| 1 | Dismantling, loading, unloading, transportation, shifting of old Silent type DG Set of capacity 100 KVA, silent canopy, Silencer, exhaust pipe, panels , power cables, battery chargers, batteries, diesel tanks and all other accessories i/c ducting, disconnection of Supply cable i/c shifting from RSU Lajpat Nagar 2 to TE Bldg. Okhla (and Re-assembling the same i/c canopy at new Site) as per the directions of Engineer In Charge etc complete as required. |
| 2 | Dismantling, loading, unloading, transportation and shifting from RSU Lajpat Nagar 2 to TE Bldg. Okhla of following electrical equipments etc. complete as required.a) 94.5 KVA AVR with AVR Bypass panel |
| 3 | b) LT Panel |
| 4 | c) Capacitor panel |
| 5 | d) Power Room panel |
| 6 | e)7.5 TR Ductable AC units complete with indoor/ outdoor units |
| 7 | f) 250 A Main Fuse Box |
| 8 | g) AC Panel |
| 9 | h)Focus lights/Emergency lights |
| 10 | i) MCCB 100/200/250A with MCCB Box |
| 11 | j) Fire detection and alarm system with Fire panels, detectors, RI, MCP and hooters, fire cylinders ,buckets and all accessories |
| 12 | k) various sizes copper/ aluminium conductor electrical cables |
| 13 | l) Cable runway trays |
| 14 | m) Air circulator/Exhaust Fan/wall Fan/Ceiling Fan/AC Fresh air fan |
| 15 | n) 1x40 W/ 2 x 40 W Tube light fittings/ Halogen light / Bulk head/ CFL fittings (approx 40 Nos.) |
| 16 | o) 100/200/250/400 Amp. Changeover switch with adopter box |
| 17 | p) AC copper pipes |
| 18 | q) TPDB/SPDB 8 way/12 way with MCBs/Isolators and adopter boxes |
| 19 | r)Power Protection Box/Alarm Box/contactor box |
| 20 | Dismentalling of burnt out/unserviceable material and shifting to RSU Lajpat Nagar 2 i.e. AC Drain pipes, AC condenser frames , water motor, Air curtain,GI earth strip, single core copper wiring, conduit pipes, MS boxes, power point boxes, computer point boxes, switches, sockets, old tube lights, slotted angle pieces,fitting louvers, GI duct pieces, duct insulation,angle iron supports i/c removing from wall/surface etc. as per the directions of Engineer-in-charge. Please Enable Macros to View BoQ information |