|
| 1 | Transportation of 1000mm PVC belting from surface to UG/ one panel to another panel in UG up to end of track line for a lead of 1 KM |
| 2 | Transportation from surface (Incline Mouth) to (from 4L/MD to 020L/01R) (Distance of Transportation = 980 mtrs.) |
| 3 | Transportation from surface (Incline Mouth) to (from 020L/01D to 020L/8R) (Distance of Transportation = 1620 mtrs.) |
| 4 | Transportation from surface (Incline Mouth) to (from 015L/01D to 015L/20R) (Distance of Transportation = 1430 mtrs.) |
| 5 | Transportation from surface (Incline Mouth) to (from 010L/01D to 010L/34R) (Distance of Transportation = 1670 mtrs.) |
| 6 | Dismantling and Transportation of 1000mm PVC belting from surface to UG/ one panel to another panel in UG up to end of track line for a lead of 1 KM : Dismantling from 020L/01D to 020L/8R & 015L/01D to 015L/20R & 01R/20L to 01R/15L = 940 x 2 = 1880 mtrs., Distance of Transportation = 645 mtrs. (20L/8R to 05L/01D) |
| 7 | Change of PVC belting on conveyor structure |
| 8 | From 4L/MD to 020L/01R (666 x 2 = 1332 mtrs.) |
| 9 | From 020L/01R to 020L/8R (255 x 2 = 510 mtrs.) |
| 10 | From 015L/01D to 015L/20R (570 x 2 = 1140 mtrs.) |
| 11 | From 010L/01D to 010L/34R (940 x 2 = 1880 mtrs.) |
| 12 | From 05L/01D to 05L/34R (940 x 2 = 1880 mtrs.) |
| 13 | Transportation/Carriage of Steel Structure by manual labour including loading , unloading and stacking the same for a lead of 50 m in UG |
| 14 | Transportation from surface (Incline Mouth) to (from 4L/MD to 020L/01R) (Distance of Transportation = 980 mtrs.) |
| 15 | Transportation from surface (Incline Mouth) to (from 020L/01D to 020L/8R) (Distance of Transportation = 1620 mtrs.) |
| 16 | Transportation from surface (Incline Mouth) to (from 015L/01D to 015L/20R) (Distance of Transportation = 1430 mtrs.) |
| 17 | Transportation from surface (Incline Mouth) to (from 010L/01D to 010L/34R) (Distance of Transportation = 1670 mtrs.) |
| 18 | Dismantling of belt structure of 1000 mm in UG and Transportation of the same up to end of track at a lead of 100 m in UG : Dismantling from 020L/01D to 020L/8R & 015L/01D to 015L/20R & 01R/20L to 01R/15L = 940 mtrs., Distance of Transportation = 645 mtrs. (20L/8R to 05L/01D) |
| 19 | Installation of Belt Structure of 1000mm in UG gallery |
| 20 | From 4L/MD to 020L/01R |
| 21 | From 020L/01R to 020L/8R |
| 22 | From 015L/01D to 015L/20R |
| 23 | From 010L/01D to 010L/34R |
| 24 | From 05L/01D to 05L/34R |
| 25 | Dismantling, transportation and installation of 1000 mm size tail end drum, drum base, tail end guard, side plate/loading chute, decking plate in UG within a lead of 100 mtr. |
| 26 | Transportation from surface (Incline Mouth) to (from 4L/MD to 020L/01R) (Distance of Transportation from surface to 4L/MD i.e. 310 mtrs.) (13 shiftings at a span of 50 mtrs.) and installation at 2L/01R |
| 27 | Transportation from 0L/MD (Seam-III) to (020L/01R to 020L/8R) (Distance of Transportation = 780 mtrs.) (05 shiftings at a span of 50 mtrs.) and installation at 020L/03R |
| 28 | Transportation from 0L/MD (Seam-III) to (015L/01D to 015L/20R) (Distance of Transportation = 650 mtrs.) (11 shiftings at a span of 50 mtrs.) and installation at 015L/03D |
| 29 | Dismantling at 020L/8R, Transportation from 020L/8R to 010L/01D (Distance of Transportation = 520 mtrs.) (18 shiftings at a span of 50 mtrs.) and installation at 010L/03D |
| 30 | Dismantling at 015L/20R, Transportation from 015L/20R to 05L/01D (Distance of Transportation = 830 mtrs.) (18 shiftings at a span of 50 mtrs.) and installation at 05L/03D |
| 31 | Dismantling and transportation of 1000 mm size double drive drum with loop take-up upto the track end with a lead of 100 m |
| 32 | Transportation from surface (Incline Mouth) to (from 4L/MD to 020L/01R) (Distance of Transportation from surface to 4L/MD i.e. 310 mtrs.) |
| 33 | Transportation from 0L/MD (Seam-III) to (020L/01R to 020L/8R) (Distance of Transportation = 780 mtrs.) |
| 34 | Transportation from 0L/MD (Seam-III) to (015L/01D to 015L/20R) (Distance of Transportation = 650 mtrs.) |
| 35 | Dismantling at 020L/8R, Transportation from 020L/8R to 010L/01D (Distance of Transportation = 520 mtrs.) |
| 36 | Dismantling at 015L/20R, Transportation from 015L/20R to 05L/01D (Distance of Transportation = 830 mtrs.) |
| 37 | Installation of 1000 mm size double drive drum with loop take-up |
| 38 | Installation at 4L/MD |
| 39 | Installation at 020L/01R |
| 40 | Installation at 015L/01D |
| 41 | Installation at 010L/01D |
| 42 | Installation at 05L/01D |
| 43 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |