| 1 | Item Description/ Heading |
| 2 | Dismantling of 10” dia MS pipe line as per instruction of Work I/C. |
| 3 | Dismantling of 8” dia MS pipe line as per instruction of Work I/C. |
| 4 | Dismantling of 6” dia MS pipe line as per instruction of Work I/C. |
| 5 | Shifting of 10” dia dismantled MS pipe line to loading side. |
| 6 | Shifting of 8” dia dismantled MS pipe line to loading side. |
| 7 | Shifting of 6” dia dismantled MS pipe line to loading side. |
| 8 | Loading & unloading of 10” dia pipe from dismantling site to different other site in mines area. |
| 9 | Loading & unloading of 8” dia pipe from dismantling site to different other site in mines area. |
| 10 | Loading & unloading of 6” dia pipe from dismantling site to different other site in mines area. |
| 11 | Laying, alignment & fitting of 8” dia pipe line as per instruction of Work I/C |
| 12 | Laying, alignment & fitting of 6” dia pipe line as per instruction of Work I/C |
| 13 | Shifting of 8” dia pipe from unloading place to fitting place. |
| 14 | Shifting of 6” dia pipe from unloading place to fitting place. |
| 15 | Cost of Nuts & Bolts for fitting of 8”/6” dia pipe line. |
| 16 | Cutting of joint packing 8” dia by old conveyor belt. |
| 17 | Cutting of joint packing 6” dia by old conveyor belt. |
| 18 | Dismantling of 8” dia Suction pipe at different sumps of Mines. |
| 19 | Re-fitting of 8” dia Suction pipe at different sumps of Mines. |
| 20 | Dismantling of 8” dia NRV/Sluice valve as per instruction of Work I/C. |
| 21 | Fitting of 8” dia NRV/Sluice valve as per instruction of Work I/C. |
| 22 | Dismantling of 8\\" dia/ 3 Mtr long Jetting hose as per instruction of Work I/C. |
| 23 | Fitting of 8\\" dia (3 Mtr long) Jetting Hose as per instruction of Work I/C. |
| 24 | Dismantling of different pump set including dismantling of suction pipe line etc. |
| 25 | Loading & Unloading of 6” dia pipe from Central Store to Colliery Store. |
| 26 | Dismantling of 06 Mtr long 6” dia Jetting Hose. |
| 27 | Fitting of 6 Mtr Long 6” dia Jetting Hose. |
| 28 | Dismantling of HDPE pipe. |
| 29 | Leakage rectifying of 8” dia pipe by earth cutting, dismantling, welding & refilling, etc. |
| 30 | Inter Connection of pipe line at different places in mines premises. |
| 31 | Modification/ renovation of base plate by gas cutting & Welding. |
| 32 | Dismantling & remaking of pump Motor shed on pontoon. |
| 33 | Matching of 8\\"/10\\" dia new pipe line with another existing pipe line by gas cutting and welding. |
| 34 | Making of 10\\" dia to 8\\" dia reduce by gas cutting & Welding. |
| 35 | Making 8” dia to 6” dia reducer by gas cutting and Welding. |
| 36 | Making 12” to 10” dia reducer by gas cutting & welding. |
| 37 | Making of 8” dia short Piece by Cutting & Welding. |
| 38 | Making of 6” dia Short Piece by gas Cutting & Welding etc. |
| 39 | Making of 8” dia Bend by Cutting & Welding. |
| 40 | Making of 6” dia Bend by Cutting & Welding. |
| 41 | Shifting of float and extension/shorting of delivery pipe line as per instruction of Work I/C. |
| 42 | Installation of different pumps on Poontoon, alignment with Motor etc. |
| 43 | Loading & unloading of Pump Motor set from E&M workshop to work site & Vice versa. |
| 44 | Dismantling & re-erection of tanker loading point for Mines premises. |
| 45 | Leakage rectification of 6” dia pipe line |
| 46 | Loading & Unloading different kind of materials for R/Store to Colliery Store. |
| 47 | Welding of 8\\" dia MS Flanges: 3.14 x 206 x mm x 500 Nos. |
| 48 | Welding of 6” dia MS Flanges: 3.14 x 156 x mm x 200 Nos. |
| 49 | Dismantling of old Crossing pipe as per instruction of Work I/C. |
| 50 | Road Crossing for 8\\"/6\\" dia pipe line at different places in Mines. |
| 51 | Changing of rotating Unit by upper casing lifting and refitting etc. manually. |
| 52 | Total impact of GST plus Labour Cess [@ 1 % (BOCW Cess to be deducted from the RA bill as per the value of the work progress)] for the purpose of CTC Please Enable Macros to View BoQ information |