|
| 1 | Labour for side clearance and lay-out |
| 2 | Earth Work in Excavation in Foundation Trenches in all kinds of soil with all complete Job as per direction of E/I |
| 3 | Providing cleen course Sand filling in foundation trenches and plinth -do- do- all complete Job as per specification and direction of E/I (5.1.10) B.C.D. |
| 4 | Providing 75B one Brick flat soling joints filled with local sand -do- do- all complete Job as per specification and direction of E/I (5.6.3) B.C.D. |
| 5 | Providing P.C.C. M - 100 with nominal mix of (1:3:6) in foundation trenches -do- do- all Complete Job as per direction of E/I (5.3.1.4) |
| 6 | Providing P.C.C. M-150 with nominal mix of (1:2:4) in foundation with approved quality of stone chips 20 mm to 6 mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening shuttering, mixing cement concrete in mixer, placing in position vibrating, striking, curing (but excluding the cost of reinforcement) taxes and royalty all comple as per building specificationand direction of E/I. |
| 7 | Providing designation 75B brick work in C.M. (1:6) in foundation & plinth with approved quality of clean coarse sand of F.M. 2 to 2.5 including providing 10mm thick mortar joints, cost of screening materials, raking out joints to 15mm depth, curing, taxes & royalty all complete as per building specification & direction of E/I. |
| 8 | Earth filling in foundaion trenches and plinth in layers not exceding 150 mm thick well watered, rammed, fully compacted and fine dressed with earth obtained from excavation of foundation trenches within a lead of 50 M and lift of 1.5 M all complete as per building specification and direction of E/I. (mode of measurement compacted volume)(5.1.7) |
| 9 | Providing 12 mm thick cement plaster (1:4) with approved quality of sand -do- do- all Complete Job as per building specification and direction of E/I (5.7.2) |
| 10 | Carriage of Materials :(i) Cement Av. Lead 7km |
| 11 | (ii)Sand Av. Lead 12 KmP |
| 12 | (iii)Stone Chips Av. Lead 10 KmP |
| 13 | (iv)Bricks Av. Lead 5 KmP |
| 14 | Earthwork in excavation in foundation trenches in ordinary soil (vide classification of soil item-A) and disposal of excavated earth as obtained to a distance up to 50 M including all lifts levelling ramming the foundation trenches removing roots of trees shrubs all complete as per approved design, building specification and direction of E/I. |
| 15 | Providing coarse clean sand in filling in foundation trenches or in plinth including ramming and watering in layers not exceeding 150mm thick with all leads and lifts including cost of all materials, labour, royalty and taxes all complete as per buy lading specification and direction of E/I (Mode of measurement compacted volume). |
| 16 | Providing designation 75B one Brick flat soling as per building specification and direction of E/I |
| 17 | Providing P.C.C M-150 in nominal mix of (1:2:4) in foundation with approved quality of stone chips 20mm to 6 mm size graded and clean coarse sand of F.M. 2.5 to 3 including screening shuttering mixing cement concrete in mixer and placing in position, vibrating, striking, curing taxes and royalty all complete as per building specification and direction of E/I |
| 18 | providing designation 75 B brick work in c.m (1:6)in foundation and plinth as per building specification and direction of E/I |
| 19 | Providing R.C.C. M - 200 with nominal mix of (1:1.5:3) s per building specification and direction of E/l. |
| 20 | Suspended floors roofs landing balconies and access platform |
| 21 | Providing reinforcment do-do-E/I |
| 22 | a)CEMENT+steel -15 KM |
| 23 | b) SAND-20KM |
| 24 | c)CHIPS -Lead 20 km |
| 25 | d) Bricks-8km |
| 26 | Goods & Service Tax (G.S.T. 18%) |
| 27 | 1% Labour Cess Please Enable Macros to View BoQ information |