| 1 | Dismantling brick or stone masonry in lime or cement mortar above 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead A)Built up Area of Existing old Building Ground Floor |
| 2 | Dismantling brick or stone masonry in lime or cement mortar above 3m. height including stacking the useful materials for reuse and removing the debris within 50m. Lead A)Built up Area of Existing old Building First Floor |
| 3 | Convence of Excavated Dismantling quantity by mechanical means within 5km Lead |
| 4 | Double under reamed pile foundation 375 mm dia and 8.00 M long with R.C.C M20 using 12mm size black hard granite (Crusher Broken) Stone Chips including cost of boreholes but excluding cost of T.M.T bars and labour charges for cutting,bending and binding of steel . |
| 5 | Earth work in excavation of foundation of Ordinary soil with initial lift including rough dressing and levelling bed etc. complete as per direction of Engineer in charge. |
| 6 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance of materials, labour T&P, royalty etc. complete as per direction of the Engineer-in-charge. |
| 7 | Providing and laying P.C.C. (1:3:6) with 4cm size h.g. metal of approved quality in foundation / floor including hoisting laying concrete, cost & conveyance of materials, labour ,T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. |
| 8 | Providing & laying reinforced cement concrete work M-25 with 20 mm size hard granite chips of approved quality including hoisting laying concrete with rigid smooth centering / shuttering, necessary scaffolding, cost & conveyance of materials, labour,T&P, royalty, taxes, curing etc.complete but excluding cost of reinforcement and as per direction of the Engineer-in-charge. for Ground Floor |
| 9 | Providing & laying reinforced cement concrete work M-25 with 20 mm size hard granite chips of approved quality including hoisting laying concrete with rigid smooth centering / shuttering, necessary scaffolding, cost & conveyance of materials, labour,T&P, royalty, taxes, curing etc.complete but excluding cost of reinforcement and as per direction of the Engineer-in-charge. for 1st Floor |
| 10 | Providing & laying reinforced cement concrete work M-25 with 20 mm size hard granite chips of approved quality including hoisting laying concrete with rigid smooth centering / shuttering, necessary scaffolding, cost & conveyance of materials, labour,T&P, royalty, taxes, curing etc.complete but excluding cost of reinforcement and as per direction of the Engineer-in-charge. for 2nd Floor |
| 11 | Providing & laying reinforced cement concrete work M-25 with 20 mm size hard granite chips of approved quality including hoisting laying concrete with rigid smooth centering / shuttering, necessary scaffolding, cost & conveyance of materials, labour,T&P, royalty, taxes, curing etc.complete but excluding cost of reinforcement and as per direction of the Engineer-in-charge. for Head Room |
| 12 | Supplying and placing in position High yield deformed bars reinforcement including cutting , binding, beding, straightening and tying the grills and placing in position including cost of binding wire 18 to 20 gauge. For Ground Floor |
| 13 | Supplying and placing in position High yield deformed bars reinforcement including cutting , binding, beding, straightening and tying the grills and placing in position including cost of binding wire 18 to 20 gauge. For 1st Floor |
| 14 | Supplying and placing in position High yield deformed bars reinforcement including cutting , binding, beding, straightening and tying the grills and placing in position including cost of binding wire 18 to 20 gauge. For 2nd Floor |
| 15 | Supplying and placing in position High yield deformed bars reinforcement including cutting , binding, beding, straightening and tying the grills and placing in position including cost of binding wire 18 to 20 gauge. For Head Room |
| 16 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For Ground Floor Foundation and Plinth |
| 17 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For Ground Floor Plinth Beam |
| 18 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For Ground Floor Column |
| 19 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For Ground Floor Lift Pit wall |
| 20 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For Ground Floor Roof Beam |
| 21 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For Ground Floor Roof Slab |
| 22 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For Ground Floor Stair Case |
| 23 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For 1st Floor Column |
| 24 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For 1st Floor Lift Pit wall |
| 25 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For 1st Floor Roof Beam |
| 26 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For 1st Floor Roof Slab |
| 27 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For 1st Floor Stair Case |
| 28 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For 2nd Floor Column |
| 29 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For 2nd Floor Lift Pit wall |
| 30 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For 2nd Floor Roof Beam |
| 31 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For 2nd Floor Roof Slab |
| 32 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. For 2nd Floor Stair Case |
| 33 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete for Lift Pit wall |
| 34 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete for Lift Room Column |
| 35 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete for Lift Room Slab |
| 36 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete for Head Room Column |
| 37 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete for Head Room Beam |
| 38 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete for Head Room Slab |
| 39 | Providing Fly ash brick masonary in C.M.(1:6) with fly wash brick of approved quality and size including racking out joints, splays, cutting, circular moulding with cost & conveyance of materials, labour ,T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge In superstructure. Ground Floor |
| 40 | Providing Fly ash brick masonary in C.M.(1:6) with fly wash brick of approved quality and size including racking out joints, splays, cutting, circular moulding with cost & conveyance of materials, labour ,T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge In superstructure. 1st Floor |
| 41 | Providing Fly ash brick masonary in C.M.(1:6) with fly wash brick of approved quality and size including racking out joints, splays, cutting, circular moulding with cost & conveyance of materials, labour ,T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge In superstructure. 2nd Floor |
| 42 | Providing Fly ash brick masonary in C.M.(1:6) with fly wash brick of approved quality and size including racking out joints, splays, cutting, circular moulding with cost & conveyance of materials, labour ,T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge In superstructure. lift Room and Head Room |
| 43 | Providing 12mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. Ground Floor |
| 44 | Providing 12mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. 1st Floor |
| 45 | Providing 12mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. 2nd Floor |
| 46 | Providing 12mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. Lift Room and Head Room |
| 47 | Providing 16mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. ground Floor |
| 48 | Providing 16mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. 1st Floor |
| 49 | Providing 16mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. 2nd Floor |
| 50 | Providing 16mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. Lift Room and Head Room |
| 51 | Providing 6mm thick C.P. in C.M.(1:4) to R.C.C surface including close deep chipping & slurry treatment with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in- charge. Ground Floor |
| 52 | Providing 6mm thick C.P. in C.M.(1:4) to R.C.C surface including close deep chipping & slurry treatment with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in- charge. 1st Floor |
| 53 | Providing 6mm thick C.P. in C.M.(1:4) to R.C.C surface including close deep chipping & slurry treatment with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in- charge. 2nd Floor |
| 54 | Providing 6mm thick C.P. in C.M.(1:4) to R.C.C surface including close deep chipping & slurry treatment with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in- charge. Lift Room and Head Room |
| 55 | Providing & fixing vitrified tiles of premium grade having thickness 8mm to 10mm (600mmx600mm) size coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:3) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. Ground Floor |
| 56 | Providing & fixing vitrified tiles of premium grade having thickness 8mm to 10mm (600mmx600mm) size coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:3) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. Ground Floor Skirting |
| 57 | Providing & fixing vitrified tiles of premium grade having thickness 8mm to 10mm (600mmx600mm) size coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:3) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. 1st Floor |
| 58 | Providing & fixing vitrified tiles of premium grade having thickness 8mm to 10mm (600mmx600mm) size coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:3) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. 1st Floor Skirting |
| 59 | Providing & fixing vitrified tiles of premium grade having thickness 8mm to 10mm (600mmx600mm) size coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:3) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. 2nd Floor |
| 60 | Providing & fixing vitrified tiles of premium grade having thickness 8mm to 10mm (600mmx600mm) size coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:3) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. 2ndt Floor Skirting |
| 61 | Fixing of tiles in dados, skirting and risers of steps on 12 mm thick bed of Cement mortar 1:3 ( 1 Cement :3 sand ) jointed with neat Cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles or stones. Ground Floor |
| 62 | Fixing of tiles in dados, skirting and risers of steps on 12 mm thick bed of Cement mortar 1:3 ( 1 Cement :3 sand ) jointed with neat Cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles or stones. 1st Floor |
| 63 | Fixing of tiles in dados, skirting and risers of steps on 12 mm thick bed of Cement mortar 1:3 ( 1 Cement :3 sand ) jointed with neat Cement slury mixed with pigment to match the shades of the tiles including rubbing and polishing complete including cost of tiles or stones. 2nd Floor |
| 64 | Providing & fixing ceramic tiles of premium grade having thickness 8mm to 10mm coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. Ground Floor |
| 65 | Providing & fixing ceramic tiles of premium grade having thickness 8mm to 10mm coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. 1st Floor |
| 66 | Providing & fixing ceramic tiles of premium grade having thickness 8mm to 10mm coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge.2nd Floor |
| 67 | Providing & fixing ceramic wall tiles of premium grade having thickness 8mm to 10mm coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. Ground Floor |
| 68 | Providing & fixing ceramic wall tiles of premium grade having thickness 8mm to 10mm coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. 1st Floor |
| 69 | Providing & fixing ceramic wall tiles of premium grade having thickness 8mm to 10mm coloured / printed series (Homogeneous) confirming to IS 13756 in floor on 20mm thick bed of cement mortar (1:1) jointed with neat cement slurry mixed with pigment to match the shade etc. complete as per direction of the Engineer-in-charge. 2nd Floor |
| 70 | Finishing walls with water proofing cement paint of approved shade on new work two coats over cement primer to give an even shade including cost of cement paint. Ground Floor |
| 71 | Finishing walls with water proofing cement paint of approved shade on new work two coats over cement primer to give an even shade including cost of cement paint. 1st Floor |
| 72 | Finishing walls with water proofing cement paint of approved shade on new work two coats over cement primer to give an even shade including cost of cement paint. 2nd Floor |
| 73 | Finishing walls with water proofing cement paint of approved shade on new work two coats over cement primer to give an even shade including cost of cement paint. Lift Room and Head Room |
| 74 | Priming one coat with any approved wall primer including all labour etc complete Ground Floor |
| 75 | Priming one coat with any approved wall primer including all labour etc complete 1st Floor |
| 76 | Priming one coat with any approved wall primer including all labour etc complete 2nd Floor |
| 77 | Priming one coat with any approved wall primer including all labour etc complete (Lift Room and Head Room) |
| 78 | Providing two coats of plastic emulsion paint of approved shade on wall surface including cost, conveyance of materials labour, T&P etc. complete as per direction of the Engineer-in-charge. Ground Floor |
| 79 | Providing two coats of plastic emulsion paint of approved shade on wall surface including cost, conveyance of materials labour, T&P etc. complete as per direction of the Engineer-in-charge. 1st Floor |
| 80 | Providing two coats of plastic emulsion paint of approved shade on wall surface including cost, conveyance of materials labour, T&P etc. complete as per direction of the Engineer-in-charge. 2nd Floor |
| 81 | Providing two coats of plastic emulsion paint of approved shade on wall surface including cost, conveyance of materials labour, T&P etc. complete as per direction of the Engineer-in-charge. (Lift Room and Head Room) |
| 82 | Supplying, fitting and fixing of Stainless steel of 304 grade in hand railing using 50mm dia of 2mm thick circular pipe with Balustrade of size 32mm x 32mm x 2mm @ 0.90mtr. C/C 32mm x 32mm x 2mm in 3 rows in stair case as per approved design and specification, buffing, polishing etc with cost,conveyance, taxes of all materials, labour,T&P etc. required for the complete in all respect |
| 83 | Fixing of Aluminium Composit Panel with All Assoseries Fittings 1st floor |
| 84 | Fixing of Aluminium Composit Panel with All Assoseries Fittings 2nd floor |
| 85 | Fiber glass fixed window with all assoseries 1st floor |
| 86 | Fiber glass fixed window with all assoseries 2nd floor |
| 87 | Fixing of Rolling Shutter |
| 88 | Supplying , fitting and fixing of openable UPVC doors with door frame of approved make with 6mm thick glass of approved quality complete with frame, shutters and all fitting and fixtures. |
| 89 | Puja Mandap & Pindi Portion :- Earth work in excavation of foundation of Ordinary soil with initial lift including rough dressing and levelling bed etc. complete as per direction of Engineer in charge. |
| 90 | Filling foundation and plinth with sand well watered and rammed including cost, conveyance of materials, labour T&P, royalty etc. complete as per direction of the Engineer-in-charge. |
| 91 | Providing and laying P.C.C. (1:3:6) with 4cm size h.g. metal of approved quality in foundation / floor including hoisting laying concrete, cost & conveyance of materials, labour ,T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. |
| 92 | Providing & laying reinforced cement concrete work M-25 with 20 mm size hard granite chips of approved quality including hoisting laying concrete with rigid smooth centering / shuttering, necessary scaffolding, cost & conveyance of materials, labour,T&P, royalty, taxes, curing etc.complete but excluding cost of reinforcement and as per direction of the Engineer-in-charge. |
| 93 | Supplying and placing in position High yield deformed bars reinforcement including cutting , binding, beding, straightening and tying the grills and placing in position including cost of binding wire 18 to 20 gauge. |
| 94 | Rigid and smooth centring,shuttering for RCC works including false work and dismantling them after casting including cost of materials complete. Footing F1 for Puja Mandap |
| 95 | Footing F2 for Pindi Area |
| 96 | Column C1 up to N.G.L |
| 97 | Column C2 up to N.G.L |
| 98 | Column C1 up to Roof Level |
| 99 | Column C2 up to Roof Level |
| 100 | Plinth Beam Puja Mandap Long Wall |
| 101 | Short Wall |
| 102 | Pindi Portion Short wall |
| 103 | Long Wall |
| 104 | Pindi Portion Roof Beam Long Wall |
| 105 | Short Wall |
| 106 | Puja Mandap Portion Roof Slab |
| 107 | Pindi Portion Roof Slab |
| 108 | Providing Fly ash brick masonary in C.M.(1:6) with fly wash brick of approved quality and size including racking out joints, splays, cutting, circular moulding with cost & conveyance of materials, labour ,T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge In superstructure. Puja Mandap Long Wall |
| 109 | Short Wall |
| 110 | Pindi Portion Short Wall |
| 111 | Long Wall |
| 112 | Providing 12mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. Puja Mandap Long Wall |
| 113 | Short Wall |
| 114 | Pindi Portion Short Wall |
| 115 | Long Wall |
| 116 | Providing 16mm thick plaster in c.m. (1:6) over brick work including neat cement ponning with all cost finished smooth with cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. Mandap Area Long Wall |
| 117 | Short Wall |
| 118 | Pindi Portion Short Wall |
| 119 | Long Wall |
| 120 | Providing 6mm thick C.P. in C.M.(1:4) to R.C.C surface including close deep chipping & slurry treatment with cost, conveyance of materials labour, T&P required for the work including royalty etc.complete as per direction of the Engineer-in- charge. Puja Mandap Portion Roof Slab |
| 121 | Pindi Portion Roof Slab |
| 122 | Providing & laying 2.5 cm artificial stone flooring with cement concrete (1:2:4) including punning using 12 mm size hard broken granite chips including cost & conveyance of materials, labour, T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. Mandap Area |
| 123 | Pindi Portion Roof Slab |
| 124 | Finishing walls with water proofing cement paint of approved shade on new work two coats over cement primer to give an even shade including cost of cement paint. Mandap Area |
| 125 | Pindi Portion |
| 126 | Providing two coats of plastic emulsion paint of approved shade on wall surface including cost, conveyance of materials labour, T&P etc. complete as per direction of the Engineer-in-charge. Mandap Area |
| 127 | Pindi Portion |
| 128 | Priming one coat with any approved wall primer including all labour etc complete . Mandap Area |
| 129 | Pindi Portion |
| 130 | Fixing of Rolling Shutter |
| 131 | Parking Area Development :- Filling foundation and plinth with sand well watered and rammed including cost, conveyance of materials, labour T&P, royalty etc. complete as per direction of the Engineer-in-charge. |
| 132 | Providing and laying P.C.C. (1:3:6) with 4cm size h.g. metal of approved quality in foundation / floor including hoisting laying concrete, cost & conveyance of materials, labour ,T&P, royalty, taxes, curing etc. complete as per direction of the Engineer-in-charge. |
| 133 | Supplying and fixing of 80mm thick cement concrete interlocking paver block of M-40 grade of approved make, design, colour and size made by Block making machine with proper compaction laid in required pattern etc. complete in all respect conforming to IRC SP - 63:2018. Please Enable Macros to View BoQ information |