| 1 | Excavation in foundation, trenches etc.in earth work in all kinds of soil such as ,Pick work ,Jumper work blasting work in hard /soft rocks chiseling /wedging out of hard /soft rock including dewatering in saturated soil up to all leads and lifts staking the excavated soil materials upto all leads and lifts clear from the edge of excavation and then returning the stacked excavated soil in all layers when required into plinths sides of foundation etc consolidating each deposited layer by ramming and watering and then disposing of all surplus excavated soil as per direction of Engineer in charge . |
| 2 | Providing electric welding ( Triple layer ) at site with diesel engine Generator welding set required for repair of various dia G.I pipes of distribution system at different RDs to stop the leakage problem including cost of carriage of generator set at site with in all leads and lifts and as per entire satisfaction of Engineer in Charge . |
| 3 | Providing & Fixing of GM Peet valve of various dia heavy duty ISI marked complete fixing at site complete in all respects within all leads and lifts as per direction and satisfaction of Engineer-in-Charge. |
| 4 | 50 mm dia ( L) |
| 5 | 32 mm dia (M) |
| 6 | Providing & Fixing of GM union of various dia heavy duty ISI marked complete fixing at site complete in all respects within all leads and lifts as per direction and satisfaction of Engineer-in-Charge. |
| 7 | 50 mm dia |
| 8 | 32 mm dia |
| 9 | Providing and Laying cement concrete 1:3:6 ( 1 cement : 3 sand : 6 graded stone agg. 20mm nominal size ) and curing complete excluding the cost of form work in foundation and plinth complete in all respects with in all leads and lifts as per the satisfaction of the engineer in charge . |
| 10 | Brick work using common burnt clay building bricks of approved quality in super structure in cement mortar 1:6 ( 1 cement : 6 sand ) above plinth level upto floor two level ( 2nd class bricks ) within all leads and lifts as per direction of Engineer in charge . |
| 11 | 20mm thick cement plaster in two coat on rough side of bricks / stone masonry walls & interior plastering upto floor two level including internal angle chamber or rounded angles not exceeding 80mm in girth and finished even and smooth in cement mortar 1:6( 1 cement : 6 sand) complete in all respect within all leads and lifts as per direction of Engineer in Charge . |
| 12 | Steel work welded with built up section trusses and framed work including cutting hoisting fixing in position and applying priming coat of red lead paint in beams , joints channel angles tees flats with connection plates or angle beams,cleats as in main and cross hip and Jack rafters purlins connected to common rafters and the like within all leads and lifts as per the satisfaction of the Engineer in Charge . |
| 13 | Providing and fixing Cast iron double flanged sulice valve of Kirloskar /KSB / Kilburn //BHEL/leader make of following dia nd class PN.- 1.6 capable of with standing nominal seat pressure of 16.00 Kg/cm2 ( as per IS- 780-1984 latest with upto date ammendments if any) complete in all respect as per direction and satisfaction of Engineer in charge . |
| 14 | 100 mm dia. |
| 15 | Providing and fixing of M.S Flanges Table -17 following dia GI pipe including cost of welding nuts and bolts rubbersheet complete in all respect and lifts and per direction and satisfaction of engineer in Charge . |
| 16 | 100 mm dia |
| 17 | Providing and fixing of Kirloskar / kilburn /IVC /Fouress /Gled /BHEL /Leader kartar make cast iron Double flanged non return valve of class ASA 150 as per relavant IS Standards withstand nominal seat pressure 20.00 Kg/cm sqr .Conforming to IS BS: 1868 API-600 ( latest with up to date ammendements if any) complete in all respects within all leads and lifts as per direction and satisfaction of Engineer in Charge having following nominal diameters . |
| 18 | 100 mm dia . |
| 19 | Removal of Slips/Silt / Sand in all kind of soils ( including saturated soils , but excluding the boulders and rocky portion requiring blasting up to a distance of 20 mtrs disposing off unserviceable material stacking serviceable material and neatly dressing the surface including deployment of generator and raw water pump for removal of water from the percolation well / gallery in order to remove the deposited material complete in all respects within all leads and lift as per direction and satisfaction of Engineer-in-charge.Check Dam. |
| 20 | Cleaning all type of concrete /masonary surface by throughly brooming with wire brush & surface grinder to remove the plaster peeling algae dust dirt and all foreingn material consolidated on surface complete in all respect. |
| 21 | Water proofing treatment on water tank on specified or marked area where heavy leakages are noticed such as bottom of tank and horizontal joints of RCC pannels of walls including cost of cutting holes in the concrete with chieseling hammering and fixing nozzles for injection grouting of water proof compound of requted and approval brand such as perma Grout or equivalent make at one foot interval to block voids or cappilaries to arrest complete leakages of RCC water retaining structures as per the direction and satisfaction of the Engineer in Charge . Please Enable Macros to View BoQ information |