| 1 | Demolishing R.C.C. work manually /by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 m lead as per direcion of engineer in charge. |
| 2 | Reinforced cement concrete work in beams, suspended floors, roofs having slope up to 15° landings, balconies, shelves, chajjas, lintels, bands, plain window sills, staircases and spiral stair cases above plinth level up to floor five level, excluding the cost of centering, shuttering, finishing and reinforcement with 1:1.5:3 (1 cement : 1.5 coarse sand(zone-III) : 3 graded stone aggregate 20 mm nominal size). |
| 3 | Centering and shuttering including strutting, propping etc. and removal of form for : |
| 4 | Lintels, beams, plinth beams, girders, bressumers and cantilevers |
| 5 | Columns, Pillars, Piers, Abutments, Posts and Struts |
| 6 | Edges of slabs and breaks in floors and walls under 20 cm |
| 7 | Steel reinforcement for R.C.C. work including straightening, cutting, bending, placing in position and binding all complete above plinth level. |
| 8 | Thermo-Mechanically Treated bars of grade Fe-500D or more. |
| 9 | Smooth finishing of the exposed surface of R.C.C. work with 6 mm thick cement mortar 1:3 (1 Cement : 3 fine sand). |
| 10 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq. meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground within 50 metres lead |
| 11 | With cement mortar 1:4 (1cement: 4 coarse sand). |
| 12 | Disposal of malba,building rubbish, earth, sludge, manure, garbage, etc. to the municipal dumping ground i/c loading, unloading, lead and lift from 3rd floor all complete to the satisfaction and direction of EIC. |
| 13 | Dismantling & dismembering of 21 M ROOF TOP TOWER GSM/WLL Tower consisting of structural steel work bolted in built up section (upto 21 m height of tower) including cutting of nuts/bolts if required, dismembering of wave guide, ladder, de-hoisting of the members as well as stacking and sorting out the tower members/nuts & bolts including making bundles in groups with binding strips and handing over all complete as per the direction of Engineer-in-charge. Notes :The items includes for the following and nothing extra shall be paid on this accounts. (a) The agency shall take every precautions against the damages to the structure or near by structures while dismantling / dehoisting the tower. (b) Necessary safety precautions to protect the human-lives, insurance coverage to the labours etc. shall be the sole responsibility of the agency. (c) Nuts / bolts and washers dismantled shall be collected size-wise and kept in separate gunny bags (d) Item includes all operations, tools & plants, equipments, machinery etc. required for the work as well as safety measures as per the relevent IS codes. This charges are for dismantling of tower of approximate weight of tower upto 2.00 Metric tonne. |
| 14 | Dismantling of wave guide ,feeder cables,antennas,Electric cable,aviation Lamp Spike Guard and Earthing G.I. flats fromtop to bottam and rolling /bundling and stacking as per instruction incharge.refixing the same at new site. |
| 15 | Carriage of 21 M RTT material, antenna, ladder etc. including loading, unloading from Rented BSNL Site at 4-E-404 JNV colony,Bikaner to New site at 4-E-387 JNV Colony , Bikaner upto 200m lead approx weight 4.0 Metric tonne i/c errection same. as directed by E-I-C.. |
| 16 | Supplying ancher tower bolts for RTT tower of specified design and specifications at site as per direction of Enginner in Charge |
| 17 | Fixing, placing and embedding in position required number of foudation anchor bolts ,nuts and template in each leg of RCC column and beam of 3 legged tower as per the structural drawing and agrement mainttaining the leveling and verticality centre to centre distance accurately all complete as per direction by Engineer in chsrge. |
| 18 | Erection of Roof Top Tower upto 21M height at desired location and floor as decided by competent authority. This includes all labour and works involed in erection of tower, including shorting numbering etc. All complete as per direction of Engineer in Charge. |
| 19 | Welding plant at site i/c welding of new column bars to exiting slab/ beam & column reinforcement bars as didirected by engineer in charge.( New reinforcement to be paid separately ) |
| 20 | Painting with LUXOL High Gloss synthetic enamel paint with two or more coats of required shade and colour to give an even shade as per aviation requirements etc all complete as per the direction of Engineer-In_Charge.(The agency shall arrange for all the material ,labour, T &P etc. required for the work. |
| 21 | 21 m high RTT tower (3L) |
| 22 | Credit to the department for unserviceable reinforcement received from dismantling and other iron scrap etc. |
| 23 | Supplying 1 mm thick M.S. sheet template as per drawing and as per dircted by engineer in charge. Please Enable Macros to View BoQ information |