| 1 | (A) Dismantling, Fabrication and Erection of Apron Feeder Chute of Receiving section of Bina CHP |
| 2 | Dismantling / Cutting and shifting of old chute and shifting the un-used material to the store |
| 3 | Dismantling of rubber / Polymate liners |
| 4 | Shifting from the store cutting, shaping fabrication and erection of chute with painting with ready mixed paints of approved brand and manufacturing in all shades to give an even shade (two or more coats) |
| 5 | Shifting to the site and installation of rubber & Polymate liners in the chute |
| 6 | Supply of MS nut, bolts and washers of size as instructed by Engineer Incharge as per site requirement |
| 7 | (B) Dismantling, Fabrication and Erection of Apron Feeder Discharge Chute of Receiving section of Bina CHP |
| 8 | Dismantling / Cutting and shifting of old chute and shifting the un-used material to the store |
| 9 | Dismantling of rubber / Polymate liners |
| 10 | Shifting from the store cutting, shaping fabrication and erection of chute with painting with ready mixed paints of approved brand and manufacturing in all shades to give an even shade (two or more coats) |
| 11 | Shifting to the site and installation of rubber & Polymate liners in the chute |
| 12 | Supply of MS nut, bolts and washers of size as instructed by Engineer Incharge as per site requirement |
| 13 | (C) Dismantling, Fabrication and Erection of 2C Discharge Chute of Receiving section of Bina CHP |
| 14 | Dismantling / Cutting and shifting of old chute and shifting the un-used material to the store |
| 15 | Dismantling of rubber / Polymate liners |
| 16 | Shifting from the store cutting, shaping fabrication and erection of chute with painting with ready mixed paints of approved brand and manufacturing in all shades to give an even shade (two or more coats) |
| 17 | Shifting to the site and installation of rubber & Polymate liners in the chute |
| 18 | Supply of MS nut, bolts and washers of size as instructed by Engineer Incharge as per site requirement |
| 19 | (D) Dismantling, Fabrication and Erection of 3C Discharge Chute of Transfer section of Bina CHP |
| 20 | Dismantling / Cutting and shifting of old chute and shifting the un-used material to the store (1.5 km) |
| 21 | Dismantling of rubber liners |
| 22 | Shifting from the store cutting, shaping fabrication and erection of chute with painting with ready mixed paints of approved brand and manufacturing in all shades to give an even shade (two or more coats) |
| 23 | Shifting to the site and installation of rubber liners in the discharge chute |
| 24 | Supply of MS nut, bolts and washers for fixing rubber liners |
| 25 | (E ) Dismantling, Fabrication and Erection of 4C Discharge Chute of Transfer section of Bina CHP |
| 26 | Dismantling / Cutting and shifting of old chute and shifting the un-used material to the store (1.5 km) |
| 27 | Dismantling of rubber liners |
| 28 | Shifting from the store cutting, shaping fabrication and erection of chute with painting with ready mixed paints of approved brand and manufacturing in all shades to give an even shade (two or more coats) |
| 29 | Shifting to the site and installation of rubber liners in the discharge chute |
| 30 | Supply of MS nut, bolts and washers for fixing rubber liners |
| 31 | (F) Dismantling, Fabrication and Erection of 5C Discharge Chute of Transfer section of Bina CHP |
| 32 | Dismantling / Cutting and shifting of old chute and shifting the un-used material to the store |
| 33 | Dismantling of rubber / Polymate liners |
| 34 | Shifting from the store cutting, shaping fabrication and erection of chute with painting with ready mixed paints of approved brand and manufacturing in all shades to give an even shade (two or more coats) |
| 35 | Shifting to the site and installation of rubber & Polymate liners in the chute |
| 36 | Supply of MS nut, bolts and washers of size as instructed by Engineer Incharge as per site requirement |
| 37 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |