| 1 | ((i)Transportation, installation, commissioning, extension of 1000mm wide, 280 meter long conveyor belt from 19L/12WD to 27L/12WD for development of Panel No.TG-1/P1 in RVIIA Seam. |
| 2 | Transportation & installation of complete drive drum driven drum with gear, motor, base frame -12.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-280mtr @106Kg/mtr =29.68MT +6 times Tail end extension-6MT= total weight =59.28 MT (1000mm wide x 280mtr long, 90kWx2, 550V belt conveyor in RVIIA seam from 19L/12WD to 27L/12WD for TG1 panel of LHCM) |
| 3 | Fitting of tail end and discharge scraper. |
| 4 | Belt laying including transporting of belt, jointing, tensioning, trial run etc |
| 5 | Foundation bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos |
| 6 | Cleaning of coal & unused materials before installation job |
| 7 | Making and fabrication of new discharge unit |
| 8 | Making and fabrication of Load table |
| 9 | Fencing of drive ,loop take up & tail end . |
| 10 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. |
| 11 | Cost of M.S. Nut bolts & washers |
| 12 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines |
| 13 | Drive base frame , Loop take up base & discharge base cement concrete |
| 14 | ii)Transportation, installation, commissioning, extension and dismantling of 1000mm wide, 490 meter long conveyor belt from 27L/12WD to 4rL/12WD for development of Panel no.TG-2/P2 of RVIIA seam.) |
| 15 | Transportation & installation of complete drive drum driven drum with gear motor base frame -12.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-490mtr @106Kg/mtr =51.94MT +11 times Tail end extension-11MT= total weight =86.54 MT (1000mm wide x 490mtr long, 90kWx2, 550V belt conveyor in RVIIA seam from 27L/12WD to 41L/12WD for TG2 panel of LHCM) |
| 16 | Fitting of tail end and discharge scraper. |
| 17 | Belt laying including transporting of belt, jointing, tensioning, trial run etc |
| 18 | Foundation bolting for fitting of drive unit , discharge unit , loop take up & tail end etc =120nos |
| 19 | Cleaning of coal & unused materials before installation job |
| 20 | Making, and fabrication of Load table |
| 21 | Making and fabrication of new discharge unit |
| 22 | Fencing of drive ,loop take up & tail end . |
| 23 | Making vertical support from roof and floor for hanging the conveyor structure from drive head to discharge by welding, gas cutting etc. considering cost of consumables. |
| 24 | Dismantling of complete drive drum driven drum with gear motor base frame -12.5MT+discharge unit-2.5MT+tail end -1MT+Load table-1MT+loop take up with tension trolley drum-3.60MT+Fix unit-1MT+motor, winch starter & switches cables etc -2.0MT+1000mm wide conveyor structure with top, bottom roller & foot stool-490mtr @106Kg/mtr =51.94MT = total weight =75.64 MT |
| 25 | Taken out and coiling of belt |
| 26 | Cost of M.S. Nut bolts & washers |
| 27 | Cost of Belt fastener/joint E-35 Comb and grip type suitable for Mato make machine available in mines |
| 28 | Drive base frame , Loop take up base & discharge base cement concrete |
| 29 | Total impact of GST for the purpose of CTC Please Enable Macros to View BoQ information |