| 1 | Local shifting of Pantoon within 500m with the help of crain |
| 2 | Cartage of Pantoon by Truck/Tailor from Prayagraj (Allahabad) to Chauki Ghat site including loading unloading with the help of crane, labour, T&P etc complete. as per direction of E/I |
| 3 | Shifting of Pantoon by Tailor from unlaoding place to Prayagraj (Allahabad) site Chauki to Ghat site including disconnecting the pantoon lying in dry bed / shallow water, rolling and haulage up to river bank with the help of crane labour T&P etc complete. as per direction of E/I |
| 4 | Cartage of R.S. Joist 5.20 mtr long fromPrayagraj (Allahabad) site to Chauki Ghat (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. |
| 5 | Cartage of sal sliper / Sal edging fromPrayagraj (Allahabad) site to Chauki Ghat (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. |
| 6 | Dragging the Pantoon from dry bed to the river water and making pair and anchoring them in the down stream side of Pantoon bridge |
| 7 | Carrying of Pantoon pair from the place of anchoring (down stream side of bridge) to the alignment of bridge in water and fixing the same with other Pantoon pair and refixing the same in bridge alignment. |
| 8 | Sinking of Pantoons to obtain the proper gradient as laid in dry bed /shallow water in the alignment of Pantoon bridge as per direction of E/I |
| 9 | Carriage of spliced R.S. joist (5.00m long) including loading, unloading and cost of carriage from store to Chauki Ghat as per direction of E/I |
| 10 | Cartage of chequared plate including loading, unloading and cost of carriage from store to Chauki Ghat store as per direction of E/I |
| 11 | Cartage of Railing post |
| 12 | Two coat painting of railing post including paint and labour etc. |
| 13 | Carriage of sal sleeper including loading, unloading and cost of carriage from store to Chauki Ghat store as per direction of E/I |
| 14 | Carriage of sal edging including loading, unloading and cost of carriage from store to Chauki Ghat store as per direction of E/I |
| 15 | Supply of materialsSupply of Nylone rope of Garware brand of 28mm dia including cost of material cartage up to site and also including all taxes (as per s/o No 417 dt. 13.10.08 as approved by S.E. Gorakhpur circle) |
| 16 | Supply of ordinary Nylone rope of Garware brand of 32mm dia including cost of material cartage up to site and also including all taxes (as per s/o No 420 dt. 13.10.08 as approved by S.E. Gorakhpur circle) |
| 17 | Supply of plastic empty cement bags of good quality |
| 18 | In empty cement bags of good condition (plastic) filed with local sand including filling stitching, stacking at site of work |
| 19 | Supply of following materials including cartage and all local taxes etc complete.Supply of Narial Rope |
| 20 | Supply of Calcutta Sutli |
| 21 | Supply of M.S. Washer of 30 mm x 20 mm |
| 22 | Supply of Nat Bolt 30 x 300 mm size |
| 23 | Supply of Nat Bolt 30 x 150 mm size |
| 24 | Supply of Nat Bolt 16 x 300 mm size |
| 25 | Supply of U-clamp with nut cartage & all local taxes included |
| 26 | Supply of Mallahi Nail of 15 cm to 30 cm long |
| 27 | Supply of eucliptus balli 150 mm dia |
| 28 | Supply of eucliptus balli 100 mm dia |
| 29 | Supply of wooden crate of equiliptus ballies 2.80 x 1.80 x 1.80 m size made of 8 cum ballie including cost of labour, T & P and material |
| 30 | Supply of 10mm dia wire rope including cartage and all local taxes etc. complete |
| 31 | Supply of 20mm dia wire rope including cartage and all local taxes etc. complete |
| 32 | Supply of large bamboo of 7.50 cm dia including cartage and all local taxes etc. complete |
| 33 | Supply of large bamboo of 5.00 cm dia including cartage and all local taxes etc. complete |
| 34 | Supply of railing wire clamp including cartage and all local taxes etc. complete |
| 35 | Supply of wire nail including cartage and all local taxes etc. complete |
| 36 | Supply of sign board of size 4' x 3' including cartage and all local taxes etc. complete |
| 37 | Lettering and painting of sign board of size 4' x 3' |
| 38 | Making bariar on both side of Pantoon bridge with ballies (labour only) |
| 39 | Fixing of railing wire through hole of railing post and hole of vertical post and making wire stay of each rows and tightened with the help of stay clamps including making of hole in vertical ballies post (labour only) |
| 40 | Fixing of railing post in position including making 16mm dia 25cm deep hole with the help of generator and drill machine over sleeper and all sal edging before fixing the railing post with help of 300x16 mm size nut and bolts at 1.25mtr c/c including |
| 41 | Bundaling with the help of 10cm horizontal ballies and 15cm vertical ballies @ 50cm C/C ballies and fixing below 1.00 to 3.00 m of water level and placing sand filled bag up to 30cm above |
| 42 | Supply of wooden anchor of equiliptus ballies 2.80 x 1.80 x 1.80 m size made of 8 cum ballie including cost of labour, T & P and material |
| 43 | Clamping of chequred with U-clamps |
| 44 | Cartage of wooden anchor from store to bridge head including loading, unloading and cost of carriage from store and placing on the as per direction of E/I |
| 45 | Making stay on both side of Pantoon bridge with the help of 20mm /10mm wire rope (labour only) |
| 46 | Hire charges of boat with mallah with large boat |
| 47 | Watch and ward of materials at Chauki ghat (Chaukaidar) |
| 48 | Earth work in embankment by carted earth (Loam,Clay or sand) excavation to be in the form of pit not exceeding 50 cm in depth and earth work in embankment to be in 20 cm layers, including the ramming & dressing the surface to required levels and slops and also including 1.50 meter lift and 30meter lead. the earth from cutting to be used in making embankment or to be deposited as spoil bank within 30m distance as direction by the E/I |
| 49 | Construction of embankment with approved material obtained from borrow pits with all lifts , transporting to site, spreading, grading to required slope and compacting to meet requirement of table 300-1 & 330-2 with a lead upto 1000 m as per Technical specification clause 301.5. . |
| 50 | Maintenance of Pantoon bridge |
| 51 | Brick soling with straight over burnt bricks laid on edge and dry including preparation of subgrade to prescribed camber and including supply of brick filling joibts with local earth spreading a blinding coat of 1cm. (3/8\\") depth of local earth of P.I.5 to 7 or sand over the entire surface & including labour, T & P etc. required for proper completion of the work.as per S.I. no. 762B |
| 52 | Painting with two coats loccolite black paint of M/s British Paint on old iron work including sand papering, rubbing and cleaning the surface and supply of labour and tools and plants required for the proper completion of the work. as per S.I. No. 641+642 |
| 53 | Supply and laying of local sand including cost of material, loading, unloading and its cartage up to site of work |
| 54 | Construction of site store & chaukidar hut |
| 55 | Cartage of chequared plate fromPrayagraj (Allahabad) site to gauri Ghat (store) including cost of loading, unloading, stacking and its cartage up to site including cost of all labour, T&P etc required for proper completion of the work. |
| 56 | Dismantling of Pantoon bridgeOpening of 'U' clamps from chequered plate |
| 57 | Extraction of hard steel railing wire of 10mm dia (as per Allahabad Schedule no 4/6d) |
| 58 | Taking out of Euclipts ballies from approach (as per Allahabad Schedule no 4/6d) |
| 59 | Dismantling and carriage of sal edges (as per Allahabad Schedule no 6/6d) |
| 60 | Dismantling and carriage of sal sleepers (as per Allahabad Schedule no 7/6d |
| 61 | Dismantling and carriage of Railing post (as per Allahabad Schedule no 5/6d) |
| 62 | Dismantling and carriage of R.S. Joist (as per Allahabad Schedule no 8/6d |
| 63 | Carriage of different material like nails, ropes, nuts and bolts etc from bridge head to store include loading, unloading and carriage as per direction of E/I |
| 64 | During Carrying the Pantoon pair place of anchoring (down stream side of bridge)in waterand then tocross the dry bed/shallow water on the way upto alignment disconnecting the pantoon pair and rolling the pantoon and fixin in the alignment. |
| 65 | Anchoring of Pantoon pairs at Gauri ghat side in D/S dide of river (as per Allahabad Schedule no 3/6) |
| 66 | Dismantling and carriage of chequered plates from bridge deck and approach road (as per Allahabad Schedule no 2/6d) Please Enable Macros to View BoQ information |