| 1 | Kachha drain/Demolishing of existing concrete |
| 2 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 3 | Demolishing cement concrete manually/by mechanical means including disposal of material within 50 meters lead as per direction of Engineer-in- charge: 1:3:6 or richer mix (i/c equivalent design mix) |
| 4 | Construction of Cement Concrete Drain/Edge wall |
| 5 | Earth work in excavation by mechanical means (hydraulic excavator) in trenches for foundations, drains, pipes, cables etc. (not exceeding 1.5 m in width) and for shafts, wells, cesspits and the like not exceeding 10 sqm on plan, including dressing of sides and ramming of bottoms lift upto 1.5 m, including getting out excavated earth and disposal of surplus excavated earth as directed, within a lead of 50 metres: All kinds of soil : |
| 6 | Providing and laying of stone soling, hand packed, including carriage of same from approved source upto site of work complete. |
| 7 | P/L in position cement concrete in 1 : 4 : 8 (1 cement : 4 coarse sand : 8 graded crushed stone aggregate, 40mm nominal size) excluding the cost of centering and shuttering but including carriage of all materials from approved sources up to site of work complete. |
| 8 | P/L in position cement concrete in 1 : 2 : 4 (1 cement : 2 coarse sand : 4 graded crushed stone aggregate, 20mm nominal size) excluding the cost of centering and shuttering but including carriage of all materials from approved sources up to site of work complete. |
| 9 | Centering & shuttering including strutting, propping etc including removal of form work |
| 10 | Foundations, footings, bases of columns etc. for mass concrete |
| 11 | providing and fixing of pvc weep holes of bType B of standard quality 75 mm dia upto 1200 mm long as required embedded in concrete all complete as per the directions of incharge engineer at site |
| 12 | Supply, filling of RBM/ nallah muck including ramming, watering and consoldating with carriage of material upto site of work all complete as per the directions |
| 13 | supplying and laying of RCC pipes |
| 14 | Providing & Laying of RCC pipes in trenches in proper position including excavation of trenches refilling of excavated materials got from excavation. Providing of cushion over pipes incld all carriages of pipes, loading ,unloading and stacking etc complete 18'' mm dia |
| 15 | Providing & Laying of RCC pipes in trenches in proper position including excavation of trenches refilling of excavated materials got from excavation. Providing of cushion over pipes incld all carriages of pipes, loading ,unloading and stacking etc complete 12'' mm dia |
| 16 | Providing & Laying of RCC pipes in trenches in proper position including excavation of trenches refilling of excavated materials got from excavation. Providing of cushion over pipes incld all carriages of pipes, loading ,unloading and stacking etc complete 36'' mm dia |
| 17 | Providing and laying of RBM/ Nallah Muck |
| 18 | Supply, filling of RBM/ nallah muck including ramming, watering and consoldating with 8-10 Tonne road roller with carriage of material upto site of work all complete as per the directions |
| 19 | Providing and laying of WBM GII |
| 20 | Providing and Laying of WBM base course with specified stone aggregate of size 63-45mm , stone screening 13.2 mm and binding material including , sorting, spreading to template,m watering and consolidation with P.R.R of (8-10 Tonne) capacity all complete including carriage of material from approved source upto site of workas per the directions of incharge engineer at site (compacted quantity to be measured) Please Enable Macros to View BoQ information |