| 1 | Interior development such as wooden panelling, partition, office cabin development working |
| 2 | Dismantling and Shifting of existing wooden partition panels & Temporary Exhibition setup as per detailed scope of woks & technical specification of serial No 1 of Annexure H of the NIT |
| 3 | Fabricating, supply and installation of full-height wooden partition walls comprising 75 mm x 50 mm CP teak wood framework in grid formation at 600 mm c/c, finished on both sides with 6 mm thick plywood of Century/Green make conforming to IS:710, BWP grade etc as per detailed technical specification & scope of woks of serial No 2 of Annexure H of the NIT |
| 4 | Fabricating, supply and installation of semi-height wooden partition walls consisting of a framework of 50 mm x 50 mm (horizontal) and 75mm x 75mm (vertical) CP teak wood, arranged in a grid pattern of 600x500 mm, finished on both sides with 6 mm thick plywood of Century/Green make conforming to IS:710, BWP grade etc as per detailed technical specification & scope of woks of serial No 3 of Annexure H of the NIT |
| 5 | Supply and fixing of 8mm toughened glass window panes in full-height wooden partition walls, as per approved design and dimensions, complete with all necessary fittings, including wooden moulded beads on both sides of the glass, fixtures, and all requisite consumables under as per detailed technical specification & scope of woks of serial No 4 of Annexure H of the NIT |
| 6 | Fabricating, supply and fixing of full-height wall-mounted wooden cabinet/storage units at designated locations, as per approved design and drawings, with 50mm x 50mm (verticle) and 50mm x 25mm (horizontal) CP teak wood frame in 600 mm c/c grid formation on walls, finished with 9 mm thick plywood on wall side, 12 mm thick plywood on remaining sides, and 19 mm thick plywood on shutters/doors, of Century/Green make conforming to IS:710, BWP grade as per detailed technical specification & scope of woks of serial No 5 of Annexure H of the NIT |
| 7 | Fabrication, supply and fixing in position MS powder-coated collapsible gate for the front opening of the goods lift, including all structural members, supporting frame, top and bottom rail/track system, guide arrangement, locking device, handles, rollers, stoppers, anchor fasteners, fixing hardware and all accessories required for proper and complete installation, as per attached design and approved drawings as per detailed technical specification & scope of woks of serial No 6 of Annexure H of the NIT |
| 8 | Fabrication, supply and fixing in position the teak wood door frame with side beadings and wooden plywood doors of size 2000mm x 1200mm x 32mm approx. as per design & drawings and requirement inluding door lock with key with both side handles, foot stoper with rubber cushion, suitable hydraulic door closer (make- Godrej), hinges, door frame with all accessories, and consumables. All the doors must be installed, fixed and finished on a teak wood door frame with side beading, as per requirement as per detailed technical specification & scope of woks of serial No 7 of Annexure H of the NIT |
| 9 | Fabrication, supply and fixing in position the wooden plywood doors of size 2000mm x 1000mm x 32mm approx. as per design & drawings and requirement inluding door lock with key with both side handles, foot stoper with rubber cushion, suitable hydraulic door closer (make- Godrej), hinges, door frame with all accessories, and consumables. All the doors must be installed, fixed and finished on a teak wood door frame with side beading, as per requirement as per requirement as per detailed technical specification & scope of woks of serial No 8 of Annexure H of the NIT |
| 10 | Supply and installation of high-performance, best quality Stone Polymer Composite (SPC) flooring sheets. The SPC flooring material shall be homogeneous in composition, with an overall thickness ranging between 4.0 mm to 4.5 mm, incorporating a minimum 2.0 mm high-density foam underlayer (IXPE or EVA) for effective shock absorption, walking comfort, and acoustic insulation. The surface layer shall include a wear-resistant topcoat of not less than 0.7 mm thickness as per requirement as per detailed technical specification & scope of woks of serial No 9 of Annexure H of the NIT |
| 11 | Painting and finishing of all exposed walls and ceiling surfaces of 3rd and 5th floor of NCSM building, using premium-grade, low-VOC emulsion paint (with VOC content less than 50 grams/liter) from approved colour/shade and brands such as Asian Paints Royale, Berger Silk, Nerolac Impressions. The paint system shall provide a uniform, matte or eggshell finish etc as per requirement as per detailed technical specification & scope of woks of serial No 10 of Annexure H of the NIT |
| 12 | Supply and installation of vertical flip-type curtains to cover the glass windows (size: 1200mm x 1200mm approx.) of partition walls at the 3rd and 5th floors of the NCSM building, as per the direction and advice. The curtain shall be made of 100% high-quality block-out fabric (coated polyester/cotton) in an approved color and shade. as per detailed technical specification & scope of woks of serial No 11 of Annexure H of the NIT |
| 13 | Supply and installation of vertical flip-type curtains to cover the glass windows (size: 900mm x 600mm approx.) of partition walls at the 3rd and 5th floors of the NCSM building, as per the direction and advice. The curtain shall be made of 100% high-quality block-out fabric (coated polyester/cotton) in an approved color and shade as per detailed technical specification & scope of woks of serial No 12 of Annexure H of the NIT |
| 14 | Supply and installation of roller blind curtains with chain mechanisms to cover the wall windows and doors on the main wall side of the buildings at the 3rd and 5th-floor new partition halls/rooms, as per directions and specifications. The curtains must be fully opaque (block-out) with an approved color/shade, made from high-quality, flame-retardant fabric (coated polyester/cotton) as per detailed technical specification & scope of woks of serial No 13 of Annexure H of the NIT |
| 15 | Fabrication, supply and installation of file storage Rack (Type-1) units as per attched detailed drawings and design using 50mm x 50mm (verticle) and 50mm x 25mm (horizontal) CP teak wood frame grid formation, finished with 9 mm thick plywood on wall side, 12 mm thick plywood on remaining sides, and 6 mm thick plywood on shutters/doors, of Century/Green make conforming to IS:710, BWP grade as per detailed technical specification & scope of woks of serial No 14 of Annexure H of the NIT |
| 16 | Fabrication, supply and installation of storage Rack units (Type-2) at ground floor mechanical workshop (curator's cabin) as per attched detailed drawings and design using 50mm x 50mm (verticle) and 50mm x 25mm (horizontal) CP teak wood frame grid, finished with 9 mm thick plywood on wall side, 12 mm thick plywood on remaining sides, and 19 mm thick plywood on doors of Century/Green make conforming to IS:710, BWP grade as per detailed technical specification & scope of woks of serial No 15 of Annexure H of the NIT |
| 17 | Fabrication, supply and installation of Office Tables with storage drawer box units, sliding tray for key board and circular opening/cutout for passing of electrical cables at marked positions in the drawings. The tables must be fabricated using Century/Green make plywoods conforming to IS:710, BWP grade as per detailed technical specification & scope of woks of serial No 16 of Annexure H of the NIT |
| 18 | Supply, Installation, Testing and Comissioning of Inverter Split Air Conditioning systems (2 Ton each) at designated spaces in NCSM building as per the advise and instructions of the Officer in-charge. The Machine with all its integral components must be supplied strictly as per the attached specification sheet of Annexure H of the NIT Please Enable Macros to View BoQ information |