| 1 | Dismantling clearing away carefully stacking materials usefull for reused Brick / stone masonry in cement mortar walls under 3m high etc., complete and as directed by the depatmental officers. |
| 2 | Removal of For Doors & windows including removal of frames, hinges and fastenings ect.., |
| 3 | Removal of Gyp board partition upto a ceiling height of 4.5m from floor level. |
| 4 | Supplying and fixing the Wall Panelling with the following specification fixing horizontally and vertically in position of wall. Fixing the water proof ply wood 9mm thick board over the country wood planks. Over the ply wood OST sheet of 4mm thick will be fixed with necessary screws and fevicol giviing neat finish. The top will be finished with two coats of sanding polishing. The surface will be finished with necessary design as directed by the Departmental Officers. The rate inclusive of all materials, labour power and conveyance of materials to the work site, loading & unloading etc., and as per drawing and design by the Departmental Officers. The water proof ply wood and OST sheet and other materials to be used shall be got approved by the Executive Engineer concerned before use on work, etc., complete as per standard specification. |
| 5 | Dismantling for Plywood sheet 12mm thick including cutting cup washer & scew etc.,complete complying with standard specification and as directed by the departmental officers. |
| 6 | Brick partition walls of 11.50cm thickness using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 in Cement Mortar 1:3 (One Cement and Three CS Sand) using hoop iron reinforcement if found necessary including Cost of Mortar Plasticizer, curing etc. complete complying with standard specification and as directed by the departmental officers. (Hoop iron reinforcement will be measured and paid for separately) |
| 7 | In Ground floor |
| 8 | In First floor |
| 9 | Brick work in following Cement Mortar using best quality Fly ash Brick of size 230x110x75mm with class designation of 7.5 conforming to IS 13757-1993 or IS 12894-2002 for foundation and basement including Cost of Mortar Plasticizer, curing, etc., complete complying with standard specification and as directed by the departmental officers. Brickwork shall be done as per IS 2212-1991 adopting English Bond generally. other type of bond shall be done as directed by the Executive Engineer in charge. |
| 10 | In Foundation and Basement |
| 11 | In Ground floor |
| 12 | In First floor |
| 13 | In Second floor |
| 14 | Refixing of Aluminium and other partition For Doors & windows including removal of frames, hinges and fastenings ect.., |
| 15 | Providing granolithic floor finish of the following thickness with plain cement concrete 1:2:4 (One Cement, Two Crushed Stone Sand and Four aggregate) using 6 to12mm gauge hard broken stone jelly including laying, finishing and the top rubbed smooth with power trowel, thread lining, curing etc. complete complying with standard specification and as directed by the departmental officers. (The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers) |
| 16 | 25mm thick |
| 17 | Supplying, fabricating, erecting and fixing Hilux (or) equivalent board false ceiling upto a ceiling height of 4.5m from floor level - Using Perforated sheet 10mm thick |
| 18 | Supplying and painting the walls with two coats of wall putty as instructed by the departmental officers including preparation of surface curing, etc., complete in all floors complying with standard specifications (The wall putty shall be got approved by the Executive Engineer before use of work). |
| 19 | Providing two legged scaffolding using 15cm diameter blue-gum posts or casuarina posts of best quality bamboo posts of 4m over all length (3m+0.5m projection+0.5m into the ground) the distance between the two rows being 1.25m and the spacing ofposts being 2m in both the rows with two horizontal posts with 0.5m overlap on either side and braces at2m c/c including longitudinal and transverse middle braces to step up and providing a platform with country wood planks of 40mm thick and 1m width etc.,in a complete form using coir and nails 1m run. |
| 20 | Painting new wood work with two finishing coats of synthetic enamel ready mixed paint of approved quality and colour over one coat priming coat in all floors including the cost of primer etc., complete complying with standard specification and as directed by the departmental officers. (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 21 | Earth work excavation for foundation by manual means for Isolated, Combined and Other type foundations in all soils and sub-soils and to full depth as may be directed except in rock requiring blasting inclusive of shoring shuttering, bailing out water wherever necessary and depositing the surplus earth within the compound in places shown by the departmental officers with an initial lead of 10 mts and initial lift of 2.00mts. and clearing and levelling the site, etc., complete complying with standard specification and as directed by the departmental officers. |
| 22 | Supplying and filling in foundation, basement, etc with filling crushed stone sand in layers of not more than 15 cm thick well watered, rammed and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 23 | Cement Concrete 1:5:10 (One Cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken granite stone jelly for foundation including dewatering wherever necessary and laid in layers of not more than 15 cm thick well rammed, consolidated and including curing etc. complete complying with standard specification and as directed by the departmental officers. -Mixing by manual means |
| 24 | Plastering with Cement Mortar 1:5 (One cement and Five Plastering sand), 12mm thick in all floors including mortar plasticizer at 200ml per 50Kg of cement used, curing etc. complete complying with standard specification and as directed by the departmental officers. |
| 25 | Supply and filling in foundation and basement with Gravel in layers of not more than 15cm.thick well rammed watered and compacted with surface vibrator, watered and consolidated etc. complete complying with standard specification and as directed by the departmental officers. |
| 26 | Cement Concrete 1:5:10 (One cement, Five crushed stone sand and Ten hard broken stone jelly) using 40 mm gauge hard broken jelly for flooring including laying,nsolidating, finishing, rendering the top surface rough to receive the floor, curing, etc. complete multiplying with standard specification and as directed by the departmental officers. The rate is inclusive of necessary planking for panelling wherever necessary and as directed by the departmental officers -Mixing by Manual means |
| 27 | Supplying and erecting steel centering including necessary supports for plane surfaces for Reinforced Cement Concrete works such as column footings, column pedestals, plinth beams, grade beams, staircase steps, Sill slabs etc. which require only nominal strutting using mild steel sheets of size 90cm x 60cm and 10 BG stiffened with welded mild steel angles of size 25mm x 25mm x 3 mm for boarding, laid with silver oak joists of size 10cm x 5cm & 7.5cm x 5cm as support runner , vertical stiffener, side support and Top Horizontal stiffener spaced at about 60cm to 90cm centre to centre or at suitable intervals etc. complete in all floors complying with standard specifcation. (Payment for centering shall be given after the concrete is laid). |
| 28 | Providing and laying in position, standardised concrete Mix M-20 Grade by insitu machine mix concrete adopting weighing batch method in accordance with IS 456 using 20mm and down graded hard broken granite stone jelly for all RCC items of works with minimum cement content of 325 kg/m3 and maximum water cement ratio of 0.55, including admixture (plasticiser / super plasticiser) in recommended proportions as per IS:9103 to accelerate, retard setting of concrete, improve workability without inspiring strength and durability with about (5 Cu.m) 7730 kg. of 20mm machine crushed stone jelly and with about (3.3 Cu.m) 5156 kg. of 10-12mm machine crushed stone jelly and with about (4.79 cu.m) 7670 kg. of crushed stone sand, but excluding cost ofreinforcement grill and fabricating charges, centering and shuttering and also including laying,vibrating with mechanical vibrators, finishing, curing, etc. and providing fixtures like fan clamps in the RCC floor/ roof slabs wherever necessary without claiming extra, etc.,complete complying with standard specification and as directed by the departmental officers. The coarse and fine aggregates to be used should comply with the requirements of IS standards. (No separate payment will be made by the Department for the excess usage of materials). |
| 29 | Supplying, fabricating and placing in position Mild Steel / Ribbed Tor Steel grills for all RCC works as per design given including cost of steel and G.I. binding wire in all floors etc. complete complying with standard specification. (Contractor has to make his own arrangements for the supply of steel and binding wire) |
| 30 | Painting two coats of newly plastered wall surface with ready mixed plastic emulsion paint of first class quality and of approved colour over a priming coat including thorough scrapping, clean removal of dirt, and including necessary plaster of paris putty, wherever required etc., complete complying with standard specification and as directed by the departmental officers. |
| 31 | Painting Old iron works such as steel doors, windows, ventilators, window bars, balustrades etc., with Two coats of best approved first quality and colour of synthetic enamel paint in all floors etc., complete complying with standard specification and as directed by the departmental officers (The make, quality and colour of paint should be got approved by the Executive Engineer before use on works.) |
| 32 | Engaging NMR for Cleaning,shiffing of table chairs, from the respective are to near by vacant portion in Ground floor, First floor, and Second floorhas instructed by the departmental officers. Shifting the benches, desks,tables, steel racks and chaires from where it were or stocked and conveying and olacing in position at classroom - Mazdoor class I |
| 33 | Hire Charges for Providing Weldmesh over Casurina poles for counting center area to a height 2.40m casurina poles support to a height of 3.30m using casurina poles 8cm to 10 cm to tie with walls including weld mesh 7.5x2.5cm enclosoure using C.W reepers of 50x25mm cost of nails labour charges ect., complete and removing the same after the counting is over considering 12m casurina and as directed by the departmental officers. |
| 34 | Hire charges for barricading arrangements using casurina poles 10cm to 13cm at 0.75m centre to centre which is fixed verticaly 3.3mm above Floor level fixing. Vertical post are connected by using 8 to 10cm dia casurina poles in horizontal direction for height 2.40m floor level in 5nos ties and tied with new coir rope provided in all places and removing the same after the function is over complete as directed by the departmental officers. |
| 35 | Hire Charges for temporary G.I sheet shed using casurina props vertically for post and ties horizontally at top for purlins with necessary slope and GI fixing GI sheet above the purline ect.,omplete complying with standard specification. In cluding all labour charges, transportation dismantling and removing ect., |
| 36 | Supplying and fixing of M.S.grill of approved design for open courtyard, grill, grill work to doors and window openings etc., using necessary mild steel flats for inner and outer members which should be fixed on edges including priming coat of best approved quality red oxide primer etc., complete complying with standard specification. |
| 37 | Supplying , fixing and roofing with colour galvalume sheet of 0.47mm thick with all necessary accessories such as J/V bolt and nuts of suitable length with suitable bitumen washers complete complying with standard specification and as directed by the departmental officers. |
| 38 | Supplying and fixing with Sign Board arrangements with necessary etc., complete |
| 39 | Hire Charges for Providing of chamina of suitable size in appropriate location using props verticaly fot post and tied with rope and providing chamina cloth by fixing it in the propos ect.,omplete complying with standard specification. In cluding all labour charges, transportation removing ect., |
| 40 | Hire Charges for Providing of Plastic chairs at the appropriate location in the counting Hall and waitting halls ect.,omplete complying with standard specification. In cluding all labour charges, transportation removing ect., |
| 41 | Hire Charges for Engaging Earth Movers machinary for removing the masonary debries transportating of debries and dumping inside the campus and also leveling in the site etc., and as driected by the departemental officers. |
| 42 | Hire Charges for Engaging of Earth Excavator - wheeled backhoe loader - 0.5m capacity machinary for removing the root of plant thorns bushes Juliflora masonary debries and also leveling in the site etc., and as driected by the departemental officers. |
| 43 | Add GST Please Enable Macros to View BoQ information |