| 1 | Dismantling of flexible pavements and disposal of dismantled materials upto a lead of 100 m, stacking serviceable and unserviceable materials separately as per Technical Specification Clause 202, By Manual Means (Bituminous Courses) |
| 2 | Excavation in foundation in Ordinary Soil (Loam Clay or Sand) Including Lift upto 1.50mtr. And Lead upto 30 mtr and including filling watering and ramming of excavated earth in to the trench or into the space between the building and sites of foundation trunches or into the plinth and removal and disposal of surplus earht edge directed by the Engineer in Charge of 30 mtr from the foundation trunches. as per Sl.No. 251 (Ch-4) |
| 3 | Concrete with 4Cm. Gauge brick ballast and fine sand of 1.25 fineness modulous and cement in proportion and cement in proportion of 12:6:1 in foundation and under floors, including supply of all material, labour and tools and plants etc. as per Sl.No. 273 |
| 4 | First class brick work in 1:4 cement and coarse sand of 2.25 FM Mortar in foundation plinth including supply of all materials labour and T&P etc. required for proper completion of work as per Sl.No. 305 NS Ch-6) |
| 5 | Construction of Granular Sub-base by providing Well graded material, Spreading in uniform Layers With Motor Grader on prepared surface,Mixing by mix in place method with rotavator at OMC , and compacting with smooth wheel roller to achieve the desired density, compacting as per technical specification clause 401. |
| 6 | Construction of Cement concrete pavement, Thickness as per design, over a prepared subbasewith 43 grade cement or any other type as per Clause 1501.2.2 M 30 (Grade) coarse and fine aggregates conforming to IS:383, maximum size of coarse aggregate no exceeding 25mm, mixed in a concrete mixer of not less that 0.2 cum capacity and appropriate weigh batcher uusing approved mix design , laid in approved fixed side formwork ( Steel Channel, Laying and fixing of 125 micron thiock polythene film , wedges, steel plates including levelling th formwork as per Drawing ), Spreading the concrete with shovels, rakes, compacted using needle, screed and plate vibrators and fininshedin continous operation including provision of contraction and expansion, construction joints , applying debonding strips, primer, sealant , near approaches to bridge/culvert and construction joints, admixture as approved, curing of concrete slabs for 14 days. curing compound ( Where specified ) and water finishing to lines and grade as per drawing and Technical specification Clause 1501. PCC Grade M-30 thickness 150mm |
| 7 | 12 mm cement plaster with cement mortar in proportion of 1:4 cement & coarse sand of single coat for interior plastering upto floor two level including internal rounded angles chamfers and rounded angles not exceeding 80 mm in girth and finished even and smooth etc. as per Sl.No. 2 (13.4) Ch- 13 |
| 8 | Cement concrete with 2cm guage approved stone grit approved coarse sand, cement in the proportion of 4:2:1 I/C supply of all material T&P etc. required for proper completion of work. As per Sl.No. 279 (a) Ch-5 |
| 9 | R.C.C. work with cement approved coarse sand and 2cm guage approved stone ballast in the proportion of 1:1.5:3 in Lintels of Doors and WIndows Excluding supply of reinforcement and its binding but including its fixing and binding the same with 24 BWGGI binding wire and including necessary shuttering and centering etc. and also including supply of all material labour and T&P etc. require for proper completion of the work binding wire cost beaing including in the item but for Slabs as per Sl.No. 284 NS Ch-5 |
| 10 | Mild Steel or Iron in plain work such as Reinforced Concrete or Reinforcement brick work (when not included in an over all rates) wrought to required shape as necessary including benefit for proper completion of work and including supply of all steel and wastage and overlapping and hooks etc. as per Sl.No. 504 Ch-10 |
| 11 | Supply and Fixing of sign board I/C all Complete work etc (Black Granite_) Please Enable Macros to View BoQ information |