| 1 | Cutting, pulling, and removal of the steel cord belt/fabric belt including rolling the old belt into sizes suitable for handling. | Cutting, pulling, and removal of the steel cord belt/fabric belt including rolling the old belt into sizes suitable for handling. |
| 2 | Dismantling of all items of system like structural items,chute, frames, idler stand ,pulley,gear box ,trestles,walkway,handrails,cable tray,guard ,pipe etc. By debolting / gas cutting inclusive of industrial gas,welding electrodes,manpower at all levels and locations etc. inclusive of handling facility by contractor. | Dismantling of all items of system like structural items,chute, frames, idler stand ,pulley,gear box ,trestles,walkway,handrails,cable tray,guard ,pipe etc. By debolting / gas cutting inclusive of industrial gas,welding electrodes,manpower at all levels and locations etc. inclusive of handling facility by contractor. |
| 3 | Transportation including Loading, Unloading and stacking of all structural items, equipment,belt and other scrap etc. to Designated Yard as directed by Engineer- in charge. Contractor to have his own mode of transport for this i.e. Truck, Mini truck,Hydra, Jeep etc. Handling facility to be provided by contractor. | Transportation including Loading, Unloading and stacking of all structural items, equipment,belt and other scrap etc. to Designated Yard as directed by Engineer- in charge. Contractor to have his own mode of transport for this i.e. Truck, Mini truck,Hydra, Jeep etc. Handling facility to be provided by contractor. |
| 4 | Dismantling of idlers,stacking the same and returning to designated yard as directed by Engineer- in charge. | Dismantling of idlers,stacking the same and returning to designated yard as directed by Engineer- in charge. |
| 5 | Dismantling of CGI Sheeting, stacking the same and returning to Designated Yard as directed by Engineer- in charge. | Dismantling of CGI Sheeting, stacking the same and returning to Designated Yard as directed by Engineer- in charge. |