Supply Of Manufacturing, Supplying, And Field Trial Of (I) Pre-Stressed Concrete Wider Basesleepers Fitted With Under Sleeper Pad For 60 Kg 1 In 12 Turn Out To Rdsosdrg. No. T - 4218 (General Layout) With Latest Alteration /Amendment And To Irsspecif-Odisha
TDR : 54901171
Tender Notice
BOQ
16 Days Left
Odisha
Supply Of Manufacturing, supplying, and field trial of (i) Pre-stressed Concrete Wider BaseSleepers fitted with Under Sleeper Pad for 60 Kg 1 in 12 Turn Out to RDSOsDrg. No. T - 4218 (General layout) with latest alteration /amendment and to IRSspecif
Manufacture and supply of Pre-stressed Concrete Wider Base Sleepers fitted with Und er Sleeper Pad for 60 Kg 1 in 12 Turn Out to RDSO's Drg. No. T - 4218 (General layout) with latest alt eration/amendment and to IRS specifications no. T-45(4th Revision) March 2021 (Each set consists of 96 sleepers as per RDSO Layout Drg. no. T-4218) . [ Warranty Period: 60 Months after the date of delivery ] ]
2
Manufacture and supply of Pre-stressed Concrete Wider Base Sleepers fitted with Und er Sleeper Pad for Bridge Approach sleepers for 25T Axle Load as per RDSO's Drawing No. T-8970 to T- 8978 with latest alteration /amendment and and to IRS specifications no. T-39 (6th Revision) Marc h 2021 with corrigendum No. 1.[T-8970-3 nos. sleepers and T-8971 to T-8978 - 8 nos. sleepers] [War ranty Period: 60 Months after the date of delivery ] [ Warranty Period: 60 Months after the date of delivery ] ]
3
Manufacture and supply of Pre-stressed Concrete normal Wider Base Sleepers (beyon d 100mt. of Bridge Approach) fitted with Under Sleeper Pad to drawing No. RDSO/T-8746 and to IRS specifications no. T-39 (6th Revision) March 2021 with corrigendum No. 1. [ Warranty Period: 60 M onths after the date of delivery ] ]
We takes all possible care for accurate & authentic tender information, however Users
are requested to refer Original source of Tender Notice / Tender Document published by
Tender Issuing Agency before taking any call regarding this tender.