| 1 | PARTICULAR |
| 2 | PART - A (LABOUR COST)Dismantling of belt structure along with PVC belt (800mm/1000mm) including cleaning stacking the same within a distance of 50m(i)Along 47LE/22D to 36D = 589m.(ii)Along 22D/38L to 47L= 230m.After completion of dep. Oper. C3, (iv)38LE/36D to 54D = 500m. From Panel-C1/C2 (VI TOP )to C3 = 819m From Panel C3 to C4 (VI TOP) = 500m Total = 1319m |
| 3 | Transportation of steel structures materials from surface to underground through haulages with tramming & pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination OR Transportation of all dismentaled steel structures materials in ug from one section to others section or ug to surface through haulages with tramming & pushing, coupling /uncoupling etc for a distance every 1.0 Km or part thereof including loading/unloading & stacking the same at destination. |
| 4 | Transportation of PVC belt (1000/1200mm) from surface to u/g or one section to other section in u/g through haulages with tramming, pushing, coupling/uncoupling etc for a distance every 1.0 Km or part thereof including loading, unloading & stacking the same at destination.1480x2=2960m(For additional lead for every 1.0 Km beyond original 1.0 Km, there will be 15% enhance in) |
| 5 | Installation/erection of complete belt conveyor structure (1000mm/1200mm) in u/g including cleaning of site, laying & fitting stool, strangers, brackets, bottom rollers, top rollers, pull card switches etc completeLocation Pannel C3- 38LE/22D to 54D =830m., 34R/38LE to 29LE = 330m., 29LE/34R to 48D =320m., Panel C3 VI Top= 830mPanel C4 VI Top =650m,Total Length =1480m |
| 6 | Placing of PVC belt (1000/1200mm) on conveyor structures in u/g including jointing of belt and aligning of Belt conveyor1480x2=2960m |
| 7 | Installation of tail end drum of belt conveyor (800/1000mm) with drum base tail end safety guard, side plates/loading bracket (chute), decking plates etc in u/g (1st time) including dismantling & carrying/transporting from other section through haulages/pushing manually. |
| 8 | Dismantling of haulage track line in u/g from old section and stacking of useful materials within a distance of 50m.(i)55L/32D to 46D=340m(ii)32D/48L TO 55L =180M (iii)48L/21D to 48D = 700m, (iv)21D/39L TO 48L=250M, TOTAL=1470m |
| 9 | Transportation of rail line (30lbs),wooden/iron sleepers, fish plate, nut bolts, dog nail etc Including loading on to trolley, transporting through haulages/pushing by manual from surface to u/g or one section to another section up to destination/ end of track, |
| 10 | Establishing of haulage track line in u/g including carrying, laying jointing of rail line by fish plate/nut bolts and fitting with sleepers by dognail with a lead of 50m.(i)39LE/21D to 53D=820m, (ii)35R/39L to 28L=350m, (iii)28LE/35R to48R=300m, TOTAL=1470m |
| 11 | Filling/packing of haulage track line with debris/unserviceable materials in a layer and Consolidating by ramming, lead up to 50m., 1470.0 × 1.60 × 0.25 = 588.00 m3 |
| 12 | Transportation of haulage rope from surface to u/g through haulages with tramming & pushing, Coupling/uncoupling etc. for a distance every 1.0Km or part thereof including loading, unloading and stacking the same at destination. OR Transportation of dismantledhaulage rope in u/g from one section to another section or u/g to surface through haulages with tramming & pushing. coupling/uncoupling etc. for a distance every 1.0 Km or part thereof including loading, unloading & stacking the same at destination. For Endless Haulage = 1470 ×2 = 2940.0 Mtr. |
| 13 | Laying of haulage rope along track line including carrying, laying, jointing/splicing of rope with a lead of 100m. |
| 14 | Installation of return pulley of haulage in u/g with frame, tension arrangement, safety guard fencing including loading on trolley, transporting through haulages/pushing manually from surface to u/g or one section to another section in u/g and placing the same. (i)39LE/53D Junction, (ii) 35R/27L Junction, (iii) 28LE/48R Junction. |
| 15 | Shifting of return pulley of haulage in u/g with frame, tension arrangement, safety guard fencing from one place to another place in same working district in u/g with a distance 100m. Along 39LE from 22D to 53D = 820/100 = 08Along 28LE from 35R to 48R = 300/100 = 03 TOTAL = 11 |
| 16 | Dismantling, transportation & installation of endless haulage with all accessories (such as base drum, motor, gear box, starter, resistance, controller, rope etc) and anchoring tension pulley including loading, transporting through haulages/pushing by manual from old site to proposed site in u/g and assembling the same as per instruction of Exc. In-charge. (i)39LE/25D, (ii) 35R/between 37L-38L, (iii)28LE/between34R-35R |
| 17 | (PART-B):- LABOUR COSTCutting in soft stone by chisel & hammer for digging of pits of foundation work-a) for drive head- For Double drum drive head: 01 No. (5.00x1.00x1.00 = 5.00 m3 (5.00x0.50x1.00 = 2.50 m3 (4.00x0.50x1.00 = 2.00 m3. (0.50x0.50x1.00) x 04 = 1.00m3 Total = 10.50m303 Nos. Double drum drive head x 10.50m3 =31.50 m3For Single drum drive head: 01 No. (0.60x0.60x1.00) × 04 . = 1.44 m301 Nos. Double drum drive head x 1.44m3 =1.44m3 Total = 03 nos double drum drive head and 01 no single drum drive head for panel C3 & C4 (Total 31.50 m3 + 1.44 m3 = 32.94 m3) |
| 18 | Cement Concrete/PCC (1:2:4) in foundation /plinth / flooring (any thickness) in u/g (Excluding centring, shuttering and cost of materials)For Double drum drive head: 01 No. (5.00x1.00x1.30 = 6.50 m3 (5.00x0.50x1.30 = 3.25 m3 (4.00x0.50x1.30 = 2.60 m3 (0.50x0.50x1.30) x 04 nos = 1.30m3 Total = 13.65m303 Nos. Double drum drive head x 13.65m3 =40.95m3For Single drum drive head: 01 No. (0.60x0.60x1.30)×04 Nos .= 1.87 m301 Nos. Double drum drive head x 1.87m3 =1.87 m3(Total 40.95 m3 + 1.87 m3=42.82 m3) |
| 19 | Centring, shuttering, finishing and reinforcement including cutting, bending, placing in position and binding and strutting, propping etc complete. For Double drum drive head: 01 No.(5.00+1.00+1.00)x 0.30=2.10m2(5.00+0.50+0.50)x 0.30=1.80m2(4.00+4.00+0.50+0.50)x 0.30=2.70 m2(0.50+0.50+0.50+0.50)x 4=8.00m2x0.30 = 2.40 m2 Total = 9.00m203 Nos. Double drum drive head x 9.00 m2 =27.00 m2For Single drum drive head: 01 No. (0.60+0.60+60.60) × 04 Nos .= 9.60 × 0.30 = 2.88 m201 Nos. Double drum drive head x 2.88 m2 =2.88 m2(Total- 27.00 m2 + 2.88 m2 = 29.88 m2) |
| 20 | Loading of all kind of building materials in to tubs at incline/Pit mouth on surface with lead of 50m.CEMENT |
| 21 | 20 mm STONE AGGREGATE |
| 22 | Transportation of all kind of building material from surface to u/g through haulages with tramming and pushing, coupling /uncoupling etc for a distance every 2.0 Km or part there of and bringing the empty tubs to surface.CEMENT |
| 23 | 20 mm STONE AGGREGATE |
| 24 | Unloading of all kind of building materials from tubs at destination in u/g and stacking the same. CEMENT |
| 25 | 20 mm STONE AGGREGATE |
| 26 | Lead for transportation/carriage of all kinds building material in UG 61m to 75m |
| 27 | Installation of 800mm drive head (Single drive drum) with all accessories(without loop take-up) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge/ Engineer. |
| 28 | Installation of 1000 mm drive head (double drive drum) with loop take-up & all accessories (like as motor, gearbox, drive drum, girders, frame, chute& side plates etc) including carrying manually from end of track in u/g and assembling the same as per instruction of Exe. In-charge |
| 29 | Dismantling & transportation of 800mm drive head (Single drive drum) with all accessories without loop take-up with lead of 100m/up to track end in u/g. |
| 30 | Dismantling & transportation of 1000mm drive head (double drive drum) with loop take up and all accessories(like as motor, gear box, drive drum, garders, frame, chute and side plate etc.) with lead of 100m/up to track end in u/g. |
| 31 | PART-C (Material Cost):-Supply & stacking of materials at Bangwar UG MineCEMENT |
| 32 | 20 mm STONE AGGREGATE Please Enable Macros to View BoQ information |