 | Centering and shuttering including strutting, propping etc. and removal of form for : Walls (any thickness) including attached pilasters, butteresses, plinth and string courses etc. |
| 22 | 12 mm cement plaster of mix: 1:6 (1 cement : 6 coarse sand) |
| 23 | Loading of materials Cement tubs at surface with in a lead of 50m. |
| 24 | Loading of materials Sand tubs at surface with in a lead of 50m. |
| 25 | Loading of materials Stone Chips tubs at surface with in a lead of 50m. |
| 26 | Unloading of materials Cement at destination in UG within a lead of 50m(For each additional lead of 50m ,subject to 0.50km maximum, there will 14.67% increase in rate) |
| 27 | Unloading of materials Sand at destination in UG within a lead of 50m(For each additional lead of 50m ,subject to 0.50km maximum, there will 14.67% increase in rate) |
| 28 | Unloading of materials Stone Chips at destination in UG within a lead of 50m(For each additional lead of 50m ,subject to 0.50km maximum, there will 14.67% increase in rate) |
| 29 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |