| 1 | Clearing and grubbing land in canal slope work including uprooting rank vegetation, grass, bushes, shrubs, sapling and trees girth upto 300mm, removal of stumps of trees cut earlier and disposal of unserviceable materials and stacking of serviceable materials to be used or auctioned, upto a lead of 1000m including removal and disposal of top organic soil not exceeding 150mm in thick as per direction of Engineer in charge. |
| 2 | Triangular or square section of 0.15m trench cutting for alignment and demarcation purpose of dug belling 10 cm to 15 cm as per Direction of Engineer in charge. |
| 3 | Excavation, loading, unloading and carriage by mechanical means of all kinds of soil, including stoney earth, gravel and moorum etc interspread with boulders upto 1/2 cum size with all lifts and delifts including trimming of slopes and bed to design section and depositing the excavated materials away from work site as per the specification and as directed by the Engineer-in-charge within an initial lead of 1km from the place of excavation complete. |
| 4 | Earth work in filling in any approved type of soil from approved borrow area by mechanical means loading into and transportation by mechanical means and unloading the soil within initial lead of 5 km on properly prepared and scientifically approved surface including spreading and leveling the earth in 22.5cm layers to make ready for watering earth work up to OMC condition and compaction by V.R.R. in embankment for all heights including construction, maintenance, watering lighting of haul road and borrow area and running charges of all machineries, cess etc. complete as per the direction of Engineer-in-charge. |
| 5 | Watering earth work up to OMC condition and compaction by sheep foot roller and dozers in layers not exceeding 22.50 cm to 95% dry density including hire and running charges of all machineries complete as per direction of Engineer-in-charge. ( Measurement to be taken on the finished compacted section of the fill under OMC condition) (Item No.2,P-12,A/R-06 Works Deptt.) |
| 6 | Earth work excavation of foundation canal structure in hard soil or Gravelly soil within 50m. Initial lead over 1 extra lead and 1.5m initial lift including rough dressing and levelling the bed and depositing the excaveted earth away from site and as per the direction of the Engineer-in-charge. |
| 7 | Filling in foundation & plinth with sand watered and rammed including cost,conveyance,royalty & cess etc.complete as per direction of the Engineer-in-charge. |
| 8 | Plain Cement Concrete grade M-15 using 40mm and down graded black hard granite crusher broken chips using cement, coarse and fine aggregates of approved quality, mixed in a concrete mixer of not less than 0.2 cum capacity / appropriate weigh batcher using approved mix design, laid in approved fixed side formwork, , spreading the concrete with shovels, rakes, compacted using needle / screed / plate vibrator and finished in continuous operation including provision of construction joints, curing of concrete for 14-days, as per the direction of Engineer in Charge. |
| 9 | RCC/Plain Cement Concrete grade M-20 using 20mm and down graded black hard granite crusher broken chips using cement, coarse and fine aggregates of approved quality, mixed in a concrete mixer of not less than 0.2 cum capacity / appropriate weigh batcher using approved mix design, laid in approved fixed side formwork, laying and fixing of 125 micron thick polythene film (in bed), spreading the concrete with shovels, rakes, compacted using needle / screed / plate vibrator and finished in continuous operation including provision of construction joints, curing of concrete for 14-days, as per the direction of Engineer in Charge. |
| 10 | RCC/Plain Cement Concrete grade M-25 using 20mm and down graded black hard granite crusher broken chips using cement, coarse and fine aggregates of approved quality, mixed in a concrete mixer of not less than 0.2 cum capacity / appropriate weigh batcher using approved mix design, laid in approved fixed side formwork, laying and fixing of 125 micron thick polythene film (in bed), spreading the concrete with shovels, rakes, compacted using needle / screed / plate vibrator and finished in continuous operation including provision of construction joints, curing of concrete for 14-days, as per the direction of Engineer in Charge. |
| 11 | Supplying ,fitting and placing uncoated HYSD bar reinforcement includung labour for cutting, bending to site, tying and placing in position etc.Complete as per drawing and technical specification with carriage and cess etc complete and as per direction of Engineer-in -charge. |
| 12 | Formwork for concrete in canal structure with F1 finish using steel shutter plates of approved specification for surfaces not prominently or permanently exposed to public view including supply of all materials, T&P, labour and transportation of shuttering materials and dismantling and finishing complete as per direction of Engineer-in-charge. |
| 13 | Rough stone dry packing in aprons and revetments with H.G.broken stones,30cm and above size filling the interstices with spalls small stones including cost,conveyance,royalty and all taxes etc.complete as per direction of Engineer-In-Charge. |
| 14 | Laying and fixing in position RCC hume pipes NP3 including cost,carriage of materials with all taxes etc complete and as per direction of Engineer- In-Charge.a) 600mm dia NP3 |
| 15 | Filling in foundation and plinth with excavated materials including watering and ramming etc.complete in all respect as per the direction of the Engineer-In-Charge. |
| 16 | Fine dressing and turfing the slopes of the dam / dyke / canal embankment with compacted dub grass with initial lift and lead including all labour T&P required for the work in all respect as per the direction of the Engineer in charge. Please Enable Macros to View BoQ information |