| 1 | Supply of Material for construction of Pontoon BridgeSupply of wooden anchors for anchoring of Pontoons in upstream and downside including supply of different sizes of ballies, all material, labour and T & P etc. required as per direction of Engineer in charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 2 | Supply of Calcutta sutlee of good quality including cost of material and carriage upto site etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 3 | Supply of Indian sisal rope 32mm to 40mm dia. strengthening in longitudionally of Pontoon Bridge with anchors including cost of material,carriage and all taxes. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 4 | Supply of kanse/sarpat Poolas in Bundles 1.20M to 1.50M long and 1.0 M circumference (Av.) at a height of 15 cm from the bottom place as per direction of Engineer in charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 5 | Supply of Nariyal strings of approved quality 12mm dia. including cost of material and carriage etc. complete for tiding ballies. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 6 | Supply of Wire Rope 8 mm including cost of material and carriage upto site etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 7 | Supply of Wire Rope 10 mm including cost of material and carriage upto site etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 8 | Supply of M.S.Bolt 32 mm dia. and 300 mm long including cost of material and carriage upto site etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 9 | Supply of M.S.Bolt 12 mm dia. and 150 mm & 275 mm long including cost of material and carriage upto site etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 10 | Erection of Pontoon BridgeCarriying of pontoon pair to the river bank in water including dragging by tractor of making pairs and anchoring properly. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 11 | Carriage of pontoon pairs from the place of anchoring to the bridge site erection & adjustment from the adjustment of bridges in water and fixing to the other pantoon pair to form a part of pontoon bridge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 12 | Carriying and pulling wooden anchors in Ganga river water in proper position and anchoring by 32 to 40mm dia. sisal ropes and also including putting of sand bags in anchor. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 13 | Carrying and spreading kans/sarpat poolas over bridge way. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 14 | Carrying and spreading kans/sarpat poolas on approaches in service road before laying the chequered plate as per direction of Engineer in charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 15 | Fixing Railing Post on Pontoons over bridge with nut & bolt complete. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 16 | Providing & supply gunny bags including cost of sand and stitching of bags and laying in position. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 17 | Carriage of the following materials from store to bridge site for laying and fixing them on bridge including loading,unloading and stacking as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.(i) Chequered plate size 5.0 M x 1.0 M |
| 18 | Carriage of the following materials from store to bridge site for laying and fixing them on bridge including loading,unloading and stacking as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.(ii) Sal Sleepers 4.25 m long |
| 19 | Carriage of the following materials from store to bridge site for laying and fixing them on bridge including loading,unloading and stacking as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.(iii) R.S. joist 6.00 M long (ISMB 300 x 140mm) |
| 20 | Dismentling of Pontoon Bridge and Carriage of material to safe placeDismentling of pontoon in water & Carrying pairs from the bridge in water & carrying to the safe site at river banks & anchoring properly as well as to colect the materials as chequered plates. sleepers , R.S. Josts railing post, wire, nut bolts etc. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST. |
| 21 | Carriage of following material from bridge site to store after dismentling the pantoon including loading unloading and stacking properly as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.(i) Chequered plate size 5.0 M x 1.0 M |
| 22 | Carriage of following material from bridge site to store after dismentling the pantoon including loading unloading and stacking properly as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.(ii) Sal Sleepers 4.25 m long |
| 23 | Carriage of following material from bridge site to store after dismentling the pantoon including loading unloading and stacking properly as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, royality, Labour cess, all taxes complete. But excluding GST.(iii) R.S. joist 6.00 M long (ISMB 300 x 140mm) |
| 24 | Repairs of Old PontoonsRepairing of old demage pontoon including supply of sheet, bolts nut,labour & tool and plant etc. cutting, bending, welding etc complete as per direction of Engineer-in-charge. Including cost of all material, labour, T&P, all taxes and labour cess complete. But excluding GST. Please Enable Macros to View BoQ information |