| 1 | Repairs to plaster of thickness 12 mm to 20 mm in patches of area 2.5 sq.meters and under, including cutting the patch in proper shape, raking out joints and preparing and plastering the surface of the walls complete, including disposal of rubbish to the dumping ground, all complete as per direction of Engineer-in-charge.With cement mortar 1:4 (1 cement : 4 fine sand). |
| 2 | Demolishing R.C.C. work manually/ by mechanical means including stacking of steel bars and disposal of unserviceable material within 50 metres lead as per direction of Engineer - in- charge. |
| 3 | Extra for cutting reinforcement bars manually/ by mechanical means in R.C.C. or R.B. work (Payment shall be made on the cross sectional area of R.C.C. or R.B. work) as per direction of Engineer in-charge. |
| 4 | Extra for scrapping, cleaning and straightening reinforcement from R.C.C. or R.B. work. |
| 5 | Demolishing brick work manually/ by mechanical means including stacking of serviceable material and disposal of unserviceable material within 50 metres lead as per direction of Engineer-in-charge.In cement mortar |
| 6 | Disposal of cement concrete debries to dumping ground (lead about 15km) by mechanical transport, including bringing the materials to ground floor from terrace loading and unloading complete. (Net quantity with out voids will be measured for payment) |
| 7 | Dismantling of 15/18 m 3 Nos MARR masts with angular bracings and vertical and horizontal cable gantry and ladder with safety rings, antenna mounts etc., of steelwork in built up sections in angles, tees, flats, channels and pipes including all gusset plates, bolts, nuts, cutting rivets, welding etc. and also the cables/pvc pipes fixed to the gantry, including dismembering, lifting and stacking on terrace floor etc., complete as per the directions of Engineer-in-charge. The work is to be executed with specialised labour and the rate is inclusive of insurance charges for the labour. The job includes removal of 3 Nos marr masts including removing of all nus & bolts, all connecting angles, plates, etc and if required cutting the bolts & nuts, rivets etc with welding etc. and also removal of the horiznotal & vertical gantry, ladders etc including pvc pipes fixed to the gantry, dismembering, lifting and stacking the materials on terrace floor. All complete as per the directions of Engineer-in-charge. |
| 8 | Charges for Mechanical Transportation of 3 Nos 15/18 m high Marr masts including members, gantry members, ladder with safety rings etc., comprising of MS Tubes, angles, flats, channels, pipes, nuts, and bolts etc., of varying sizes and lengths from site of work to Gowliguda TE building or any other specified place in Hyderabad within approximate distance of 8.0 Kms. The rate includes bringing the material to ground floor from top terrace of the building, loading, unloading, mechanical transportation, all sundries etc. The materials shall be weighed by electronic weighing machine and the receipts of the actual weights shall be submitted to the Engineer-in-charge. The rate quoted is inclusive of all and nothing extra shall be paid on any account. All complete and as per directions of Engineer-in-Charge. |
| 9 | Rebate for Taking away the reinforcement bars obtained from dismantled RCC work in beams, columns etc as per the directions of Engineer-in-charge. (The weight of reinforcement bars shall be measured as per the standard coefficient of the reinforcement bar diameter for payment and nothing extra shall be apid on any account) Please Enable Macros to View BoQ information |