|
| 1 | Demolishing cement concrete including disposal of material within 50 metres lead as per direction of Engineer-in-chargeNominal concrete 1:3:6 or richer mix (i/c equivalent designmix) |
| 2 | Dismantling doors, windows and clerestory windows (steel or wood) shutter including chowkhats, architrave, hold fasts etc. complete and stacking within 50 metres lead:.Of area beyond 3 sqm |
| 3 | Dismantling steel work in built up sections in angles, tees, flats and channels including all gusset plates, bolts, nuts, cutting rivets, welding etc, including dismembering and stacking within 50 metres lead. |
| 4 | Dismantling roofing including ridges, hips, valleys and gutters etc., and stacking the material within 50 metres lead of : |
| 5 | Earthwork in excavation by manual means up to a depth of 2m below the existing ground level for foundation trenches of foundations, footings of column/ walls, retaining walls, septic tank etc. including bailing out water where necessary andremoval Of surplus earth with all lead and lifts as directed and specified for the following classification of soils. All kinds of soil (ordinary soil/ hard soil/ dense soil) |
| 6 | Earthwork in filling (excluding rock) in trenches, plinth, sides of foundation otc in layers not exceeding 20 cm thick including breaking Of clods, consolidating each layer by ramming and watering, lead up to 50 in and lift up to 1.5 in1 :4 (1 cement: 4 coarse sand)With available excavated earth |
| 7 | Providing soling with stone/ best quality picked jhama brick, sand packed and laid to level and in panel after preparing thesubgrade as directed including all labour and materials and ifnecessary dewatering, completeStone Soling100mm |
| 8 | Centering and shuttering including strutting, proppingetc. and removal of form for all heights complcte and asdirected by Engineer in charge.Foundations, footings, bases of columns, etc. for massconcrete (using steel). |
| 9 | Plain cement concrete works in foundation bed for footingsteps, walls, brick works etc below plinth level as directedand specified including dewatering if necessary, and curing complete (shuttering where necessary shall be measured andpaid separately).1 :3:6 (1 Cement: 3 coarse sand: 6 graded stone aggregate 20 mm nominalsize) |
| 10 | 12 mm cement plaster of mix:1 :4 (1 cement: 4 fine sand) |
| 11 | Re-Fitting/welding of steel work in built up tubular (round, square or rectangularhollow tubes etc.) trusses etc„ including cutting, hoisting,fixing in position and applying a priming coat of approved steel primer, including welding and bolted with special shapedwashers etc. complete. (with available steel materials) |
| 12 | Re- fixing of precoatedgalvanised iron profile sheets 0.50 mm..................excluding the cost of purlins. rafters and trusses and including cutting to size and shape wherever required.(with available steel materials) Please Enable Macros to View BoQ information |