| 1 | Dismantling, Shifting & Refurbishment of the Solar Water Heating System from Old Nurses Building to UHC Dharavi Building and Supplying Water Purification System with other works at LTMG Hospital, Sion, Mumbai |
| 2 | Lowering of the existing Solar Water Heating System from the terrace at the old location, loading into a goods vehicle, shifting to the new location, unloading, and lifting to the terrace of the new location as per TS 1. |
| 3 | Fabrication work for providing and installing an MS platform to support the hot water storage tank of the Solar Water Heating System at the terrace of the new location, using available existing materials as per TS 2. |
| 4 | Supply and fixing of threaded pipe flange for solar collector connection as per TS 3. |
| 5 | Supply and fixing of blind (dummy) flange for solar collector piping as per TS 4. |
| 6 | Supply and fixing of suitable size ring (open-hole) gasket for solar collector flange connection as per TS 5. |
| 7 | Supply and fixing of blind (dummy) gasket for solar collector flange connection as per TS 6. |
| 8 | Supply and fixing of nut and bolt sets for solar collector flange and gasket connections as TS 7. |
| 9 | Supply and fixing of Rock Mineral Wool (Stone Wool) thermal insulation with aluminium cladding for the hot water tank, complete as per TS 8. |
| 10 | Supply and fixing of auxiliary electric backup heater coil for the auxiliary backup hot water tank, complete as per TS 9. |
| 11 | Servicing, overhauling, and replacement of water seal of the circulation pump, complete as per TS 10. |
| 12 | Supply and fixing of suitable size Y-type strainer with required plumbing fittings, complete as per TS 11. |
| 13 | Supply and fixing of RTD (Pt-100) temperature sensor with required plumbing fittings as per TS 12. |
| 14 | Supply and fixing of air vent valve along with required plumbing pipe tee as per TS 13. Size: 15 MM |
| 15 | Supply and fixing of screwed type gate valve with required plumbing fittings as per TS 14. Size: 15 MM |
| 16 | Supply and fixing of screwed type gate valve with required plumbing fittings as per TS 15. Size: 25 MM |
| 17 | Supply and fixing of screwed type gate valve with required plumbing fittings as per TS 16. Size: 40 MM |
| 18 | Supply and fixing of ball float valve with required plumbing fittings as per TS 17. Size: 25 MM |
| 19 | Supply and fixing of screwed type non-return valve with required plumbing fittings as per TS 18.Size: 25 MM |
| 20 | Supply and fixing of C.P. brass bib cock as per TS 19. Size: 15 MM |
| 21 | Supply and fixing proper plumbing connections to securely install the bib cock using G.I. elbow, barrel nipple, coupling, etc. as per TS 20.Size: 15 MM |
| 22 | Supply and fixing of hot water piping for the Solar Water Heating System with required fittings as per TS 21. |
| 23 | Dismantling and removal of the Solar Water Heating System at terrace level as per TS 22. |
| 24 | Re-installation of the Solar Water Heating System at terrace level as per TS 23. |
| 25 | Painting of collector support legs, pump housing, hot water tank stand, and I-beam structure as per TS 24. |
| 26 | Casting of cement concrete pedestal for solar collector support legs as per TS 25.Size: 100 MM x 100 MM x 100 MM |
| 27 | Supply of Domestic Storage type UV+UF Water Purifier as per TS 26. |
| 28 | Work of Installation, Testing and Commissioning of Domestic Storage type UV + UF Water Purifier as per TS 27. |
| 29 | Supply of Domestic Online type UV Water Purifier as per TS 28. |
| 30 | Work of Installation, Testing and Commissioning of Domestic Online type UV Water Purifier as per TS 29. |
| 31 | Annual Comprehensive Maintenance Contract of Domestic Storage type UV + UF Water Purifier & Online type Ultra Violet (UV) Water Purifier for First Year after the date of Expiry of DLP of One Year from the Supply and Installation is made as per TS 30 & TS 31. |
| 32 | Annual Comprehensive Maintenance Contract of Domestic Storage type UV + UF Water Purifier & Online type Ultra Violet (UV) Water Purifier for Second Year after the date of Expiry of DLP of One Year from the Supply and Installation is made as per TS 30 & TS 31. |
| 33 | Supply & Replacement of RO Control Panel for Central Reverse Osmosis (RO) Water Purification Plant at New AKD Dept. as per TS 32. Please Enable Macros to View BoQ information |