|
| 1 | Material Supply & Erection of Scaffolding inside the primary reformer Furnaces for refractory inspection and creep measurement of catalyst tubes in Ammonia Plant. (One no. = One furnace of Primary reformer i.e. either Noth or South) | Material Supply & Erection of Scaffolding inside the primary reformer Furnaces for refractory inspection and creep measurement of catalyst tubes in Ammonia Plant. (One no. = One furnace of Primary reformer i.e. either Noth or South) |
| 2 | Material Supply & Erection of Scaffolding Towers at different locations in Ammonia Plant up to a height of 6.0 mtrs. | Material Supply & Erection of Scaffolding Towers at different locations in Ammonia Plant up to a height of 6.0 mtrs. |
| 3 | Material Supply & Erection of Scaffolding Towers at different locations in Ammonia Plant from 6 meter height up to 12 mtrs height. | Material Supply & Erection of Scaffolding Towers at different locations in Ammonia Plant from 6 meter height up to 12 mtrs height. |
| 4 | Material Supply & Erection of Scaffolding Towers at different locations in Ammonia Plant from 12 meter height up to 15 mtrs height. | Material Supply & Erection of Scaffolding Towers at different locations in Ammonia Plant from 12 meter height up to 15 mtrs height. |
| 5 | Material supply, erection and dismantling of scaffoldings up to 6 meter height at plant platform and tower platform up to 10 Mtr elevation from ground level. | Material supply, erection and dismantling of scaffoldings up to 6 meter height at plant platform and tower platform up to 10 Mtr elevation from ground level. |
| 6 | Material supply, erection and dismantling of scaffoldings up to 6 meter height at plant platform and tower platform from 10 meters and up to 20 Mtr elevation from ground level | Material supply, erection and dismantling of scaffoldings up to 6 meter height at plant platform and tower platform from 10 meters and up to 20 Mtr elevation from ground level |
| 7 | Material supply, erection and dismantling of scaffoldings up to 6 meter height at plant platform and tower platform from 20 meters and up to 30 Mtr elevation from ground level. | Material supply, erection and dismantling of scaffoldings up to 6 meter height at plant platform and tower platform from 20 meters and up to 30 Mtr elevation from ground level. |
| 8 | Material supply, erection and dismantling of Scaffolding for one boiler (Lot) | Material supply, erection and dismantling of Scaffolding for one boiler (Lot) |
| 9 | Erection & dismantling of scaffolding towers at DA-401 vessel at Urea plant from ground level to top of vessel i.e. vessel height of approx. 23 meters and as per attached drawing detail-NFL/PT/U/DA-401 | Erection & dismantling of scaffolding towers at DA-401 vessel at Urea plant from ground level to top of vessel i.e. vessel height of approx. 23 meters and as per attached drawing detail-NFL/PT/U/DA-401 |