|
| 1 | Excavation including loading, unloading, disposal and dressing of excavated earth within initial lead of 50m and lift up to 1.5m including dressing of excavated area and dewatering wherever required complete in all respect (BSR WRD 2023,ch.V item no.1b,2a 2b) (BSR WRD-2023 Kota Zone, chap V )(i) Hard / dense soil |
| 2 | सीमेंट कंक्रीट 1 सीमेंट : 4 बजरी तथा 8 गिट्टी / 1 सीमेंट, 3 बजरी तथा6 गिट्टी पत्थर की 20 मिमी नामीय माप की नींव में डालना,कूटना तथा तराई आदि सहित एनीकट के लिए। 1:3:6 वाईब्रेटर व मिक्सर का उपयोग नही करने पर 3 प्रतिशत कटौती की जावे। FOUNDATION ITEM 170 B GKN Nainwa 2025-26 |
| 3 | Random rubble stone masonary in cement sand mortor (1:6) for foundation( BSR GKN-2025-26 item no 166 |
| 4 | Random rubble stone manonary in cement sand mortor (1:6) for super structure( BSR GKN-2025-26 item no 166) |
| 5 | Stone kharanja dry 23 cm thick complete ( BSR GKN-2025-26 item no148 b) |
| 6 | Cement plaster including smooth finishing in cement mortar ( 1:4 ) 25 mm thick( BSR GKN-2025-26 item no76a) |
| 7 | Cement concrete well mixed in cement mortar( 1:2:4 ) laid in position complete including curing. Aggregate size up to10-12 mm. HB( BSR GKN-2025-26 item no 142 a) |
| 8 | जे.सी.बी. मशीन/ट्रेक्टर मय स्क्रेपर द्वारा मिटटी खुदाई कार्य, खोदी हुई मिटटी के डगलों को तोडने (Breaking of clods), घास एवं कंकर, पत्थर को अलग करना (Sorting of grass & pebbles) एवं बण्ड (Bund) का सेक्शन (काट क्षेत्रफल में)/प्रोफाइल संधारित करना मय चढाना एवं उतारना प्रारंभिक लीड 250 मी. एवं लिफ्ट 3 मी. तक। Draft based on chapter 5th of irrigation page number 32 to 34 (दिनाँक 01/02/2017 से मान्य) ईकाई 1 घन मी. (मशीनरी कार्य सख्त मिट्टी (in Hard Soil) ) (xzkeh.k dk;Z funsZf'kdk 2025 dh CykWd Lrjh; nj vuqlwph ds vuqlkj dz-la-196 Ck) |
| 9 | Benching base and depositing the excavated material including dressing etc. complete within initial lead up to 50m and lift up to 1.5m (BSR WRD 2023 chapter -V, Item no. 20) |
| 10 | Earthwork in rough (borrow area) excavation for embankment in hard soil, Morrum or highly weathered strata dry or moist, including laying in 20cm layers (before compaction) and breaking of clods, sorting of grass, pebbles etc. and dressing when compacted manually or by plain roller with initial lead of 250m and lift up to 1.5m (excluding charges for compaction and watering), in cluding loading and un-loading wherever required complete in all respect.(BSR WRD 2023 chapter -V, Item no. 16)कठोर मिट्टी में |
| 11 | Compaction of earth or highly weathered strata By manually or plain roller. (BSR WRD 2023 chapter -V, Item no. 18a) |
| 12 | Watering of earth including cost of carriage of water when source of water is up to 3 Km (BSR WRD 2023 chapter -V, Item no. 28) |
| 13 | BY WASH gsrq feV~Vh [kqnkbZ dk dk;Z in Hard soil mixed with Kankar / boulders, Morrum¼ch,lvkj] 2023 ty lalk/ku foHkkx cwanh ds psIVj ua0 5 vkbVe ua0 1 lh½ Please Enable Macros to View BoQ information |