| 1 | Excavation of pole pit for pole upto 8.00m length by using JCB/Manual |
| 2 | Erection of RCC, REC, PSC poles upto 8.00m length by using Crane / Manual |
| 3 | Excavation of pole pit for pole above 8.00m length by using JCB/Manual |
| 4 | Erection of RCC, REC, PSC poles above 8.00m length by using Crane / Manual |
| 5 | Fixing of Tapping X-Arm/Guarding X-Arm/V cross arm |
| 6 | Fixing of LT 1 phase cross arm |
| 7 | Fixing of LT 3 phase cross arm |
| 8 | Fixing of 11 KV Strain Disc with Metal Parts |
| 9 | Fixing of 11 KV Pin Insulator/Polymer Pin Insulator |
| 10 | Excavation of Stay pit of 4.5 ' to 5 ' depth using JCB / Manual |
| 11 | Erection of stay set complete with fixing up stay wire Eye, Bow, Guy Shackle, Binding etc.. |
| 12 | Paving and stringing of conductors of sizes 7/4.09 mm ACSR or other equivalent conductor |
| 13 | Paving and stringing of conductors of sizes above 7/2.59 mm ACSR or other equivalent conductor |
| 14 | Paving and stringing of conductors of sizes upto 7/2.59 mm ACSR or other equivalent conductor |
| 15 | Fixing of LT Shackle |
| 16 | Fixing of LT Pin Insulator |
| 17 | Fixing of Alu Knob |
| 18 | Erection of 11 KV Single Pole Structure including erection of DT complete with centre support including fixing of MCD box |
| 19 | Loading and Unloading of Distribution Transformer (i) Upto 100 KVA |
| 20 | Loading and Unloading of line materials |
| 21 | Transporting of Distribution Transformer/line materials from stores to office /site upto 10 KM distance by engaging 1 Ton Capacity Minidor (Lorry) |
| 22 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (i) For a lead upto 5 KM |
| 23 | Transportation of all type of poles by bullock cart or other vehicle (for all sizes of poles including loading and unloading) (ii) Above 5 KM (3X75 =Rs.225) |
| 24 | Dismantling of line materials, cross arm, clamps, TI Fittings etc.., |
| 25 | Concreting with 1:4:8 mix using 40 mm Jelly including curing(Material + labour) (i) Mass concreting of poles |
| 26 | Earthing of Pole |
| 27 | Dismantling of conductor above 7/3.35 mm including closing of the pit |
| 28 | G.S.T. @18% should be Entered by the Bidder Please Enable Macros to View BoQ information |